If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0525192203000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.500186,"lon":-116.721744,"icon":""}]} |
Location: 00/03-22-052-19W5/0 | |
Location Alias: 00/03-22-52-19 W5M | |
Location Alias 2: 00/03-22-052-19 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 5 | |
Range: 19 | |
Section: 22 | |
County/Municipality: Yellowhead County | |
Well Name: SEAGULL ET AL EDSON 3-22-52-19 | |
Operator Name: Enerplus Corporation | |
License Number: 0071153 | |
License Date: 1978-08-04 | |
License Status: Abandoned | |
Spud Date: 1978-08-15 | |
Final Drill Date: 1978-11-28 | |
Well Total Depth: 4241.00 m | |
Surface Hole Latitude: 53.500186 | |
Surface Hole Longitude: -116.721744 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-08-04 | Obtained License |
1978-09-10 | Drill Stem Test Performed |
1978-09-12 | Drill Stem Test Performed |
1978-09-22 | Drill Stem Test Performed |
1978-10-02 | Drill Stem Test Performed |
1978-10-09 | Kick Occurred |
1978-10-20 | Drill Stem Test Performed |
1978-10-23 | Production Casing Operation Performed |
1978-11-28 | Finished Drilling |
1983-08-18 | Well Mode changed to Drilled and Cased |
2001-03-07 | Well Log Performed |
2001-03-08 | Well Log Performed |
2001-03-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-03-09 | Perforation Treatment Performed - Jet Perforation |
2001-03-09 | Well Log Performed |
2001-03-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2001-03-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2001-03-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-03-15 | Perforation Treatment Performed - Jet Perforation |
2001-03-15 | Perforation Treatment Performed - Remedial Casing |
2001-03-15 | Plug Back Performed |
2001-03-15 | Well Fluid changed to Gas |
2001-03-15 | Well Log Performed |
2001-03-15 | Well Mode changed to Testing |
2001-03-16 | Well Abandoned |
2001-03-16 | Well Fluid changed to Gas |
2001-03-16 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2001-03-09 | Packing Device Capped w/Cement | 3116.00 | 3120.00 | 0 |
2001-03-09 | Perforation | 3048.00 | 3050.00 | 17 |
2001-03-09 | Perforation | 3056.00 | 3059.00 | 17 |
2001-03-11 | Acid Treatment | 3048.00 | 3059.00 | 0 |
2001-03-12 | Acid Treatment | 3048.00 | 3059.00 | 0 |
2001-03-15 | Packing Device Capped w/Cement | 3031.00 | 3039.00 | 0 |
2001-03-15 | Perforation | 505.00 | 506.00 | 72 |
2001-03-15 | Remedial Casing Cementing | 505.00 | 506.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1978-10-09 | Kick | 3068.00 | 3068.00 |
For data sources see[6]