X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525222202002

Well Details

Well ID: 0525222202002
Loading map...
Location: 00/02-22-052-22W5/2
Location Alias: 00/02-22-52-22 W5M
Location Alias 2: 00/02-22-052-22 W5/02
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 22
Section: 22
County/Municipality: Yellowhead County
Well Name: POC ET AL OBED 2-22-52-22
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0083962
License Date: 1980-07-07
License Status: Suspension
Spud Date: 1980-08-20
Final Drill Date: 1981-01-07
Well Total Depth: 4357.00 m
Surface Hole Latitude: 53.495656
Surface Hole Longitude: -117.157951

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-07-07 Obtained License
1980-08-20 Direction Drilling Operation Performed - 98
1981-01-07 Finished Drilling
1981-01-11 Drill Stem Test Performed
1981-01-14 Liner Casing Operation Performed
1981-01-20 Perforation Treatment Performed - Jet Perforation
1981-03-12 Well Log Performed
1981-03-14 Perforation Treatment Performed - Jet Perforation
1981-05-15 Perforation Treatment Performed - Jet Perforation
1981-05-16 Perforation Treatment Performed - Cement Squeeze
1981-05-17 Perforation Treatment Performed - Jet Perforation
1981-05-18 Perforation Treatment Performed - Cement Squeeze
1981-05-24 Perforation Treatment Performed - Jet Perforation
1981-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-28 Perforation Treatment Performed - Cement Squeeze
1981-07-03 Perforation Treatment Performed - Jet Perforation
1981-07-06 Perforation Treatment Performed - Fractured
1981-08-21 Perforation Treatment Performed - Cement Squeeze
1981-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-11-11 Perforation Treatment Performed - Jet Perforation
1981-11-16 Perforation Treatment Performed - Fractured
1981-11-28 Perforation Treatment Performed - Jet Perforation
1981-11-29 Perforation Treatment Performed - Jet Perforation
1981-12-03 Perforation Treatment Performed - Fractured
1981-12-16 Perforation Treatment Performed - Jet Perforation
1981-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-12-30 Well Mode changed to Drilled and Cased
1988-09-27 Well Log Performed
1998-11-04 Well Began Production
1998-11-04 Well Fluid changed to Gas
1998-11-04 Well Mode changed to Flowing
2002-12-09 Well Log Performed
2002-12-10 Perforation Treatment Performed - Cement Squeeze
2003-01-25 Well Log Performed
2003-01-26 Well Log Performed
2003-03-25 Well Log Performed
2003-03-27 Well Log Performed
2003-04-24 Well Log Performed
2003-05-14 Well Log Performed
2003-05-19 Well Log Performed
2003-05-20 Perforation Treatment Performed - Jet Perforation
2003-05-20 Well Log Performed
2003-05-21 Perforation Treatment Performed - Jet Perforation
2003-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-01-01 Well Fluid changed to Gas
2004-01-01 Well Mode changed to Suspended
2010-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-18 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1980-08-20 3733.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-01-20 Perforation 4209.50 4225.00 0
1981-06-28 Cement Squeeze 2479.00 2485.00 0
1981-07-03 Perforation 2479.00 2485.00 13
1981-07-06 Fracture 2479.00 2485.00 0
1981-08-21 Cement Squeeze 2479.00 2485.00 0
1981-10-01 Acid Treatment 4209.50 4225.00 0
1981-11-11 Acid Treatment 4209.50 4225.00 0
1981-11-11 Perforation 4209.50 4223.70 7
1981-11-16 Fracture 4209.50 4225.00 0
1981-11-28 Perforation 4160.00 4166.00 13
1981-11-29 Perforation 4110.00 4118.00 13
1981-03-14 Perforation 4246.00 4249.00 13
1981-11-29 Perforation 4149.50 4151.00 13
1981-12-03 Fracture 4110.00 4166.00 0
1981-12-16 Perforation 3560.50 3574.00 13
1981-12-20 Acid Treatment 3560.50 3574.00 0
2002-12-10 Cement Squeeze 3560.50 3574.00 0
2003-05-20 Perforation 4143.00 4153.00 20
2003-05-20 Perforation 4112.00 4117.00 20
2003-05-20 Perforation 4123.00 4137.00 20
2003-05-21 Perforation 4159.50 4167.50 20
2003-06-17 Acid Treatment 4143.00 4153.00 0
1981-05-15 Perforation 2505.00 2505.30 0
2003-06-17 Acid Treatment 4112.00 4117.00 0
2003-06-17 Acid Treatment 4123.00 4137.00 0
2003-06-17 Acid Treatment 4159.50 4167.50 0
2010-03-18 Packing Device Capped w/Cement 3528.70 3530.70 0
1981-05-16 Cement Squeeze 2505.00 2505.30 0
1981-05-17 Perforation 2450.00 2450.30 13
1981-05-18 Cement Squeeze 2450.00 2450.30 0
1981-05-24 Perforation 2479.00 2485.00 13
1981-06-12 Acid Treatment 2479.00 2485.00 0
1981-06-13 Acid Treatment 2479.00 2485.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 1464 0.0 0.0 0.0
1999 8536 0.0 0.0 0.0
2000 8107 0.0 0.0 0.0
2001 8344 0.0 0.0 0.0
2002 6006 0.0 0.0 0.0
2003 72 0.0 0.0 0.0

For data sources see[6]

References