X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525233005000

Well Details

Well ID: 0525233005000
Loading map...
Location: 00/05-30-052-23W5/0
Location Alias: 00/05-30-52-23 W5M
Location Alias 2: 00/05-30-052-23 W5/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 23
Section: 30
County/Municipality: Yellowhead County
Well Name: TOURMALINE DALEHST 5-30-52-23
Operator Name: Tourmaline Oil Corp.
License Number: 0400604
License Date: 2008-09-08
License Status: Suspension
Spud Date: 2008-10-03
Final Drill Date: 2008-10-31
Well Total Depth: 3509.00 m
Surface Hole Latitude: 53.517313
Surface Hole Longitude: -117.387305

For data sources see[1][2]

Well History

Date Event
2008-09-08 Obtained License
2008-10-06 Surface Casing Operation Performed
2008-10-14 Well Log Performed
2008-10-18 Intermediate Casing Operation Performed
2008-10-31 Finished Drilling
2008-10-31 Well Mode changed to Drilled and Cased
2008-11-01 Perforation Treatment Performed - Jet Perforation
2008-11-01 Perforation Treatment Performed - Remedial Casing
2008-11-01 Well Log Performed
2008-11-02 Production Casing Operation Performed
2008-11-04 Rig Released
2008-11-09 Perforation Treatment Performed - Jet Perforation
2008-11-14 Perforation Treatment Performed - Fractured
2008-11-15 Perforation Treatment Performed - Jet Perforation
2008-11-16 Perforation Treatment Performed - Fractured
2008-11-17 Perforation Treatment Performed - Jet Perforation
2008-11-18 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-11-01 Perforation 349.00 350.00 12
2008-11-15 Perforation 3119.00 3120.00 3
2008-11-15 Perforation 3110.00 3111.00 5
2008-11-15 Perforation 3072.00 3073.00 4
2008-11-16 Fracture 3072.00 3247.00 0
2008-11-17 Perforation 2936.00 2937.00 3
2008-11-17 Perforation 2515.00 2516.00 3
2008-11-17 Perforation 2506.00 2507.00 7
2008-11-17 Perforation 2498.00 2499.00 7
2008-11-18 Fracture 2498.00 2937.00 0
2008-11-01 Remedial Casing Cementing 349.00 350.00 0
2008-11-09 Perforation 3452.00 3453.00 6
2008-11-09 Perforation 3433.00 3434.00 8
2008-11-09 Perforation 3425.00 3426.00 8
2008-11-14 Fracture 3425.00 3453.00 0
2008-11-15 Perforation 3246.00 3247.00 3
2008-11-15 Perforation 3231.00 3232.00 4
2008-11-15 Perforation 3203.00 3204.00 3

For data sources see[4]



References