X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525253003000

Well Details

Well ID: 0525253003000
Loading map...
Location: 00/03-30-052-25W5/0
Location Alias: 00/03-30-52-25 W5M
Location Alias 2: 00/03-30-052-25 W5/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 25
Section: 30
County/Municipality: Yellowhead County
Well Name: TOURMALINE ET AL HINTON 3-30-52-25
Operator Name: Tourmaline Oil Corp.
License Number: 0416776
License Date: 2010-01-05
License Status: Issued
Spud Date: 2010-02-25
Final Drill Date: 2010-07-02
Well Total Depth: 4238.00 m
Surface Hole Latitude: 53.512819
Surface Hole Longitude: -117.677195

For data sources see[1][2]

Well History

Date Event
2010-01-05 Obtained License
2010-02-27 Surface Casing Operation Performed
2010-03-11 Well Log Performed
2010-03-14 Intermediate Casing Operation Performed
2010-03-14 Lost Circulation Occurred
2010-06-30 Well Log Performed
2010-07-02 Finished Drilling
2010-07-02 Well Mode changed to Drilled and Cased
2010-07-03 Well Log Performed
2010-07-05 Production Casing Operation Performed
2010-07-06 Rig Released
2010-07-18 Well Log Performed
2010-07-20 Perforation Treatment Performed - Jet Perforation
2010-07-20 Well Log Performed
2010-07-23 Perforation Treatment Performed - Fractured
2010-07-24 Perforation Treatment Performed - Fractured
2010-07-24 Perforation Treatment Performed - Jet Perforation
2010-07-24 Well Log Performed
2010-07-25 Perforation Treatment Performed - Fractured
2010-07-25 Perforation Treatment Performed - Jet Perforation
2010-07-25 Well Log Performed
2010-07-29 Well Log Performed
2010-07-30 Well Log Performed
2010-10-05 Well Began Production
2010-10-05 Well Fluid changed to Gas
2010-10-05 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-07-20 Perforation 4213.00 4214.00 20
2010-07-24 Perforation 3801.00 3802.00 6
2010-07-25 Fracture 3801.00 4017.00 0
2010-07-25 Perforation 3212.00 3213.00 15
2010-07-25 Perforation 3199.00 3200.00 12
2010-07-25 Fracture 3199.00 3213.00 0
2010-07-23 Fracture 4213.00 4214.00 0
2010-07-24 Perforation 4172.00 4173.00 21
2010-07-24 Perforation 4147.00 4148.00 9
2010-07-24 Fracture 4147.00 4173.00 0
2010-07-24 Perforation 4016.00 4017.00 6
2010-07-24 Perforation 3960.00 3961.00 6
2010-07-24 Perforation 3880.00 3881.00 9
2010-07-24 Perforation 3865.00 3866.00 6

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2136 0.0 0.0 0.0
2011 8740 0.0 0.0 0.0
2012 8711 0.0 0.0 0.0
2013 8710 0.0 0.0 0.0
2014 8692 0.0 0.0 0.0
2015 8603 0.0 0.0 0.0
2016 8742 0.0 0.0 0.0
2017 8507 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8705 0.0 0.0 0.0
2020 2134 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-03-14 Lost Circulation 1503.00 1503.00
2010-03-14 Lost Circulation 1550.00 1550.00

For data sources see[6]

References