X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534142905003

Well Details

Well ID: 0534142905003
Loading map...
Location: 00/05-29-053-14W4/3
Location Alias: 00/05-29-53-14 W4M
Location Alias 2: 00/05-29-053-14 W4/03
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 14
Section: 29
County/Municipality: County of Minburn No. 27
Well Name: LONG RUN WARWICK 5-29-53-14
Operator Name: Long Run Exploration Ltd.
License Number: 0335191
License Date: 2005-07-25
License Status: Abandoned
Spud Date: 2005-08-03
Final Drill Date: 2005-08-06
Well Total Depth: 739.00 m
Surface Hole Latitude: 53.606548
Surface Hole Longitude: -112.039520

For data sources see[1][2]

Well History

Date Event
2005-07-25 Obtained License
2005-08-04 Surface Casing Operation Performed
2005-08-05 Lost Circulation Occurred
2005-08-06 Finished Drilling
2005-08-06 Lost Circulation Occurred
2005-08-06 Well Log Performed
2005-08-06 Well Mode changed to Drilled and Cased
2005-08-07 Production Casing Operation Performed
2005-08-07 Rig Released
2005-08-10 Well Log Performed
2005-08-11 Perforation Treatment Performed - Jet Perforation
2005-08-11 Well Log Performed
2005-11-04 Well Log Performed
2005-11-05 Perforation Treatment Performed - Jet Perforation
2006-07-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-08 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2006-07-08 Plug Back Performed
2006-07-09 Perforation Treatment Performed - Jet Perforation
2006-07-12 Well Began Production
2006-07-12 Well Fluid changed to Gas
2006-07-12 Well Mode changed to Flowing
2009-08-01 Well Fluid changed to Gas
2009-08-01 Well Mode changed to Suspended
2010-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-06-28 Perforation Treatment Performed - Cement Squeeze
2010-06-28 Perforation Treatment Performed - Jet Perforation
2010-06-28 Plug Back Performed
2010-06-28 Well Fluid changed to Gas
2010-06-28 Well Mode changed to Abandoned Zone
2010-06-30 Perforation Treatment Performed - Remedial Casing
2010-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-14 Perforation Treatment Performed - Jet Perforation
2010-09-14 Perforation Treatment Performed - Remedial Casing
2010-10-13 Perforation Treatment Performed - Jet Perforation
2010-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-15 Perforation Treatment Performed - Remedial Casing
2010-12-06 Perforation Treatment Performed - Jet Perforation
2010-12-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-12-11 Perforation Treatment Performed - Remedial Casing
2012-09-27 Well Abandoned
2012-09-27 Well Fluid changed to Gas
2012-09-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-08-11 Perforation 700.50 701.50 17
2010-06-28 Perforation 391.50 393.50 20
2010-06-28 Perforation 391.50 393.70 20
2010-06-30 Remedial Casing Cementing 391.50 393.70 0
2010-09-14 Perforation 391.00 393.00 20
2010-09-14 Remedial Casing Cementing 390.50 393.50 0
2010-09-14 Perforation 390.50 393.50 20
2010-09-14 Packing Device Capped w/Cement 380.50 388.50 0
2010-10-13 Perforation 360.20 362.20 20
2010-10-13 Perforation 360.00 362.00 20
2010-10-15 Packing Device Capped w/Cement 347.00 355.00 0
2005-08-11 Perforation 703.00 704.00 17
2010-10-15 Acid Treatment 360.00 362.20 0
2010-10-15 Remedial Casing Cementing 360.00 362.20 0
2010-12-06 Perforation 190.00 192.00 40
2010-12-06 Perforation 215.00 217.00 40
2010-12-11 Remedial Casing Cementing 215.00 217.00 0
2010-12-11 Remedial Casing Cementing 190.00 192.00 0
2010-12-11 Packing Device Capped w/Cement 95.40 213.00 0
2005-11-05 Perforation 693.00 694.50 17
2006-07-08 Packing Dev Cpd w/Res-Gyp Cem 696.00 698.00 0
2006-07-08 Packing Device Capped w/Cement 680.00 688.00 0
2006-07-09 Perforation 579.50 582.00 17
2010-06-26 Acid Treatment 579.50 582.00 0
2010-06-28 Packing Device Capped w/Cement 566.50 576.00 0
2010-06-28 Cement Squeeze 579.50 582.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 3863 0.0 0.0 0.0
2007 2112 0.0 0.0 0.0
2008 3575 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2005-08-05 Lost Circulation 717.00 717.00
2005-08-06 Lost Circulation 739.00 739.00

For data sources see[6]

References