If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0534143514000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.628321,"lon":-111.957951,"icon":""}]} |
Location: 00/14-35-053-14W4/0 | |
Location Alias: 00/14-35-53-14 W4M | |
Location Alias 2: 00/14-35-053-14 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 053 | |
Meridian: 4 | |
Range: 14 | |
Section: 35 | |
County/Municipality: County of Minburn No. 27 | |
Well Name: PINE CLIFF WARWICK 14-35-53-14 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0215884 | |
License Date: 1998-06-15 | |
License Status: Suspension | |
Spud Date: 1998-07-04 | |
Final Drill Date: 1998-07-06 | |
Well Total Depth: 738.00 m | |
Surface Hole Latitude: 53.628321 | |
Surface Hole Longitude: -111.957951 |
Date | Event |
---|---|
1998-06-15 | Obtained License |
1998-07-04 | Surface Casing Operation Performed |
1998-07-05 | Lost Circulation Occurred |
1998-07-06 | Finished Drilling |
1998-07-06 | Well Log Performed |
1998-07-07 | Production Casing Operation Performed |
1998-07-07 | Rig Released |
1998-07-07 | Well Mode changed to Drilled and Cased |
1998-07-12 | Well Log Performed |
1998-07-14 | Perforation Treatment Performed - Jet Perforation |
1998-07-14 | Well Log Performed |
1998-07-16 | Perforation Treatment Performed - Jet Perforation |
1998-07-16 | Perforation Treatment Performed - Remedial Casing |
1998-07-16 | Well Log Performed |
1998-07-20 | Well Log Performed |
1998-07-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-07-21 | Perforation Treatment Performed - Jet Perforation |
1998-07-21 | Perforation Treatment Performed - Remedial Casing |
1998-07-21 | Well Log Performed |
1998-07-23 | Perforation Treatment Performed - Jet Perforation |
1998-07-23 | Well Log Performed |
1998-07-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-07-27 | Well Log Performed |
1998-07-28 | Perforation Treatment Performed - Jet Perforation |
1998-07-28 | Well Log Performed |
1998-09-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-09-21 | Well Log Performed |
1998-09-22 | Perforation Treatment Performed - Jet Perforation |
1998-09-22 | Well Log Performed |
2008-02-04 | Well Log Performed |
2008-08-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-08-17 | Plug Back Performed |
2008-08-17 | Well Mode changed to Abandoned Zone |
2008-08-18 | Well Log Performed |
2008-09-05 | Perforation Treatment Performed - Jet Perforation |
2008-09-05 | Perforation Treatment Performed - Remedial Casing |
2008-09-05 | Well Log Performed |
2009-01-05 | Well Log Performed |
2009-09-11 | Well Log Performed |
2010-10-14 | Perforation Treatment Performed - Jet Perforation |
2010-10-14 | Well Log Performed |
2010-10-15 | Perforation Treatment Performed - Remedial Casing |
2010-10-16 | Perforation Treatment Performed - Jet Perforation |
2010-10-16 | Well Log Performed |
2010-10-17 | Perforation Treatment Performed - Remedial Casing |
2010-10-18 | Perforation Treatment Performed - Jet Perforation |
2010-10-18 | Well Log Performed |
2010-10-19 | Perforation Treatment Performed - Remedial Casing |
2010-10-29 | Perforation Treatment Performed - Jet Perforation |
2010-11-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-11-04 | Perforation Treatment Performed - Jet Perforation |
2010-11-04 | Well Log Performed |
2010-11-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-11-05 | Perforation Treatment Performed - Jet Perforation |
2010-11-05 | Well Log Performed |
2010-11-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-11-06 | Perforation Treatment Performed - Remedial Casing |
2010-11-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-11-10 | Perforation Treatment Performed - Jet Perforation |
2010-11-10 | Well Log Performed |
2010-11-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-11-13 | Perforation Treatment Performed - Remedial Casing |
2010-11-15 | Perforation Treatment Performed - Remedial Casing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1998-07-14 | Perforation | 557.00 | 557.30 | 36 |
1998-07-28 | Perforation | 674.00 | 674.50 | 20 |
1998-09-21 | Packing Device Capped w/Cement | 662.00 | 670.00 | 0 |
1998-09-22 | Perforation | 561.00 | 562.00 | 20 |
2008-08-17 | Packing Device Capped w/Cement | 550.00 | 558.00 | 0 |
2008-09-05 | Perforation | 379.00 | 381.00 | 20 |
2008-09-05 | Remedial Casing Cementing | 379.00 | 381.00 | 0 |
2010-10-14 | Perforation | 527.00 | 529.00 | 17 |
2010-10-15 | Remedial Casing Cementing | 527.00 | 529.00 | 0 |
2010-10-16 | Perforation | 505.00 | 507.00 | 17 |
2010-10-17 | Remedial Casing Cementing | 505.00 | 507.00 | 0 |
1998-07-16 | Remedial Casing Cementing | 557.00 | 557.30 | 0 |
2010-10-18 | Perforation | 379.00 | 381.00 | 17 |
2010-10-19 | Remedial Casing Cementing | 379.00 | 381.00 | 0 |
2010-10-29 | Perforation | 561.00 | 562.00 | 20 |
2010-11-04 | Perforation | 650.00 | 652.00 | 17 |
2010-11-04 | Acid Treatment | 561.00 | 562.00 | 0 |
2010-11-05 | Perforation | 560.00 | 562.00 | 17 |
2010-11-05 | Perforation | 557.00 | 559.00 | 17 |
2010-11-05 | Packing Device Capped w/Cement | 637.00 | 645.00 | 0 |
2010-11-06 | Remedial Casing Cementing | 557.00 | 562.00 | 0 |
2010-11-06 | Packing Device Capped w/Cement | 542.00 | 552.00 | 0 |
1998-07-16 | Perforation | 180.00 | 181.00 | 36 |
2010-11-10 | Packing Device Capped w/Cement | 516.00 | 524.00 | 0 |
2010-11-10 | Packing Device Capped w/Cement | 494.00 | 502.00 | 0 |
2010-11-10 | Perforation | 439.00 | 441.00 | 17 |
2010-11-10 | Perforation | 390.00 | 392.00 | 17 |
2010-11-13 | Remedial Casing Cementing | 439.00 | 441.00 | 0 |
2010-11-13 | Packing Device Capped w/Cement | 425.00 | 435.00 | 0 |
2010-11-15 | Remedial Casing Cementing | 390.00 | 392.00 | 0 |
1998-07-16 | Remedial Casing Cementing | 180.00 | 181.00 | 0 |
1998-07-21 | Perforation | 131.00 | 131.30 | 36 |
1998-07-21 | Acid Treatment | 131.00 | 131.30 | 0 |
1998-07-21 | Remedial Casing Cementing | 131.00 | 131.30 | 0 |
1998-07-23 | Perforation | 690.00 | 692.00 | 20 |
1998-07-27 | Packing Device Capped w/Cement | 680.00 | 688.00 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1998-07-05 | Lost Circulation | 696.00 | 738.00 |
For data sources see[5]