X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534151407000

Well Details

Well ID: 0534151407000
Loading map...
Location: 00/07-14-053-15W4/0
Location Alias: 00/07-14-53-15 W4M
Location Alias 2: 00/07-14-053-15 W4/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 15
Section: 14
County/Municipality: County of Minburn No. 27
Well Name: PROVIDENT ROYAL PARK 7-14-53-15
Operator Name: Canadian Natural Resources Limited
License Number: 0038420
License Date: 1970-07-15
License Status: RecCertified
Spud Date: 1970-07-16
Final Drill Date: 1970-07-21
Well Total Depth: 792.50 m
Surface Hole Latitude: 53.577520
Surface Hole Longitude: -112.097350

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-07-15 Obtained License
1970-07-21 Finished Drilling
1970-07-23 Production Casing Operation Performed
1971-09-14 Well Mode changed to Drilled and Cased
1974-09-18 Perforation Treatment Performed - Jet Perforation
1975-12-02 Perforation Treatment Performed - Jet Perforation
1975-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-12-06 Perforation Treatment Performed - Abrasa-Jet Perforation
1975-12-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-02-10 Perforation Treatment Performed - Cement Squeeze
1976-02-10 Perforation Treatment Performed - Jet Perforation
1984-10-12 Perforation Treatment Performed - Jet Perforation
1984-10-12 Well Log Performed
1992-09-24 Well Log Performed
1992-09-29 Well Fluid changed to Gas
1992-09-29 Well Mode changed to Testing
1992-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-30 Plug Back Performed
1992-09-30 Well Fluid changed to Gas
1992-09-30 Well Mode changed to Abandoned Zone
1992-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-10-01 Plug Back Performed
1992-10-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-09-18 Perforation 717.50 718.10 13
1984-10-12 Perforation 612.30 612.90 13
1992-09-30 Packing Device Capped w/Cement 597.00 605.00 0
1992-10-01 Packing Device Capped w/Cement 547.00 555.00 0
1975-12-02 Perforation 724.20 724.80 7
1975-12-04 Acid Treatment 724.20 724.80 0
1975-12-06 Packing Device Capped w/Cement 724.20 724.80 0
1975-12-06 Hydra Jet Perforation 717.20 717.80 0
1976-02-10 Perforation 563.90 564.20 13
1976-02-10 Perforation 579.10 579.40 13
1976-02-10 Cement Squeeze 563.90 579.40 0
1976-02-10 Perforation 568.80 569.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 81 0.0 0.0 0.0

For data sources see[5]

References