If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0534151806020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.57738,"lon":-112.206937,"icon":""}]} |
Location: 02/06-18-053-15W4/0 | |
Location Alias: 02/06-18-53-15 W4M | |
Location Alias 2: 02/06-18-053-15 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 053 | |
Meridian: 4 | |
Range: 15 | |
Section: 18 | |
County/Municipality: County of Minburn No. 27 | |
Well Name: BERNUM 102 ROYAL 6-18-53-15 | |
Operator Name: Caltex Resources Ltd. | |
License Number: 0334717 | |
License Date: 2005-07-18 | |
License Status: Abandoned | |
Spud Date: 2005-09-03 | |
Final Drill Date: 2005-09-06 | |
Well Total Depth: 837.00 m | |
Surface Hole Latitude: 53.577380 | |
Surface Hole Longitude: -112.206937 |
Date | Event |
---|---|
2005-07-18 | Obtained License |
2005-09-04 | Surface Casing Operation Performed |
2005-09-06 | Finished Drilling |
2005-09-06 | Production Casing Operation Performed |
2005-09-06 | Rig Released |
2005-09-06 | Well Log Performed |
2005-09-06 | Well Mode changed to Drilled and Cased |
2005-09-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-09-14 | Well Log Performed |
2005-09-15 | Perforation Treatment Performed - Jet Perforation |
2005-09-15 | Well Log Performed |
2006-02-13 | Well Began Production |
2006-02-13 | Well Fluid changed to Gas |
2006-02-13 | Well Mode changed to Flowing |
2006-06-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-06-21 | Perforation Treatment Performed - Jet Perforation |
2006-06-21 | Plug Back Performed |
2006-06-21 | Well Fluid changed to Gas |
2006-06-21 | Well Log Performed |
2006-06-21 | Well Mode changed to Abandoned Zone |
2006-07-05 | Perforation Treatment Performed - Fractured |
2007-10-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-10-16 | Plug Back Performed |
2007-10-17 | Perforation Treatment Performed - Jet Perforation |
2007-10-17 | Well Log Performed |
2010-05-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-05-21 | Plug Back Performed |
2010-05-21 | Well Log Performed |
2010-06-15 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-09-14 | Packing Device Capped w/Cement | 782.00 | 785.00 | 0 |
2005-09-15 | Perforation | 768.00 | 768.60 | 17 |
2006-06-21 | Packing Device Capped w/Cement | 757.00 | 765.00 | 0 |
2006-06-21 | Perforation | 720.00 | 721.50 | 17 |
2006-06-21 | Perforation | 717.50 | 720.00 | 17 |
2006-07-05 | Fracture | 717.50 | 721.50 | 0 |
2007-10-16 | Packing Device Capped w/Cement | 703.00 | 711.00 | 0 |
2007-10-17 | Perforation | 613.20 | 614.80 | 17 |
2010-05-21 | Packing Device Capped w/Cement | 602.00 | 610.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 255 | 0.0 | 0.0 | 0.0 |
For data sources see[5]