If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0534251011000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.564854,"lon":-113.606205,"icon":""}]} |
Location: 00/11-10-053-25W4/0 | |
Location Alias: 00/11-10-53-25 W4M | |
Location Alias 2: 00/11-10-053-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 053 | |
Meridian: 4 | |
Range: 25 | |
Section: 10 | |
County/Municipality: Edmonton | |
Well Name: DOME JASPER PLACE 11-10-53-25 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0012271 | |
License Date: 1956-09-17 | |
License Status: RecExempt | |
Spud Date: 1956-09-24 | |
Final Drill Date: 1956-10-12 | |
Well Total Depth: 1202.70 m | |
Surface Hole Latitude: 53.564854 | |
Surface Hole Longitude: -113.606205 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1956-09-17 | Obtained License |
1956-10-05 | Drill Stem Test Performed |
1956-10-09 | Drill Stem Test Performed |
1956-10-11 | Drill Stem Test Performed |
1956-10-12 | Finished Drilling |
1956-10-13 | Production Casing Operation Performed |
1956-10-27 | Perforation Treatment Performed - Bullet Perforation |
1956-10-31 | Perforation Treatment Performed - Visqueeze |
1957-08-30 | Well Mode changed to Drilled and Cased |
1960-08-29 | Well Began Production |
1960-08-29 | Well Fluid changed to Gas |
1960-08-29 | Well Mode changed to Flowing |
1961-03-09 | Perforation Treatment Performed - Jet Perforation |
1961-03-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1961-03-11 | Perforation Treatment Performed - Cement Squeeze |
1961-03-18 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1961-04-21 | Perforation Treatment Performed - Cement Squeeze |
1961-04-22 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1961-04-22 | Perforation Treatment Performed - Fractured |
1961-05-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1961-06-21 | Well Fluid changed to Crude Oil |
1961-06-21 | Well Mode changed to Pumping |
1962-07-22 | Perforation Treatment Performed - Cement Plug |
1962-07-25 | Well Abandoned |
1962-07-25 | Well Fluid changed to Crude Oil |
1962-07-25 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1956-10-27 | Bullet Perforation | 1164.30 | 1165.60 | 20 |
1961-05-05 | Acid Treatment | 1160.10 | 1161.30 | 0 |
1962-07-22 | Cement Plug | 1143.00 | 1169.20 | 0 |
1956-10-31 | Visqueeze | 1164.30 | 1165.60 | 0 |
1961-03-09 | Perforation | 1172.90 | 1173.50 | 13 |
1961-03-11 | Acid Treatment | 1172.90 | 1173.50 | 0 |
1961-03-11 | Cement Squeeze | 1164.30 | 1173.50 | 0 |
1961-03-18 | Hydra Jet Perforation | 1164.30 | 1164.30 | 0 |
1961-04-21 | Cement Squeeze | 1164.30 | 1164.30 | 0 |
1961-04-22 | Hydra Jet Perforation | 1160.10 | 1161.30 | 0 |
1961-04-22 | Fracture | 1160.10 | 1161.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]