If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0534260106003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.543417,"lon":-113.711034,"icon":""}]} |
Location: 00/06-01-053-26W4/3 | |
Location Alias: 00/06-01-53-26 W4M | |
Location Alias 2: 00/06-01-053-26 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 053 | |
Meridian: 4 | |
Range: 26 | |
Section: 01 | |
County/Municipality: Edmonton | |
Well Name: CEDAR CREEK ACHE 6-1-53-26 | |
Operator Name: MAGA Energy Operations Ltd. | |
License Number: 0146018 | |
License Date: 1990-10-26 | |
License Status: Abandoned | |
Spud Date: 1991-03-13 | |
Final Drill Date: 1991-03-22 | |
Well Total Depth: 1527.00 m | |
Surface Hole Latitude: 53.543417 | |
Surface Hole Longitude: -113.711034 |
Date | Event |
---|---|
1990-10-26 | Obtained License |
1991-03-14 | Surface Casing Operation Performed |
1991-03-15 | Direction Drilling Operation Performed - Deviate |
1991-03-22 | Finished Drilling |
1991-03-22 | Well Mode changed to Drilled and Cased |
1991-03-23 | Well Log Performed |
1991-03-24 | Production Casing Operation Performed |
1991-03-24 | Rig Released |
1991-04-02 | Perforation Treatment Performed - Jet Perforation |
1991-04-08 | Well Log Performed |
1997-03-08 | Perforation Treatment Performed - Jet Perforation |
1997-03-09 | Perforation Treatment Performed - Fractured |
2000-11-02 | Well Began Production |
2000-11-02 | Well Fluid changed to Crude Oil |
2000-11-02 | Well Mode changed to Pumping |
2006-08-30 | Well Fluid changed to Crude Oil |
2006-08-30 | Well Mode changed to Suspended |
2013-09-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2013-09-05 | Plug Back Performed |
2013-09-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2013-09-06 | Perforation Treatment Performed - Jet Perforation |
2013-09-06 | Plug Back Performed |
2013-09-06 | Well Fluid changed to Crude Oil |
2013-09-06 | Well Log Performed |
2013-09-06 | Well Mode changed to Abandoned Zone |
2013-09-07 | Perforation Treatment Performed - Cement Plug |
2013-09-07 | Perforation Treatment Performed - Remedial Casing |
2013-09-08 | Perforation Treatment Performed - Jet Perforation |
2013-09-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2013-09-19 | Perforation Treatment Performed - Cement Plug |
2013-09-19 | Perforation Treatment Performed - Remedial Casing |
2013-09-23 | Well Log Performed |
2013-09-25 | Well Abandoned |
2013-09-25 | Well Fluid changed to Crude Oil |
2013-09-25 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1991-03-15 | 240.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1991-04-02 | Perforation | 1490.50 | 1495.50 | 7 |
2013-09-07 | Cement Plug | 520.00 | 574.50 | 0 |
2013-09-07 | Remedial Casing Cementing | 572.50 | 574.50 | 0 |
2013-09-08 | Perforation | 215.00 | 217.00 | 13 |
2013-09-19 | Packing Device Capped w/Cement | 165.00 | 225.00 | 0 |
2013-09-19 | Cement Plug | 508.00 | 520.00 | 0 |
2013-09-19 | Remedial Casing Cementing | 515.00 | 517.00 | 0 |
2013-09-19 | Remedial Casing Cementing | 215.00 | 217.00 | 0 |
1991-04-02 | Perforation | 1450.50 | 1454.50 | 7 |
1991-04-02 | Perforation | 1377.80 | 1381.50 | 7 |
1997-03-08 | Perforation | 1355.00 | 1361.00 | 7 |
1997-03-09 | Fracture | 1355.00 | 1361.00 | 0 |
2013-09-05 | Packing Device Capped w/Cement | 1476.00 | 1486.00 | 0 |
2013-09-06 | Packing Device Capped w/Cement | 1340.00 | 1350.00 | 0 |
2013-09-06 | Perforation | 515.00 | 517.00 | 13 |
2013-09-06 | Perforation | 572.50 | 574.50 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 1360 | 0.0 | 0.0 | 0.0 |
2001 | 8730 | 0.0 | 0.0 | 0.0 |
2002 | 8513 | 0.0 | 0.0 | 0.0 |
2003 | 6856 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-09-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]