X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534260110020

Well Details

Well ID: 0534260110020
Loading map...
Location: 02/10-01-053-26W4/0
Location Alias: 02/10-01-53-26 W4M
Location Alias 2: 02/10-01-053-26 W4/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 01
County/Municipality: Edmonton
Well Name: PERL ET AL ACHE 10-1-53-26
Operator Name: Pensionfund Energy Resources Limited
License Number: 0081522
License Date: 1980-03-05
License Status: RecCertified
Spud Date: 1980-03-07
Final Drill Date: 1980-03-14
Well Total Depth: 1342.00 m
Surface Hole Latitude: 53.550591
Surface Hole Longitude: -113.704872

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-03-05 Obtained License
1980-03-14 Finished Drilling
1980-03-14 Well Mode changed to Drilled and Cased
1980-03-16 Drill Stem Test Performed
1980-03-17 Drill Stem Test Performed
1980-03-18 Drill Stem Test Performed
1980-03-19 Production Casing Operation Performed
1980-03-23 Perforation Treatment Performed - Jet Perforation
1980-03-25 Perforation Treatment Performed - Fractured
1980-05-16 Perforation Treatment Performed - Cement Squeeze
1980-05-18 Perforation Treatment Performed - Jet Perforation
1980-07-01 Well Began Production
1980-07-01 Well Fluid changed to Crude Oil
1980-07-01 Well Mode changed to Pumping
1986-04-07 Well Fluid changed to Crude Oil
1986-04-07 Well Mode changed to Suspended
1986-10-01 Well Fluid changed to Crude Oil
1986-10-01 Well Mode changed to Pumping
1988-05-01 Well Fluid changed to Crude Oil
1988-05-01 Well Mode changed to Suspended
1990-06-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-06-30 Plug Back Performed
1990-06-30 Well Fluid changed to Crude Oil
1990-06-30 Well Log Performed
1990-06-30 Well Mode changed to Abandoned
1990-07-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-03-23 Perforation 1278.00 1280.00 13
1980-03-25 Fracture 1278.00 1280.00 0
1980-05-16 Cement Squeeze 1278.00 1280.00 0
1980-05-18 Perforation 1278.00 1279.50 13
1990-06-30 Packing Device Capped w/Cement 1254.00 1262.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 3505 0.0 0.0 0.0
1981 4000 0.0 0.0 0.0
1982 4938 0.0 0.0 0.0
1983 8361 0.0 0.0 0.0
1984 8488 0.0 0.0 0.0
1985 8464 0.0 0.0 0.0
1986 1444 0.0 0.0 0.0

For data sources see[5]

References