X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534260203002

Well Details

Well ID: 0534260203002
Loading map...
Location: 00/03-02-053-26W4/2
Location Alias: 00/03-02-53-26 W4M
Location Alias 2: 00/03-02-053-26 W4/02
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 02
County/Municipality: Parkland County
Well Name: TIDEWATER ACH 3-2-53-26
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0003115
License Date: 1951-06-29
License Status: Suspension
Spud Date: 1951-06-29
Final Drill Date: 1951-09-02
Well Total Depth: 1588.00 m
Surface Hole Latitude: 53.543023
Surface Hole Longitude: -113.729581

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-06-29 Obtained License
1951-08-29 Intermediate Casing Operation Performed
1951-09-02 Finished Drilling
1951-09-02 Well Mode changed to Drilled and Cased
1951-09-05 Perforation Treatment Performed - Open-Hole Completion
1971-10-29 Perforation Treatment Performed - Cement Plug
1971-10-29 Perforation Treatment Performed - Open-Hole Completion
1987-05-05 Perforation Treatment Performed - Open-Hole Completion
1987-05-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-05-08 Well Log Performed
1987-07-03 Well Log Performed
1987-11-03 Well Log Performed
1988-01-14 Well Log Performed
1988-04-04 Well Log Performed
1988-07-07 Well Log Performed
1988-09-20 Well Log Performed
1989-11-16 Well Log Performed
1989-11-17 Well Log Performed
1989-11-20 Well Log Performed
1991-02-09 Well Log Performed
1991-02-10 Perforation Treatment Performed - Open-Hole Completion
1991-02-10 Well Log Performed
1991-02-12 Liner Casing Operation Performed
1991-02-12 Perforation Treatment Performed - Cement Squeeze
1991-02-15 Well Log Performed
1991-02-22 Perforation Treatment Performed - Jet Perforation
1991-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-06 Well Began Production
1991-03-06 Well Fluid changed to Crude Oil
1991-03-06 Well Mode changed to Pumping
1991-07-30 Well Fluid changed to Crude Oil
1991-07-30 Well Mode changed to Suspended
1992-09-18 Perforation Treatment Performed - Cement Squeeze
1992-09-18 Well Fluid changed to Crude Oil
1992-09-18 Well Mode changed to Abandoned Zone
1992-09-19 Well Log Performed
1992-09-25 Well Log Performed
1992-09-28 Perforation Treatment Performed - Jet Perforation
1992-09-28 Well Log Performed
1992-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-10-02 Perforation Treatment Performed - Jet Perforation
1992-10-02 Well Log Performed
1992-10-03 Perforation Treatment Performed - Cement Squeeze
1992-10-03 Well Log Performed
1992-10-08 Perforation Treatment Performed - Jet Perforation
1992-10-08 Well Log Performed
1992-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-10-13 Well Log Performed
1993-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-06-26 Perforation Treatment Performed - Cement Squeeze
1994-06-26 Plug Back Performed
1994-06-29 Perforation Treatment Performed - Jet Perforation
1994-07-06 Perforation Treatment Performed - Fractured
1994-07-15 Perforation Treatment Performed - Fractured
1994-07-24 Perforation Treatment Performed - Cement Squeeze
1994-07-24 Plug Back Performed
1996-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-03-31 Perforation Treatment Performed - Cement Squeeze
1996-03-31 Plug Back Performed
2005-08-04 Well Log Performed
2005-08-17 Well Log Performed
2005-08-18 Perforation Treatment Performed - Jet Perforation
2005-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-11-23 Well Log Performed
2006-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-11-24 Plug Back Performed
2006-11-28 Perforation Treatment Performed - Jet Perforation
2006-12-01 Perforation Treatment Performed - Jet Perforation
2006-12-03 Perforation Treatment Performed - Fractured
2007-01-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-01-02 Plug Back Performed
2007-02-01 Well Log Performed
2007-02-05 Well Log Performed
2007-02-07 Perforation Treatment Performed - Jet Perforation
2007-02-08 Perforation Treatment Performed - Fractured
2010-01-11 Perforation Treatment Performed - Cement Squeeze
2010-01-11 Plug Back Performed
2010-01-13 Perforation Treatment Performed - Jet Perforation
2010-01-14 Perforation Treatment Performed - Cement Squeeze
2010-01-21 Well Log Performed
2010-01-22 Perforation Treatment Performed - Jet Perforation
2010-02-04 Perforation Treatment Performed - Jet Perforation
2010-02-04 Well Log Performed
2010-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-11-17 Perforation Treatment Performed - Jet Perforation
2014-11-17 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-09-05 Open Hole/Barefoot Completion 1506.60 1552.00 0
1992-09-18 Cement Squeeze 1389.50 1391.70 0
1992-09-28 Perforation 1523.00 1523.50 20
1992-09-28 Perforation 1535.00 1535.50 20
1992-09-28 Perforation 1537.00 1537.50 20
1992-09-28 Perforation 1539.00 1539.50 20
1992-09-28 Perforation 1541.00 1541.50 20
1992-09-28 Perforation 1543.00 1543.50 20
1992-09-28 Perforation 1545.00 1545.50 20
1992-09-28 Perforation 1547.00 1547.50 20
1992-09-29 Acid Treatment 1523.00 1547.50 0
1971-10-29 Cement Plug 1533.10 1551.70 0
1992-10-02 Perforation 1462.50 1464.50 20
1992-10-03 Cement Squeeze 1462.50 1464.50 0
1992-10-08 Perforation 1417.50 1419.00 16
1992-10-09 Acid Treatment 1417.50 1419.00 0
1993-05-19 Acid Treatment 1417.50 1419.00 0
1993-07-25 Acid Treatment 1417.50 1419.00 0
1993-08-24 Acid Treatment 1417.50 1419.00 0
1994-06-01 Acid Treatment 1417.50 1419.00 0
1994-06-26 Cement Squeeze 1417.50 1419.00 0
1994-06-29 Perforation 1222.00 1229.00 13
1971-10-29 Open Hole/Barefoot Completion 1506.60 1533.10 0
1994-06-29 Perforation 1233.00 1235.00 13
1994-06-29 Perforation 1236.00 1238.00 13
1994-07-06 Fracture 1233.00 1238.00 0
1994-07-15 Fracture 1222.00 1238.00 0
1994-07-24 Cement Squeeze 1417.50 1419.00 0
1996-03-07 Acid Treatment 1222.00 1238.00 0
1996-03-31 Cement Squeeze 1222.00 1238.00 0
2005-08-18 Perforation 1519.80 1521.60 17
2005-10-20 Acid Treatment 1519.80 1521.60 0
2006-11-24 Packing Device Capped w/Cement 1411.00 1511.00 0
1987-05-05 Open Hole/Barefoot Completion 1506.60 1562.10 0
2006-11-28 Perforation 1271.00 1272.20 17
2006-12-01 Perforation 1263.70 1266.80 17
2006-12-01 Perforation 1257.00 1260.00 17
2006-12-03 Fracture 1257.00 1266.80 0
2007-01-02 Packing Device Capped w/Cement 1245.00 1253.00 0
2007-02-07 Perforation 1224.10 1227.10 20
2007-02-08 Fracture 1224.10 1227.10 0
2010-01-11 Cement Squeeze 1224.10 1227.10 0
2010-01-13 Perforation 1263.70 1266.80 17
2010-01-13 Perforation 1257.00 1260.00 17
1987-05-07 Acid Treatment 1506.60 1523.50 0
2010-01-13 Perforation 1271.00 1272.00 17
2010-01-14 Cement Squeeze 1257.00 1272.00 0
2010-01-22 Perforation 1397.00 1398.00 20
2010-01-22 Perforation 1399.00 1401.50 20
2010-02-04 Perforation 1390.50 1392.00 20
2010-02-04 Perforation 1400.00 1406.00 20
2010-02-05 Acid Treatment 1397.00 1406.00 0
2014-11-17 Perforation 1300.80 1305.20 20
1991-02-10 Open Hole/Barefoot Completion 1506.50 1588.00 0
1991-02-12 Cement Squeeze 1506.50 1588.00 0
1991-02-22 Perforation 1389.50 1391.70 13
1991-02-25 Acid Treatment 1389.50 1391.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 2168 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-11-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References