If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0534260203006 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.543023,"lon":-113.729581,"icon":""}]} |
Location: 00/03-02-053-26W4/6 | |
Location Alias: 00/03-02-53-26 W4M | |
Location Alias 2: 00/03-02-053-26 W4/06 | |
Country: Canada | |
Province: Alberta | |
Township: 053 | |
Meridian: 4 | |
Range: 26 | |
Section: 02 | |
County/Municipality: Parkland County | |
Well Name: TIDEWATER ACH 3-2-53-26 | |
Operator Name: Tidewater Midstream and Infrastructure Ltd. | |
License Number: 0003115 | |
License Date: 1951-06-29 | |
License Status: Suspension | |
Spud Date: 1951-06-29 | |
Final Drill Date: 1951-09-02 | |
Well Total Depth: 1588.00 m | |
Surface Hole Latitude: 53.543023 | |
Surface Hole Longitude: -113.729581 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1951-06-29 | Obtained License |
1951-08-29 | Intermediate Casing Operation Performed |
1951-09-02 | Finished Drilling |
1951-09-02 | Well Mode changed to Drilled and Cased |
1951-09-05 | Perforation Treatment Performed - Open-Hole Completion |
1971-10-29 | Perforation Treatment Performed - Cement Plug |
1971-10-29 | Perforation Treatment Performed - Open-Hole Completion |
1987-05-05 | Perforation Treatment Performed - Open-Hole Completion |
1987-05-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-05-08 | Well Log Performed |
1987-07-03 | Well Log Performed |
1987-11-03 | Well Log Performed |
1988-01-14 | Well Log Performed |
1988-04-04 | Well Log Performed |
1988-07-07 | Well Log Performed |
1988-09-20 | Well Log Performed |
1989-11-16 | Well Log Performed |
1989-11-17 | Well Log Performed |
1989-11-20 | Well Log Performed |
1991-02-09 | Well Log Performed |
1991-02-10 | Perforation Treatment Performed - Open-Hole Completion |
1991-02-10 | Well Log Performed |
1991-02-12 | Liner Casing Operation Performed |
1991-02-12 | Perforation Treatment Performed - Cement Squeeze |
1991-02-15 | Well Log Performed |
1991-02-22 | Perforation Treatment Performed - Jet Perforation |
1991-02-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-09-18 | Perforation Treatment Performed - Cement Squeeze |
1992-09-19 | Well Log Performed |
1992-09-25 | Well Log Performed |
1992-09-28 | Perforation Treatment Performed - Jet Perforation |
1992-09-28 | Well Log Performed |
1992-09-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-10-02 | Perforation Treatment Performed - Jet Perforation |
1992-10-02 | Well Log Performed |
1992-10-03 | Perforation Treatment Performed - Cement Squeeze |
1992-10-03 | Well Log Performed |
1992-10-08 | Perforation Treatment Performed - Jet Perforation |
1992-10-08 | Well Log Performed |
1992-10-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-10-13 | Well Log Performed |
1993-05-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-07-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-08-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-06-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-06-26 | Perforation Treatment Performed - Cement Squeeze |
1994-06-26 | Plug Back Performed |
1994-06-29 | Perforation Treatment Performed - Jet Perforation |
1994-07-06 | Perforation Treatment Performed - Fractured |
1994-07-15 | Perforation Treatment Performed - Fractured |
1994-07-24 | Perforation Treatment Performed - Cement Squeeze |
1994-07-24 | Plug Back Performed |
1996-03-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-03-31 | Perforation Treatment Performed - Cement Squeeze |
1996-03-31 | Plug Back Performed |
2005-08-04 | Well Log Performed |
2005-08-17 | Well Log Performed |
2005-08-18 | Perforation Treatment Performed - Jet Perforation |
2005-10-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2006-11-23 | Well Log Performed |
2006-11-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-11-24 | Plug Back Performed |
2006-11-28 | Perforation Treatment Performed - Jet Perforation |
2006-12-01 | Perforation Treatment Performed - Jet Perforation |
2006-12-03 | Perforation Treatment Performed - Fractured |
2007-01-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-01-02 | Plug Back Performed |
2007-02-01 | Well Log Performed |
2007-02-05 | Well Log Performed |
2007-02-07 | Perforation Treatment Performed - Jet Perforation |
2007-02-08 | Perforation Treatment Performed - Fractured |
2010-01-11 | Perforation Treatment Performed - Cement Squeeze |
2010-01-11 | Plug Back Performed |
2010-01-13 | Perforation Treatment Performed - Jet Perforation |
2010-01-14 | Perforation Treatment Performed - Cement Squeeze |
2010-01-21 | Well Log Performed |
2010-01-22 | Perforation Treatment Performed - Jet Perforation |
2010-02-04 | Perforation Treatment Performed - Jet Perforation |
2010-02-04 | Well Log Performed |
2010-02-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2014-11-17 | Perforation Treatment Performed - Jet Perforation |
2014-11-17 | Well Log Performed |
2014-11-20 | Well Began Production |
2014-11-20 | Well Fluid changed to Crude Oil |
2014-11-20 | Well Mode changed to Pumping |
2017-11-12 | Well Fluid changed to Crude Oil |
2017-11-12 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1951-09-05 | Open Hole/Barefoot Completion | 1506.60 | 1552.00 | 0 |
1992-09-18 | Cement Squeeze | 1389.50 | 1391.70 | 0 |
1992-09-28 | Perforation | 1523.00 | 1523.50 | 20 |
1992-09-28 | Perforation | 1535.00 | 1535.50 | 20 |
1992-09-28 | Perforation | 1537.00 | 1537.50 | 20 |
1992-09-28 | Perforation | 1539.00 | 1539.50 | 20 |
1992-09-28 | Perforation | 1541.00 | 1541.50 | 20 |
1992-09-28 | Perforation | 1543.00 | 1543.50 | 20 |
1992-09-28 | Perforation | 1545.00 | 1545.50 | 20 |
1992-09-28 | Perforation | 1547.00 | 1547.50 | 20 |
1992-09-29 | Acid Treatment | 1523.00 | 1547.50 | 0 |
1971-10-29 | Cement Plug | 1533.10 | 1551.70 | 0 |
1992-10-02 | Perforation | 1462.50 | 1464.50 | 20 |
1992-10-03 | Cement Squeeze | 1462.50 | 1464.50 | 0 |
1992-10-08 | Perforation | 1417.50 | 1419.00 | 16 |
1992-10-09 | Acid Treatment | 1417.50 | 1419.00 | 0 |
1993-05-19 | Acid Treatment | 1417.50 | 1419.00 | 0 |
1993-07-25 | Acid Treatment | 1417.50 | 1419.00 | 0 |
1993-08-24 | Acid Treatment | 1417.50 | 1419.00 | 0 |
1994-06-01 | Acid Treatment | 1417.50 | 1419.00 | 0 |
1994-06-26 | Cement Squeeze | 1417.50 | 1419.00 | 0 |
1994-06-29 | Perforation | 1222.00 | 1229.00 | 13 |
1971-10-29 | Open Hole/Barefoot Completion | 1506.60 | 1533.10 | 0 |
1994-06-29 | Perforation | 1233.00 | 1235.00 | 13 |
1994-06-29 | Perforation | 1236.00 | 1238.00 | 13 |
1994-07-06 | Fracture | 1233.00 | 1238.00 | 0 |
1994-07-15 | Fracture | 1222.00 | 1238.00 | 0 |
1994-07-24 | Cement Squeeze | 1417.50 | 1419.00 | 0 |
1996-03-07 | Acid Treatment | 1222.00 | 1238.00 | 0 |
1996-03-31 | Cement Squeeze | 1222.00 | 1238.00 | 0 |
2005-08-18 | Perforation | 1519.80 | 1521.60 | 17 |
2005-10-20 | Acid Treatment | 1519.80 | 1521.60 | 0 |
2006-11-24 | Packing Device Capped w/Cement | 1411.00 | 1511.00 | 0 |
1987-05-05 | Open Hole/Barefoot Completion | 1506.60 | 1562.10 | 0 |
2006-11-28 | Perforation | 1271.00 | 1272.20 | 17 |
2006-12-01 | Perforation | 1263.70 | 1266.80 | 17 |
2006-12-01 | Perforation | 1257.00 | 1260.00 | 17 |
2006-12-03 | Fracture | 1257.00 | 1266.80 | 0 |
2007-01-02 | Packing Device Capped w/Cement | 1245.00 | 1253.00 | 0 |
2007-02-07 | Perforation | 1224.10 | 1227.10 | 20 |
2007-02-08 | Fracture | 1224.10 | 1227.10 | 0 |
2010-01-11 | Cement Squeeze | 1224.10 | 1227.10 | 0 |
2010-01-13 | Perforation | 1263.70 | 1266.80 | 17 |
2010-01-13 | Perforation | 1257.00 | 1260.00 | 17 |
1987-05-07 | Acid Treatment | 1506.60 | 1523.50 | 0 |
2010-01-13 | Perforation | 1271.00 | 1272.00 | 17 |
2010-01-14 | Cement Squeeze | 1257.00 | 1272.00 | 0 |
2010-01-22 | Perforation | 1397.00 | 1398.00 | 20 |
2010-01-22 | Perforation | 1399.00 | 1401.50 | 20 |
2010-02-04 | Perforation | 1390.50 | 1392.00 | 20 |
2010-02-04 | Perforation | 1400.00 | 1406.00 | 20 |
2010-02-05 | Acid Treatment | 1397.00 | 1406.00 | 0 |
2014-11-17 | Perforation | 1300.80 | 1305.20 | 20 |
1991-02-10 | Open Hole/Barefoot Completion | 1506.50 | 1588.00 | 0 |
1991-02-12 | Cement Squeeze | 1506.50 | 1588.00 | 0 |
1991-02-22 | Perforation | 1389.50 | 1391.70 | 13 |
1991-02-25 | Acid Treatment | 1389.50 | 1391.70 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 24 | 0.0 | 0.0 | 0.0 |
2015 | 8126 | 0.0 | 0.0 | 0.0 |
2016 | 312 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-11-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]