If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0534260210003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.550286,"lon":-113.722859,"icon":""}]} |
Location: 00/10-02-053-26W4/3 | |
Location Alias: 00/10-02-53-26 W4M | |
Location Alias 2: 00/10-02-053-26 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 053 | |
Meridian: 4 | |
Range: 26 | |
Section: 02 | |
County/Municipality: Parkland County | |
Well Name: CEDAR CREEK ACH 10-2-53-26 | |
Operator Name: MAGA Energy Operations Ltd. | |
License Number: 0127592 | |
License Date: 1987-07-28 | |
License Status: Suspension | |
Spud Date: 1987-07-30 | |
Final Drill Date: 1987-08-07 | |
Well Total Depth: 1324.00 m | |
Surface Hole Latitude: 53.550286 | |
Surface Hole Longitude: -113.722859 |
Date | Event |
---|---|
1987-07-28 | Obtained License |
1987-07-31 | Surface Casing Operation Performed |
1987-08-07 | Finished Drilling |
1987-08-07 | Well Log Performed |
1987-08-07 | Well Mode changed to Drilled and Cased |
1987-08-09 | Drill Stem Test Performed |
1987-08-10 | Drill Stem Test Performed |
1987-08-11 | Production Casing Operation Performed |
1987-08-11 | Rig Released |
1987-09-13 | Perforation Treatment Performed - Jet Perforation |
1987-09-15 | Perforation Treatment Performed - Fractured |
1987-09-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-09-17 | Plug Back Performed |
1987-09-18 | Perforation Treatment Performed - Jet Perforation |
1987-09-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-09-30 | Perforation Treatment Performed - Fractured |
2009-04-24 | Perforation Treatment Performed - Jet Perforation |
2009-04-24 | Well Log Performed |
2010-03-05 | Perforation Treatment Performed - Jet Perforation |
2010-03-10 | Perforation Treatment Performed - Jet Perforation |
2010-03-10 | Well Log Performed |
2010-03-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-03-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-03-16 | Well Log Performed |
2010-03-26 | Perforation Treatment Performed - Cement Squeeze |
2010-03-26 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1987-09-13 | Perforation | 1275.90 | 1277.00 | 12 |
2010-03-10 | Perforation | 1306.00 | 1307.50 | 20 |
2010-03-11 | Acid Treatment | 1315.70 | 1318.70 | 0 |
2010-03-12 | Acid Treatment | 1306.00 | 1307.50 | 0 |
2010-03-26 | Cement Squeeze | 1220.00 | 1223.70 | 0 |
1987-09-15 | Fracture | 1275.90 | 1277.00 | 0 |
1987-09-17 | Packing Device Capped w/Cement | 1266.00 | 1274.00 | 0 |
1987-09-18 | Perforation | 1221.70 | 1223.70 | 12 |
1987-09-20 | Acid Treatment | 1221.70 | 1223.70 | 0 |
1987-09-30 | Fracture | 1221.70 | 1223.70 | 0 |
2009-04-24 | Perforation | 1220.00 | 1222.00 | 17 |
2010-03-05 | Perforation | 1275.90 | 1277.00 | 12 |
2010-03-10 | Perforation | 1315.70 | 1318.70 | 20 |
For data sources see[4]