If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0534260212002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.550331,"lon":-113.734909,"icon":""}]} |
Location: 00/12-02-053-26W4/2 | |
Location Alias: 00/12-02-53-26 W4M | |
Location Alias 2: 00/12-02-053-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 053 | |
Meridian: 4 | |
Range: 26 | |
Section: 02 | |
County/Municipality: Parkland County | |
Well Name: TIDEWATER ACH 12-2-53-26 | |
Operator Name: Tidewater Midstream and Infrastructure Ltd. | |
License Number: 0002616 | |
License Date: 1951-02-12 | |
License Status: Suspension | |
Spud Date: 1951-03-05 | |
Final Drill Date: 1951-04-13 | |
Well Total Depth: 1588.00 m | |
Surface Hole Latitude: 53.550331 | |
Surface Hole Longitude: -113.734909 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1951-02-12 | Obtained License |
1951-04-09 | Production Casing Operation Performed |
1951-04-13 | Finished Drilling |
1951-04-13 | Perforation Treatment Performed - Open-Hole Completion |
1961-06-08 | Perforation Treatment Performed - Jet Perforation |
1961-06-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1961-06-15 | Well Mode changed to Drilled and Cased |
1962-01-13 | Well Began Production |
1962-01-13 | Well Fluid changed to Gas |
1962-01-13 | Well Mode changed to Flowing |
1962-10-02 | Drill Stem Test Performed |
1962-10-04 | Perforation Treatment Performed - Cement Squeeze |
1962-10-10 | Perforation Treatment Performed - Jet Perforation |
1968-08-01 | Well Fluid changed to Gas |
1968-08-01 | Well Mode changed to Suspended |
1969-11-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1970-02-09 | Well Fluid changed to Crude Oil |
1970-02-09 | Well Mode changed to Flowing |
1980-06-13 | Well Fluid changed to Crude Oil |
1980-06-13 | Well Mode changed to Pumping |
1992-12-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-12-11 | Perforation Treatment Performed - Cement Squeeze |
1992-12-11 | Well Fluid changed to Crude Oil |
1992-12-11 | Well Mode changed to Abandoned Zone |
1992-12-19 | Perforation Treatment Performed - Open-Hole Completion |
1992-12-21 | Liner Casing Operation Performed |
1992-12-21 | Perforation Treatment Performed - Cement Plug |
1992-12-21 | Perforation Treatment Performed - Cement Squeeze |
1992-12-21 | Perforation Treatment Performed - Open-Hole Completion |
1993-01-04 | Perforation Treatment Performed - Jet Perforation |
1993-01-04 | Well Log Performed |
1993-01-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-01-06 | Perforation Treatment Performed - Jet Perforation |
1993-01-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-01-08 | Perforation Treatment Performed - Cement Squeeze |
1993-05-05 | Perforation Treatment Performed - Chemical Squeeze |
1993-09-10 | Perforation Treatment Performed - Chemical Squeeze |
1993-10-08 | Perforation Treatment Performed - Chemical Squeeze |
1996-02-07 | Well Log Performed |
1996-07-09 | Well Log Performed |
1997-01-09 | Well Log Performed |
1997-08-14 | Well Log Performed |
1998-03-17 | Well Log Performed |
1998-10-14 | Well Log Performed |
1999-03-25 | Well Log Performed |
2004-04-15 | Perforation Treatment Performed - Jet Perforation |
2004-04-15 | Well Log Performed |
2007-03-22 | Well Log Performed |
2007-03-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-03-26 | Plug Back Performed |
2007-03-27 | Well Log Performed |
2007-03-30 | Well Log Performed |
2007-04-03 | Perforation Treatment Performed - Jet Perforation |
2007-04-04 | Perforation Treatment Performed - Fractured |
2007-05-01 | Well Fluid changed to Crude Oil |
2007-05-01 | Well Mode changed to Pumping |
2015-01-01 | Well Fluid changed to Crude Oil |
2015-01-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1951-04-13 | Open Hole/Barefoot Completion | 1521.90 | 1553.90 | 0 |
1992-12-11 | Cement Squeeze | 1221.00 | 1223.50 | 0 |
1992-12-19 | Open Hole/Barefoot Completion | 1521.90 | 1588.00 | 0 |
1992-12-21 | Cement Plug | 1529.50 | 1588.00 | 0 |
1992-12-21 | Open Hole/Barefoot Completion | 1521.90 | 1586.00 | 0 |
1992-12-21 | Cement Squeeze | 1521.90 | 1586.00 | 0 |
1993-01-04 | Perforation | 1528.50 | 1529.00 | 20 |
1993-01-04 | Perforation | 1536.70 | 1537.00 | 20 |
1993-01-04 | Perforation | 1538.70 | 1539.20 | 20 |
1993-01-04 | Perforation | 1540.90 | 1541.40 | 20 |
1993-01-04 | Perforation | 1543.10 | 1543.60 | 20 |
1961-06-08 | Perforation | 1221.00 | 1224.10 | 13 |
1993-01-04 | Perforation | 1545.30 | 1545.80 | 20 |
1993-01-04 | Perforation | 1547.50 | 1548.00 | 20 |
1993-01-04 | Perforation | 1549.70 | 1550.20 | 20 |
1993-01-05 | Acid Treatment | 1528.50 | 1550.20 | 0 |
1993-01-06 | Perforation | 1227.50 | 1229.50 | 13 |
1993-01-07 | Acid Treatment | 1227.50 | 1229.50 | 0 |
1993-01-08 | Cement Squeeze | 1227.50 | 1229.50 | 0 |
1993-05-05 | Chemical Squeeze | 1528.50 | 1550.20 | 0 |
1993-09-10 | Chemical Squeeze | 1528.50 | 1550.20 | 0 |
1993-10-08 | Chemical Squeeze | 1528.50 | 1550.20 | 0 |
1961-06-08 | Perforation | 1227.10 | 1228.30 | 13 |
1993-10-08 | Chemical Squeeze | 1528.50 | 1550.20 | 0 |
2004-04-15 | Perforation | 1533.00 | 1533.50 | 20 |
2007-03-26 | Packing Device Capped w/Cement | 1516.00 | 1524.00 | 0 |
2007-04-03 | Perforation | 1220.70 | 1224.10 | 20 |
2007-04-04 | Fracture | 1220.70 | 1224.10 | 0 |
1961-06-15 | Acid Treatment | 1221.00 | 1228.30 | 0 |
1962-10-04 | Cement Squeeze | 1227.10 | 1228.30 | 0 |
1962-10-10 | Perforation | 1221.00 | 1221.60 | 13 |
1962-10-10 | Perforation | 1221.60 | 1223.50 | 7 |
1969-11-28 | Packing Device Capped w/Cement | 1258.20 | 1258.20 | 0 |
1992-12-11 | Acid Treatment | 1221.00 | 1223.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1970 | 7157 | 0.0 | 0.0 | 0.0 |
1971 | 7937 | 0.0 | 0.0 | 0.0 |
1972 | 3563 | 0.0 | 0.0 | 0.0 |
1973 | 8390 | 0.0 | 0.0 | 0.0 |
1974 | 6894 | 0.0 | 0.0 | 0.0 |
1975 | 8486 | 0.0 | 0.0 | 0.0 |
1976 | 8105 | 0.0 | 0.0 | 0.0 |
1977 | 8541 | 0.0 | 0.0 | 0.0 |
1978 | 8211 | 0.0 | 0.0 | 0.0 |
1979 | 8059 | 0.0 | 0.0 | 0.0 |
1980 | 8123 | 0.0 | 0.0 | 0.0 |
1981 | 8290 | 0.0 | 0.0 | 0.0 |
1982 | 7909 | 0.0 | 0.0 | 0.0 |
1983 | 8200 | 0.0 | 0.0 | 0.0 |
1984 | 8400 | 0.0 | 0.0 | 0.0 |
1985 | 8451 | 0.0 | 0.0 | 0.0 |
1986 | 8253 | 0.0 | 0.0 | 0.0 |
1987 | 8424 | 0.0 | 0.0 | 0.0 |
1988 | 8605 | 0.0 | 0.0 | 0.0 |
1989 | 8037 | 0.0 | 0.0 | 0.0 |
1990 | 8437 | 0.0 | 0.0 | 0.0 |
1991 | 8585 | 0.0 | 0.0 | 0.0 |
1992 | 8154 | 0.0 | 0.0 | 0.0 |
2007 | 5829 | 0.0 | 0.0 | 0.0 |
2008 | 8747 | 0.0 | 0.0 | 0.0 |
2009 | 8707 | 0.0 | 0.0 | 0.0 |
2010 | 8560 | 0.0 | 0.0 | 0.0 |
2011 | 8703 | 0.0 | 0.0 | 0.0 |
2012 | 8777 | 0.0 | 0.0 | 0.0 |
2013 | 8279 | 0.0 | 0.0 | 0.0 |
For data sources see[5]