X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534260214002

Well Details

Well ID: 0534260214002
Loading map...
Location: 00/14-02-053-26W4/2
Location Alias: 00/14-02-53-26 W4M
Location Alias 2: 00/14-02-053-26 W4/02
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 02
County/Municipality: Parkland County
Well Name: TIDEWATER ACH 14-2-53-26
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0002282
License Date: 1950-11-13
License Status: Suspension
Spud Date: 1950-12-04
Final Drill Date: 1951-02-02
Well Total Depth: 1585.00 m
Surface Hole Latitude: 53.553926
Surface Hole Longitude: -113.728842

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-11-13 Obtained License
1950-12-21 Intermediate Casing Operation Performed
1950-12-22 Drill Stem Test Performed
1950-12-29 Drill Stem Test Performed
1951-01-04 Drill Stem Test Performed
1951-01-06 Drill Stem Test Performed
1951-01-30 Drill Stem Test Performed
1951-02-02 Finished Drilling
1951-02-02 Perforation Treatment Performed - Open-Hole Completion
1951-02-02 Well Mode changed to Drilled and Cased
1984-05-03 Well Log Performed
1984-08-01 Well Log Performed
1987-05-30 Well Log Performed
1987-07-04 Well Log Performed
1988-01-14 Well Log Performed
1988-04-04 Well Log Performed
1988-07-08 Well Log Performed
1988-09-20 Well Log Performed
1989-01-09 Well Log Performed
1989-08-28 Well Log Performed
1989-08-30 Well Log Performed
1990-12-08 Well Log Performed
1990-12-10 Perforation Treatment Performed - Open-Hole Completion
1990-12-10 Well Log Performed
1990-12-11 Perforation Treatment Performed - Cement Squeeze
1990-12-12 Liner Casing Operation Performed
1990-12-12 Perforation Treatment Performed - Cement Squeeze
1990-12-14 Perforation Treatment Performed - Jet Perforation
1990-12-14 Well Log Performed
1990-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-12-15 Well Log Performed
1992-01-07 Perforation Treatment Performed - Chemical Squeeze
1992-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-07-24 Perforation Treatment Performed - Jet Perforation
1992-07-24 Well Log Performed
1992-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-12-20 Perforation Treatment Performed - Jet Perforation
1992-12-20 Well Log Performed
1993-03-15 Perforation Treatment Performed - Chemical Squeeze
1993-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-04-03 Perforation Treatment Performed - Chemical Squeeze
2001-04-26 Perforation Treatment Performed - Chemical Squeeze
2001-07-20 Perforation Treatment Performed - Chemical Squeeze
2001-08-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-06-11 Perforation Treatment Performed - Jet Perforation
2010-06-11 Plug Back Performed
2010-06-12 Perforation Treatment Performed - Fractured
2010-07-05 Well Began Production
2010-07-05 Well Fluid changed to Crude Oil
2010-07-05 Well Mode changed to Pumping
2017-04-01 Well Fluid changed to Crude Oil
2017-04-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-02-02 Open Hole/Barefoot Completion 1484.40 1553.60 0
1990-12-14 Perforation 1533.50 1534.20 20
1990-12-14 Perforation 1535.00 1535.70 20
1990-12-15 Acid Treatment 1526.00 1535.70 0
1992-01-07 Chemical Squeeze 1526.00 1535.70 0
1992-07-23 Acid Treatment 1526.00 1535.70 0
1992-07-24 Perforation 1514.50 1518.50 13
1992-07-25 Acid Treatment 1514.50 1518.50 0
1992-12-20 Perforation 1502.50 1514.50 20
1992-12-20 Perforation 1518.50 1522.50 20
1993-03-15 Chemical Squeeze 1502.50 1535.70 0
1990-12-10 Open Hole/Barefoot Completion 1484.40 1585.00 0
1993-03-17 Acid Treatment 1502.50 1535.70 0
2001-04-03 Chemical Squeeze 1502.50 1522.50 0
2001-04-26 Chemical Squeeze 1502.50 1522.50 0
2001-07-20 Chemical Squeeze 1502.50 1522.50 0
2001-08-18 Acid Treatment 1502.50 1522.50 0
2010-06-11 Packing Device Capped w/Cement 1487.00 1495.00 0
2010-06-11 Perforation 1379.00 1381.00 17
2010-06-12 Fracture 1379.00 1381.00 0
1990-12-11 Cement Squeeze 1583.50 1585.00 0
1990-12-12 Cement Squeeze 1484.40 1585.00 0
1990-12-14 Perforation 1526.00 1526.70 20
1990-12-14 Perforation 1527.50 1528.20 20
1990-12-14 Perforation 1529.00 1529.70 20
1990-12-14 Perforation 1530.50 1531.20 20
1990-12-14 Perforation 1532.00 1532.70 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 4260 0.0 0.0 0.0
2011 8241 0.0 0.0 0.0
2012 8553 0.0 0.0 0.0
2013 8248 0.0 0.0 0.0
2014 8581 0.0 0.0 0.0
2015 1104 0.0 0.0 0.0

For data sources see[5]

References