X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534260215004

Well Details

Well ID: 0534260215004
Loading map...
Location: 00/15-02-053-26W4/4
Location Alias: 00/15-02-53-26 W4M
Location Alias 2: 00/15-02-053-26 W4/04
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 02
County/Municipality: Parkland County
Well Name: CEDAR CREEK ACH 15-2-53-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0002583
License Date: 1951-01-29
License Status: Suspension
Spud Date: 1951-02-10
Final Drill Date: 1959-04-22
Well Total Depth: 1591.00 m
Surface Hole Latitude: 53.553927
Surface Hole Longitude: -113.723605

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-01-29 Obtained License
1951-02-10 Direction Drilling Operation Performed - 98
1951-03-07 Production Casing Operation Performed
1959-04-22 Finished Drilling
1959-04-22 Well Mode changed to Drilled and Cased
1959-04-23 Liner Casing Operation Performed
1959-04-26 Perforation Treatment Performed - Open-Hole Completion
1991-07-17 Perforation Treatment Performed - Open-Hole Completion
1991-07-17 Well Log Performed
1992-09-11 Perforation Treatment Performed - Jet Perforation
1993-06-15 Perforation Treatment Performed - Cement Squeeze
1993-06-22 Well Log Performed
1993-06-24 Well Log Performed
1993-06-27 Well Log Performed
1993-06-28 Perforation Treatment Performed - Cement Plug
1993-06-29 Perforation Treatment Performed - Jet Perforation
1993-06-29 Well Log Performed
1993-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-04-21 Perforation Treatment Performed - Jet Perforation
2006-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-05-25 Plug Back Performed
2006-05-30 Perforation Treatment Performed - Jet Perforation
2006-05-31 Perforation Treatment Performed - Fractured
2006-06-15 Well Began Production
2006-06-15 Well Fluid changed to Crude Oil
2006-06-15 Well Mode changed to Flowing
2007-11-21 Perforation Treatment Performed - Cement Squeeze
2007-11-21 Plug Back Performed
2007-11-21 Well Fluid changed to Crude Oil
2007-11-21 Well Mode changed to Abandoned Zone
2007-11-26 Perforation Treatment Performed - Jet Perforation
2007-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-02-13 Perforation Treatment Performed - Jet Perforation
2009-02-13 Well Log Performed
2009-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1951-02-10 1171.70 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-04-26 Open Hole/Barefoot Completion 1534.10 1537.70 0
2004-04-21 Perforation 1536.00 1539.50 20
2006-05-25 Packing Device Capped w/Cement 1518.90 1526.90 0
2006-05-30 Perforation 1216.00 1220.00 20
2006-05-31 Fracture 1216.00 1220.00 0
2007-11-21 Cement Squeeze 1216.00 1220.00 0
2007-11-26 Perforation 1301.50 1306.10 20
2007-11-28 Acid Treatment 1301.50 1306.10 0
2009-02-13 Perforation 1294.50 1296.50 20
2009-02-13 Perforation 1298.00 1300.00 20
2009-02-17 Acid Treatment 1294.50 1306.10 0
1991-07-17 Open Hole/Barefoot Completion 1537.70 1591.00 0
1992-09-11 Perforation 1402.50 1404.00 20
1993-06-15 Cement Squeeze 1402.50 1404.00 0
1993-06-28 Cement Plug 1537.00 1588.90 0
1993-06-29 Perforation 1536.00 1536.50 14
1993-06-29 Perforation 1548.50 1549.00 14
1993-06-29 Perforation 1551.50 1552.00 14
1993-07-03 Acid Treatment 1536.00 1536.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 3888 0.0 0.0 0.0
2007 4278 0.0 0.0 0.0

For data sources see[6]

References