X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534261305000

Well Details

Well ID: 0534261305000
Loading map...
Location: 00/05-13-053-26W4/0
Location Alias: 00/05-13-53-26 W4M
Location Alias 2: 00/05-13-053-26 W4/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 13
County/Municipality: Edmonton
Well Name: KATHERINE NO 2
Operator Name: Acheson-East Oil & Gas Co Ltd
License Number: 0002180
License Date: 1950-10-19
License Status: RecCertified
Spud Date: 1950-11-04
Final Drill Date: 1950-11-20
Well Total Depth: 1203.70 m
Surface Hole Latitude: 53.575782
Surface Hole Longitude: -113.710429

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-10-19 Obtained License
1950-11-12 Drill Stem Test Performed
1950-11-15 Drill Stem Test Performed
1950-11-18 Drill Stem Test Performed
1950-11-20 Finished Drilling
1950-11-20 Well Mode changed to Drilled and Cased
1950-11-21 Perforation Treatment Performed - Open-Hole Completion
1950-11-21 Production Casing Operation Performed
1950-11-26 Well Began Production
1950-11-26 Well Fluid changed to Crude Oil
1950-11-26 Well Mode changed to Flowing
1951-09-09 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1951-09-13 Perforation Treatment Performed - Bullet Perforation
1951-09-20 Perforation Treatment Performed - Open-Hole Completion
1951-09-21 Perforation Treatment Performed - Acid Wash - No Pressure
1951-09-22 Perforation Treatment Performed - Bullet Perforation
1951-09-23 Perforation Treatment Performed - Cement Squeeze
1951-09-29 Perforation Treatment Performed - Bullet Perforation
1957-04-01 Well Fluid changed to Crude Oil
1957-04-01 Well Mode changed to Pumping
1966-11-08 Perforation Treatment Performed - Cement Plug
1966-11-11 Well Abandoned
1966-11-11 Well Fluid changed to Crude Oil
1966-11-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-11-21 Open Hole/Barefoot Completion 1201.50 1203.00 0
1951-09-09 Resin-Gypsum Squeeze or Plug 1201.50 1203.00 0
1951-09-13 Bullet Perforation 1200.60 1200.90 13
1951-09-20 Open Hole/Barefoot Completion 1201.50 1203.70 0
1951-09-21 Acid Wash 1201.50 1203.70 0
1951-09-22 Bullet Perforation 1202.10 1203.70 0
1951-09-23 Cement Squeeze 1200.60 1203.70 0
1951-09-29 Bullet Perforation 1200.60 1200.90 13
1966-11-08 Cement Plug 1161.30 1201.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0

For data sources see[5]

References