If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0534261308000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.576061,"lon":-113.694105,"icon":""}]} |
Location: 00/08-13-053-26W4/0 | |
Location Alias: 00/08-13-53-26 W4M | |
Location Alias 2: 00/08-13-053-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 053 | |
Meridian: 4 | |
Range: 26 | |
Section: 13 | |
County/Municipality: Edmonton | |
Well Name: KEL ET AL ACHESON 8-13-53-26 | |
Operator Name: Kelvin Energy Ltd. | |
License Number: 0096169 | |
License Date: 1982-06-04 | |
License Status: RecCertified | |
Spud Date: 1982-06-08 | |
Final Drill Date: 1982-06-16 | |
Well Total Depth: 1415.00 m | |
Surface Hole Latitude: 53.576061 | |
Surface Hole Longitude: -113.694105 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-06-04 | Obtained License |
1982-06-10 | Lost Circulation Occurred |
1982-06-16 | Finished Drilling |
1982-06-18 | Drill Stem Test Performed |
1982-06-19 | Drill Stem Test Performed |
1982-06-20 | Production Casing Operation Performed |
1982-06-26 | Perforation Treatment Performed - Jet Perforation |
1982-06-28 | Perforation Treatment Performed - Jet Perforation |
1982-06-30 | Perforation Treatment Performed - Jet Perforation |
1982-07-02 | Perforation Treatment Performed - Jet Perforation |
1982-07-12 | Perforation Treatment Performed - Fractured |
1982-07-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1982-07-16 | Perforation Treatment Performed - Jet Perforation |
1982-07-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-07-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1982-07-19 | Well Abandoned |
1982-07-19 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-06-26 | Perforation | 1375.00 | 1381.00 | 3 |
1982-07-17 | Acid Treatment | 488.00 | 491.00 | 0 |
1982-07-19 | Packing Device Capped w/Cement | 467.00 | 475.00 | 0 |
1982-06-28 | Perforation | 1364.00 | 1366.00 | 7 |
1982-06-30 | Perforation | 1330.00 | 1333.00 | 7 |
1982-07-02 | Perforation | 1312.00 | 1321.00 | 3 |
1982-07-02 | Perforation | 1309.00 | 1310.00 | 7 |
1982-07-02 | Perforation | 1291.00 | 1306.00 | 3 |
1982-07-12 | Fracture | 1291.00 | 1306.00 | 0 |
1982-07-16 | Packing Device Capped w/Cement | 1267.00 | 1275.00 | 0 |
1982-07-16 | Perforation | 488.00 | 491.00 | 7 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1982-06-10 | Lost Circulation | 110.00 | 162.00 |
For data sources see[5]