X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535181610000

Well Details

Well ID: 0535181610000
Loading map...
Location: 00/10-16-053-18W5/0
Location Alias: 00/10-16-53-18 W5M
Location Alias 2: 00/10-16-053-18 W5/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 18
Section: 16
County/Municipality: Yellowhead County
Well Name: TALISMAN EDSON 10-16-53-18
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0022790
License Date: 1962-08-01
License Status: Issued
Spud Date: 1962-08-11
Final Drill Date: 1962-09-18
Well Total Depth: 2926.10 m
Surface Hole Latitude: 53.579391
Surface Hole Longitude: -116.589647

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-08-01 Obtained License
1962-09-18 Finished Drilling
1962-09-22 Production Casing Operation Performed
1962-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-10-08 Perforation Treatment Performed - Jet Perforation
1962-10-22 Well Mode changed to Drilled and Cased
1965-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-09-30 Perforation Treatment Performed - Nitrogen Treatment
1965-11-17 Well Began Production
1965-11-17 Well Fluid changed to Gas
1965-11-17 Well Mode changed to Flowing
1966-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-12-12 Perforation Treatment Performed - Jet Perforation
2010-07-01 Well Fluid changed to Gas
2010-07-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-10-08 Perforation 2809.60 2810.30 13
1966-12-12 Perforation 2803.60 2805.10 7
1966-12-12 Perforation 2805.70 2808.10 7
1966-12-12 Perforation 2808.70 2810.30 7
1966-12-12 Perforation 2810.90 2812.10 7
1966-12-12 Acid Treatment 2796.80 2812.10 0
1962-10-08 Perforation 2807.50 2808.10 13
1962-10-08 Perforation 2804.50 2805.10 13
1962-10-08 Perforation 2802.30 2802.90 13
1962-10-08 Perforation 2799.90 2800.50 13
1962-10-08 Perforation 2796.80 2797.50 13
1962-10-08 Acid Treatment 2796.80 2810.30 0
1965-09-30 Acid Treatment 2796.80 2810.30 0
1965-09-30 Nitrogen Treatment 2796.80 2810.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1291 0.0 0.0 0.0
1969 7364 0.0 0.0 0.0
1970 7599 0.0 0.0 0.0
1971 6693 0.0 0.0 0.0
1972 7386 0.0 0.0 0.0
1973 8005 0.0 0.0 0.0
1974 8164 0.0 0.0 0.0
1975 7723 0.0 0.0 0.0
1976 4834 0.0 0.0 0.0
1977 5395 0.0 0.0 0.0
1978 2838 0.0 0.0 0.0
1979 3031 0.0 0.0 0.0
1980 2912 0.0 0.0 0.0
1981 3011 0.0 0.0 0.0
1982 3373 0.0 0.0 0.0
1983 773 0.0 0.0 0.0
1984 3933 0.0 0.0 0.0
1985 4049 0.0 0.0 0.0
1986 5120 0.0 0.0 0.0
1987 4835 0.0 0.0 0.0
1988 3237 0.0 0.0 0.0
1989 2062 0.0 0.0 0.0
1991 847 0.0 0.0 0.0
1992 3322 0.0 0.0 0.0
1993 6351 0.0 0.0 0.0
1994 8205 0.0 0.0 0.0
1995 8050 0.0 0.0 0.0
1996 8149 0.0 0.0 0.0
1997 8259 0.0 0.0 0.0
1998 8312 0.0 0.0 0.0
1999 8520 0.0 0.0 0.0
2000 8124 0.0 0.0 0.0
2001 8608 0.0 0.0 0.0
2002 8618 0.0 0.0 0.0
2003 8329 0.0 0.0 0.0
2004 8766 0.0 0.0 0.0
2005 8234 0.0 0.0 0.0
2006 8341 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 6863 0.0 0.0 0.0
2010 7084 0.0 0.0 0.0
2011 8183 0.0 0.0 0.0
2012 8233 0.0 0.0 0.0
2013 8375 0.0 0.0 0.0
2014 7703 0.0 0.0 0.0
2015 8209 0.0 0.0 0.0
2016 5664 0.0 0.0 0.0
2017 4391 0.0 0.0 0.0
2018 4394 0.0 0.0 0.0
2019 7439 0.0 0.0 0.0
2020 2160 0.0 0.0 0.0

For data sources see[5]

References