X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535191011002

Well Details

Well ID: 0535191011002
Loading map...
Location: 00/11-10-053-19W5/2
Location Alias: 00/11-10-53-19 W5M
Location Alias 2: 00/11-10-053-19 W5/02
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 19
Section: 10
County/Municipality: Yellowhead County
Well Name: TALISMAN EDSON 11-10-53-19
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0029954
License Date: 1966-02-04
License Status: Suspension
Spud Date: 1966-02-12
Final Drill Date: 1966-04-08
Well Total Depth: 2928.50 m
Surface Hole Latitude: 53.564741
Surface Hole Longitude: -116.719198

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-02-04 Obtained License
1966-04-06 Drill Stem Test Performed
1966-04-08 Finished Drilling
1966-04-08 Well Mode changed to Drilled and Cased
1966-04-11 Drill Stem Test Performed
1966-04-13 Drill Stem Test Performed
1966-04-15 Production Casing Operation Performed
1966-06-26 Perforation Treatment Performed - Jet Perforation
1966-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-01-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-01-27 Plug Back Performed
1993-01-27 Well Log Performed
1993-01-29 Perforation Treatment Performed - Jet Perforation
1993-01-29 Well Log Performed
1993-01-31 Perforation Treatment Performed - Fractured
1993-02-06 Well Log Performed
1993-02-07 Well Began Production
1993-02-07 Well Fluid changed to Gas
1993-02-07 Well Mode changed to Flowing
2009-10-01 Well Fluid changed to Gas
2009-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-06-26 Perforation 2905.00 2908.10 13
1966-06-27 Acid Treatment 2905.00 2908.10 0
1993-01-27 Packing Device Capped w/Cement 2872.00 2880.00 0
1993-01-29 Perforation 2470.40 2475.40 13
1993-01-31 Fracture 2470.40 2475.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1252 0.0 0.0 0.0
1994 1256 0.0 0.0 0.0
1995 1043 0.0 0.0 0.0
2001 49 0.0 0.0 0.0
2002 802 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 1781 0.0 0.0 0.0
2008 744 0.0 0.0 0.0
2009 743 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-02 No Incident Encountered 0.00 0.00

For data sources see[6]

References