If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0535191709022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.57995,"lon":-116.751755,"icon":""}]} |
Location: 02/09-17-053-19W5/2 | |
Location Alias: 02/09-17-53-19 W5M | |
Location Alias 2: 02/09-17-053-19 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 053 | |
Meridian: 5 | |
Range: 19 | |
Section: 17 | |
County/Municipality: Yellowhead County | |
Well Name: CCS EDSON 9-17-53-19 | |
Operator Name: Tervita Corporation | |
License Number: 0271291 | |
License Date: 2002-06-26 | |
License Status: Suspension | |
Spud Date: 2002-08-18 | |
Final Drill Date: 2002-10-04 | |
Well Total Depth: 4026.00 m | |
Surface Hole Latitude: 53.579950 | |
Surface Hole Longitude: -116.751755 |
Date | Event |
---|---|
2002-06-26 | Obtained License |
2002-08-20 | Surface Casing Operation Performed |
2002-09-10 | Well Log Performed |
2002-09-13 | Intermediate Casing Operation Performed |
2002-09-22 | Direction Drilling Operation Performed - Deviate |
2002-10-02 | Well Log Performed |
2002-10-04 | Finished Drilling |
2002-10-04 | Well Mode changed to Drilled and Cased |
2002-10-05 | Well Log Performed |
2002-10-06 | Well Log Performed |
2002-10-07 | Liner Casing Operation Performed |
2002-10-09 | Rig Released |
2002-11-10 | Well Log Performed |
2002-11-12 | Perforation Treatment Performed - Jet Perforation |
2002-11-13 | Perforation Treatment Performed - Jet Perforation |
2002-11-14 | Perforation Treatment Performed - Jet Perforation |
2002-11-18 | Perforation Treatment Performed - Chemical Squeeze |
2002-11-29 | Perforation Treatment Performed - Jet Perforation |
2002-12-01 | Perforation Treatment Performed - Chemical Squeeze |
2002-12-09 | Perforation Treatment Performed - Chemical Squeeze |
2002-12-10 | Perforation Treatment Performed - Chemical Squeeze |
2002-12-11 | Well Log Performed |
2003-12-23 | Perforation Treatment Performed - Jet Perforation |
2004-01-28 | Perforation Treatment Performed - Jet Perforation |
2004-02-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2004-02-05 | Well Log Performed |
2012-07-11 | Perforation Treatment Performed - Cement Squeeze |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2002-09-22 | 3030.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-11-12 | Perforation | 4011.00 | 4015.00 | 20 |
2002-11-14 | Perforation | 3795.00 | 3804.00 | 20 |
2002-11-14 | Perforation | 3786.00 | 3792.00 | 20 |
2002-11-14 | Perforation | 3781.00 | 3786.00 | 20 |
2002-11-14 | Perforation | 3757.00 | 3762.00 | 20 |
2002-11-14 | Perforation | 3752.00 | 3757.00 | 20 |
2002-11-18 | Chemical Squeeze | 4002.00 | 4015.00 | 0 |
2002-11-18 | Chemical Squeeze | 3977.00 | 3982.00 | 0 |
2002-11-18 | Chemical Squeeze | 3950.00 | 3959.00 | 0 |
2002-11-29 | Perforation | 3847.00 | 3854.00 | 20 |
2002-12-01 | Chemical Squeeze | 3847.00 | 3854.00 | 0 |
2002-11-12 | Perforation | 4002.00 | 4011.00 | 20 |
2002-12-01 | Chemical Squeeze | 3857.00 | 3863.00 | 0 |
2002-12-09 | Chemical Squeeze | 3837.00 | 3848.00 | 0 |
2002-12-09 | Chemical Squeeze | 3826.00 | 3833.00 | 0 |
2002-12-09 | Chemical Squeeze | 3814.00 | 3823.00 | 0 |
2002-12-10 | Chemical Squeeze | 3752.00 | 3762.00 | 0 |
2002-12-10 | Chemical Squeeze | 3781.00 | 3792.00 | 0 |
2002-12-10 | Chemical Squeeze | 3795.00 | 3804.00 | 0 |
2003-12-23 | Perforation | 3399.00 | 3505.00 | 17 |
2004-01-28 | Perforation | 2955.00 | 2981.00 | 17 |
2004-02-03 | Acid Treatment | 2955.00 | 2981.00 | 0 |
2002-11-12 | Perforation | 3977.00 | 3982.00 | 20 |
2012-07-11 | Cement Squeeze | 3399.00 | 3505.00 | 0 |
2002-11-13 | Perforation | 3950.00 | 3959.00 | 20 |
2002-11-13 | Perforation | 3938.00 | 3942.00 | 20 |
2002-11-13 | Perforation | 3857.00 | 3863.00 | 20 |
2002-11-13 | Perforation | 3837.00 | 3842.00 | 20 |
2002-11-13 | Perforation | 3826.00 | 3833.00 | 20 |
2002-11-13 | Perforation | 3814.00 | 3823.00 | 20 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-10-01 | No Incident Encountered | 0.00 | 0.00 |
2015-05-04 | No Incident Encountered | 0.00 | 0.00 |
2014-10-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]