X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535200609002

Well Details

Well ID: 0535200609002
Loading map...
Location: 00/09-06-053-20W5/2
Location Alias: 00/09-06-53-20 W5M
Location Alias 2: 00/09-06-053-20 W5/02
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 20
Section: 06
County/Municipality: Yellowhead County
Well Name: TALISMAN ET AL ANSELL 9-6-53-20
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0205850
License Date: 1997-09-09
License Status: Issued
Spud Date: 1997-10-07
Final Drill Date: 1997-10-31
Well Total Depth: 3210.00 m
Surface Hole Latitude: 53.549266
Surface Hole Longitude: -116.925809

For data sources see[1][2]

Well History

Date Event
1997-09-09 Obtained License
1997-10-10 Surface Casing Operation Performed
1997-10-31 Finished Drilling
1997-10-31 Well Log Performed
1997-10-31 Well Mode changed to Drilled and Cased
1997-11-02 Drill Stem Test Performed
1997-11-04 Drill Stem Test Performed
1997-11-05 Production Casing Operation Performed
1997-11-07 Rig Released
1998-01-13 Perforation Treatment Performed - Jet Perforation
1998-01-13 Well Log Performed
1998-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-01-17 Well Log Performed
1998-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-01-18 Perforation Treatment Performed - Jet Perforation
1998-01-18 Plug Back Performed
1998-01-18 Well Log Performed
1998-01-28 Perforation Treatment Performed - Fractured
1998-03-15 Perforation Treatment Performed - Jet Perforation
1998-03-15 Well Log Performed
1998-03-15 Well Mode changed to Drilled and Cased
1998-03-18 Perforation Treatment Performed - Fractured
2000-01-20 Well Began Production
2000-01-20 Well Fluid changed to Gas
2000-01-20 Well Mode changed to Flowing
2001-03-01 Well Fluid changed to Gas
2001-03-01 Well Mode changed to Pumping
2003-04-11 Well Log Performed
2003-04-15 Well Log Performed
2003-04-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-04-23 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-01-13 Perforation 3111.00 3118.00 18
1998-01-15 Acid Treatment 3111.00 3118.00 0
1998-01-18 Packing Device Capped w/Cement 3098.00 3105.00 0
1998-01-18 Perforation 2704.50 2709.50 18
1998-01-28 Fracture 2704.50 2709.50 0
1998-03-15 Perforation 2263.00 2269.00 18
1998-03-18 Fracture 2263.00 2269.00 0
2003-04-21 Packing Device Capped w/Cement 3081.00 3089.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 6933 0.0 0.0 0.0
2001 6665 0.0 0.0 0.0
2002 5571 0.0 0.0 0.0

For data sources see[5]

References