X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535211904003

Well Details

Well ID: 0535211904003
Loading map...
Location: 00/04-19-053-21W5/3
Location Alias: 00/04-19-53-21 W5M
Location Alias 2: 00/04-19-053-21 W5/03
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 21
Section: 19
County/Municipality: Yellowhead County
Well Name: TALISMAN MEDLOD 4-19-53-21
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0397546
License Date: 2008-06-13
License Status: Issued
Spud Date: 2008-12-11
Final Drill Date: 2009-01-20
Well Total Depth: 3278.00 m
Surface Hole Latitude: 53.586107
Surface Hole Longitude: -117.087570

For data sources see[1][2]

Well History

Date Event
2008-06-13 Obtained License
2008-12-15 Surface Casing Operation Performed
2008-12-19 Direction Drilling Operation Performed - Deviate
2008-12-29 Lost Circulation Occurred
2009-01-20 Finished Drilling
2009-01-20 Production Casing Operation Performed
2009-01-20 Well Log Performed
2009-01-20 Well Mode changed to Drilled and Cased
2009-01-21 Rig Released
2009-01-31 Well Log Performed
2009-02-01 Well Log Performed
2009-02-19 Perforation Treatment Performed - Jet Perforation
2009-02-20 Perforation Treatment Performed - Fractured
2009-02-23 Perforation Treatment Performed - Jet Perforation
2009-02-24 Perforation Treatment Performed - Fractured
2009-02-26 Well Log Performed
2009-04-01 Well Structure changed to Commingled
2010-02-19 Perforation Treatment Performed - Jet Perforation
2010-02-20 Perforation Treatment Performed - Fractured
2010-02-23 Perforation Treatment Performed - Jet Perforation
2010-02-24 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-12-19 1516.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-02-19 Perforation 3240.00 3240.30 3
2009-02-23 Perforation 3111.50 3111.80 3
2009-02-23 Perforation 3105.00 3105.30 3
2009-02-23 Perforation 3143.90 3144.20 3
2009-02-23 Perforation 3147.70 3148.00 3
2009-02-23 Perforation 3128.50 3128.80 3
2009-02-24 Fracture 3105.00 3116.80 0
2009-02-24 Fracture 3128.50 3148.00 0
2010-02-19 Perforation 3240.00 3240.30 3
2010-02-19 Perforation 3237.50 3237.80 3
2010-02-19 Perforation 3233.00 3233.30 3
2009-02-19 Perforation 3237.50 3237.80 3
2010-02-19 Perforation 3247.50 3247.80 3
2010-02-19 Perforation 3250.70 3251.00 3
2010-02-19 Perforation 3259.00 3259.30 3
2010-02-20 Fracture 3233.00 3247.80 0
2010-02-20 Fracture 3250.70 3259.30 0
2010-02-23 Perforation 3128.50 3128.80 3
2010-02-23 Perforation 3116.50 3116.80 3
2010-02-23 Perforation 3147.70 3148.00 3
2010-02-23 Perforation 3143.90 3144.20 3
2010-02-24 Fracture 3116.50 3116.80 0
2009-02-19 Perforation 3233.00 3233.30 3
2010-02-24 Fracture 3128.50 3148.00 0
2009-02-19 Perforation 3247.50 3247.80 3
2009-02-19 Perforation 3259.00 3259.30 3
2009-02-19 Perforation 3250.70 3251.00 3
2009-02-20 Fracture 3233.00 3247.80 0
2009-02-20 Fracture 3250.70 3259.30 0
2009-02-23 Perforation 3116.50 3116.80 3

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2008-12-29 Lost Circulation 3159.00 3182.00

For data sources see[6]

References