If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0535212501004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.601154,"lon":-116.956627,"icon":""}]} |
| Location: 00/01-25-053-21W5/4 | |
| Location Alias: 00/01-25-53-21 W5M | |
| Location Alias 2: 00/01-25-053-21 W5/04 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 053 | |
| Meridian: 5 | |
| Range: 21 | |
| Section: 25 | |
| County/Municipality: Yellowhead County | |
| Well Name: TALISMAN ANSELL 1-25-53-21 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0427494 | |
| License Date: 2010-12-10 | |
| License Status: Issued | |
| Spud Date: 2011-09-11 | |
| Final Drill Date: 2011-09-26 | |
| Well Total Depth: 3076.00 m | |
| Surface Hole Latitude: 53.601154 | |
| Surface Hole Longitude: -116.956627 |
| Date | Event |
|---|---|
| 2010-12-10 | Obtained License |
| 2011-09-11 | Well Log Performed |
| 2011-09-14 | Surface Casing Operation Performed |
| 2011-09-17 | Direction Drilling Operation Performed - Deviate |
| 2011-09-22 | Intermediate Casing Operation Performed |
| 2011-09-26 | Finished Drilling |
| 2011-09-26 | Well Mode changed to Drilled and Cased |
| 2011-09-27 | Well Log Performed |
| 2011-09-28 | Production Casing Operation Performed |
| 2011-09-28 | Rig Released |
| 2011-10-15 | Perforation Treatment Performed - Jet Perforation |
| 2011-10-20 | Perforation Treatment Performed - Fractured |
| 2011-10-20 | Perforation Treatment Performed - Jet Perforation |
| 2011-10-21 | Perforation Treatment Performed - Fractured |
| 2011-10-21 | Perforation Treatment Performed - Jet Perforation |
| 2011-10-22 | Perforation Treatment Performed - Fractured |
| 2011-10-22 | Perforation Treatment Performed - Jet Perforation |
| 2011-11-09 | Well Structure changed to Commingled |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-09-17 | 1363.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-10-15 | Perforation | 3057.00 | 3057.60 | 13 |
| 2011-10-20 | Perforation | 2962.00 | 2962.60 | 13 |
| 2011-10-21 | Fracture | 2962.00 | 2970.60 | 0 |
| 2011-10-21 | Perforation | 2929.00 | 2929.60 | 13 |
| 2011-10-21 | Perforation | 2926.00 | 2926.60 | 13 |
| 2011-10-21 | Fracture | 2926.00 | 2929.60 | 0 |
| 2011-10-22 | Perforation | 2866.00 | 2866.30 | 13 |
| 2011-10-22 | Perforation | 2863.00 | 2863.30 | 13 |
| 2011-10-22 | Perforation | 2860.00 | 2860.60 | 13 |
| 2011-10-22 | Perforation | 2850.00 | 2850.30 | 13 |
| 2011-10-22 | Perforation | 2847.00 | 2847.30 | 13 |
| 2011-10-15 | Perforation | 3052.00 | 3052.30 | 13 |
| 2011-10-22 | Perforation | 2844.00 | 2844.60 | 13 |
| 2011-10-22 | Fracture | 2844.00 | 2866.30 | 0 |
| 2011-10-22 | Perforation | 2812.00 | 2812.30 | 13 |
| 2011-10-22 | Perforation | 2808.70 | 2809.00 | 13 |
| 2011-10-22 | Perforation | 2806.00 | 2806.30 | 13 |
| 2011-10-22 | Perforation | 2740.00 | 2740.30 | 13 |
| 2011-10-22 | Perforation | 2735.00 | 2735.60 | 13 |
| 2011-10-22 | Perforation | 2730.00 | 2730.60 | 13 |
| 2011-10-22 | Fracture | 2730.00 | 2812.30 | 0 |
| 2011-10-15 | Perforation | 3049.00 | 3049.30 | 13 |
| 2011-10-15 | Perforation | 3042.00 | 3042.30 | 13 |
| 2011-10-15 | Perforation | 3037.00 | 3037.30 | 13 |
| 2011-10-15 | Perforation | 3034.00 | 3034.30 | 13 |
| 2011-10-20 | Fracture | 3034.00 | 3057.60 | 0 |
| 2011-10-20 | Perforation | 2970.00 | 2970.60 | 13 |
| 2011-10-20 | Perforation | 2967.00 | 2967.30 | 13 |
For data sources see[5]