X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535212716020

Well Details

Well ID: 0535212716020
Loading map...
Location: 02/16-27-053-21W5/0
Location Alias: 02/16-27-53-21 W5M
Location Alias 2: 02/16-27-053-21 W5/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 21
Section: 27
County/Municipality: Yellowhead County
Well Name: TALISMAN 02 ANSELL 16-27-53-21
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0436140
License Date: 2011-08-18
License Status: Issued
Spud Date: 2011-10-05
Final Drill Date: 2011-10-20
Well Total Depth: 3184.00 m
Surface Hole Latitude: 53.608862
Surface Hole Longitude: -117.001262

For data sources see[1][2]

Well History

Date Event
2011-08-18 Obtained License
2011-10-07 Surface Casing Operation Performed
2011-10-09 Direction Drilling Operation Performed - Deviate
2011-10-11 Intermediate Casing Operation Performed
2011-10-20 Finished Drilling
2011-10-20 Production Casing Operation Performed
2011-10-20 Well Log Performed
2011-10-20 Well Mode changed to Drilled and Cased
2011-10-21 Well Log Performed
2011-10-22 Rig Released
2011-11-07 Perforation Treatment Performed - Jet Perforation
2011-11-09 Perforation Treatment Performed - Fractured
2011-11-12 Perforation Treatment Performed - Fractured
2011-11-12 Perforation Treatment Performed - Jet Perforation
2011-11-13 Perforation Treatment Performed - Fractured
2011-11-13 Perforation Treatment Performed - Jet Perforation
2011-11-14 Perforation Treatment Performed - Fractured
2011-12-15 Well Began Production
2011-12-15 Well Fluid changed to Gas
2011-12-15 Well Mode changed to Flowing
2012-04-01 Well Fluid changed to Gas
2012-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-09 1020.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-07 Perforation 3170.50 3171.40 13
2011-11-12 Perforation 2986.70 2987.00 13
2011-11-12 Perforation 3073.10 3074.00 13
2011-11-12 Perforation 3090.00 3090.30 13
2011-11-12 Perforation 3111.70 3112.00 13
2011-11-12 Fracture 3070.50 3112.00 0
2011-11-12 Perforation 3070.50 3071.40 13
2011-11-12 Perforation 2999.40 3000.00 13
2011-11-13 Perforation 2837.70 2838.00 13
2011-11-13 Perforation 2843.40 2844.00 13
2011-11-13 Perforation 2798.00 2798.30 13
2011-11-07 Perforation 3173.10 3174.00 13
2011-11-13 Perforation 2827.40 2828.00 13
2011-11-13 Fracture 2918.70 2963.30 0
2011-11-13 Fracture 2973.70 3000.00 0
2011-11-13 Perforation 2860.70 2861.00 13
2011-11-13 Perforation 2865.00 2865.60 13
2011-11-14 Fracture 2798.00 2798.30 0
2011-11-14 Fracture 2827.40 2865.60 0
2011-11-09 Fracture 3170.50 3174.00 0
2011-11-12 Perforation 2973.70 2974.00 13
2011-11-12 Perforation 2978.70 2979.00 13
2011-11-12 Perforation 2982.70 2983.00 13
2011-11-12 Perforation 2918.70 2919.00 13
2011-11-12 Perforation 2960.70 2961.00 13
2011-11-12 Perforation 2963.00 2963.30 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 312 0.0 0.0 0.0
2012 8735 0.0 0.0 0.0
2013 8739 0.0 0.0 0.0
2014 8423 0.0 0.0 0.0
2015 7536 0.0 0.0 0.0
2016 8615 0.0 0.0 0.0
2017 6202 0.0 0.0 0.0
2018 8328 0.0 0.0 0.0
2019 8300 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[6]

References