If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0535223508000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.624963,"lon":-117.128293,"icon":""}]} |
| Location: 00/08-35-053-22W5/0 | |
| Location Alias: 00/08-35-53-22 W5M | |
| Location Alias 2: 00/08-35-053-22 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 053 | |
| Meridian: 5 | |
| Range: 22 | |
| Section: 35 | |
| County/Municipality: Yellowhead County | |
| Well Name: TOURMALINE SUNDANCE 8-35-53-22 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0411264 | |
| License Date: 2009-07-02 | |
| License Status: Issued | |
| Spud Date: 2009-07-25 | |
| Final Drill Date: 2009-08-09 | |
| Well Total Depth: 3250.50 m | |
| Surface Hole Latitude: 53.624963 | |
| Surface Hole Longitude: -117.128293 |
| Date | Event |
|---|---|
| 2009-07-02 | Obtained License |
| 2009-07-27 | Surface Casing Operation Performed |
| 2009-07-28 | Direction Drilling Operation Performed - Deviate |
| 2009-08-07 | Well Log Performed |
| 2009-08-08 | Well Log Performed |
| 2009-08-09 | Finished Drilling |
| 2009-08-09 | Production Casing Operation Performed |
| 2009-08-09 | Well Mode changed to Drilled and Cased |
| 2009-08-10 | Rig Released |
| 2009-09-07 | Perforation Treatment Performed - Jet Perforation |
| 2009-09-07 | Well Log Performed |
| 2009-09-08 | Perforation Treatment Performed - Fractured |
| 2009-09-09 | Perforation Treatment Performed - Fractured |
| 2009-09-09 | Perforation Treatment Performed - Jet Perforation |
| 2009-09-09 | Well Log Performed |
| 2009-09-10 | Perforation Treatment Performed - Fractured |
| 2009-09-10 | Perforation Treatment Performed - Jet Perforation |
| 2009-09-10 | Well Log Performed |
| 2009-11-11 | Well Began Production |
| 2009-11-11 | Well Fluid changed to Gas |
| 2009-11-11 | Well Mode changed to Flowing |
| 2014-04-14 | Well Fluid changed to Gas |
| 2014-04-14 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2009-07-28 | 650.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2009-09-07 | Perforation | 3231.00 | 3232.00 | 9 |
| 2009-09-09 | Perforation | 3103.00 | 3104.00 | 3 |
| 2009-09-09 | Perforation | 3092.00 | 3093.00 | 3 |
| 2009-09-09 | Fracture | 3092.00 | 3187.00 | 0 |
| 2009-09-09 | Perforation | 3053.00 | 3054.00 | 3 |
| 2009-09-09 | Perforation | 3035.00 | 3036.00 | 3 |
| 2009-09-09 | Perforation | 3029.00 | 3030.00 | 6 |
| 2009-09-09 | Perforation | 2922.00 | 2923.00 | 3 |
| 2009-09-09 | Perforation | 2916.00 | 2917.00 | 3 |
| 2009-09-09 | Perforation | 2910.00 | 2911.00 | 6 |
| 2009-09-09 | Perforation | 2905.00 | 2906.00 | 20 |
| 2009-09-07 | Perforation | 3216.00 | 3217.00 | 3 |
| 2009-09-10 | Fracture | 2905.00 | 3054.00 | 0 |
| 2009-09-10 | Perforation | 2879.00 | 2880.00 | 3 |
| 2009-09-10 | Perforation | 2871.00 | 2872.00 | 3 |
| 2009-09-10 | Perforation | 2867.00 | 2868.00 | 9 |
| 2009-09-10 | Perforation | 2863.00 | 2864.00 | 9 |
| 2009-09-10 | Perforation | 2846.00 | 2847.00 | 3 |
| 2009-09-10 | Fracture | 2846.00 | 2880.00 | 0 |
| 2009-09-07 | Perforation | 3210.00 | 3211.00 | 6 |
| 2009-09-07 | Perforation | 3205.00 | 3206.00 | 9 |
| 2009-09-08 | Fracture | 3205.00 | 3232.00 | 0 |
| 2009-09-09 | Perforation | 3186.00 | 3187.00 | 3 |
| 2009-09-09 | Perforation | 3164.00 | 3165.00 | 3 |
| 2009-09-09 | Perforation | 3157.00 | 3158.00 | 6 |
| 2009-09-09 | Perforation | 3152.00 | 3153.00 | 9 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 1041 | 0.0 | 0.0 | 0.0 |
| 2010 | 8563 | 0.0 | 0.0 | 0.0 |
| 2011 | 8437 | 0.0 | 0.0 | 0.0 |
| 2012 | 8302 | 0.0 | 0.0 | 0.0 |
| 2013 | 8575 | 0.0 | 0.0 | 0.0 |
| 2014 | 8626 | 0.0 | 0.0 | 0.0 |
| 2015 | 8700 | 0.0 | 0.0 | 0.0 |
| 2016 | 8435 | 0.0 | 0.0 | 0.0 |
| 2017 | 8663 | 0.0 | 0.0 | 0.0 |
| 2018 | 8747 | 0.0 | 0.0 | 0.0 |
| 2019 | 8687 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]