X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535233103022

Well Details

Well ID: 0535233103022
Loading map...
Location: 02/03-31-053-23W5/2
Location Alias: 02/03-31-53-23 W5M
Location Alias 2: 02/03-31-053-23 W5/02
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 23
Section: 31
County/Municipality: Yellowhead County
Well Name: TOURMALINE PEDLEY 3-31-53-23
Operator Name: Tourmaline Oil Corp.
License Number: 0477814
License Date: 2015-11-20
License Status: Issued
Spud Date: 2016-02-01
Final Drill Date: 2016-04-04
Well Total Depth: 5260.00 m
Surface Hole Latitude: 53.614287
Surface Hole Longitude: -117.414847

For data sources see[1][2]

Well History

Date Event
2015-11-20 Obtained License
2016-02-02 Direction Drilling Operation Performed - Deviate
2016-02-02 Surface Casing Operation Performed
2016-02-08 Intermediate Casing Operation Performed
2016-03-29 Direction Drilling Operation Performed - Horizontal
2016-04-04 Finished Drilling
2016-04-04 Well Log Performed
2016-04-04 Well Mode changed to Drilled and Cased
2016-04-07 Production Casing Operation Performed
2016-04-09 Rig Released
2016-06-15 Perforation Treatment Performed - Open-Hole Completion
2016-06-23 Well Log Performed
2016-07-01 Perforation Treatment Performed - Jet Perforation
2016-07-04 Perforation Treatment Performed - Fractured
2016-07-04 Perforation Treatment Performed - Multi-Stage Fracture
2016-07-05 Perforation Treatment Performed - Multi-Stage Fracture
2016-07-12 Well Fluid changed to Gas
2016-07-12 Well Mode changed to Testing
2016-09-22 Well Began Production
2016-09-22 Well Fluid changed to Gas
2016-09-22 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2016-02-02 247.00 Deviate (5 - 79 degrees)
2016-03-29 3482.20 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-06-15 Open Hole/Barefoot Completion 5255.50 5260.00 0
2016-07-05 Multi-Stage Fracture 4746.10 4746.90 0
2016-07-05 Multi-Stage Fracture 4695.50 4696.30 0
2016-07-05 Multi-Stage Fracture 4623.70 4624.60 0
2016-07-05 Multi-Stage Fracture 4569.30 4570.10 0
2016-07-05 Multi-Stage Fracture 4514.00 4514.80 0
2016-07-05 Multi-Stage Fracture 4455.90 4456.80 0
2016-07-05 Multi-Stage Fracture 4386.30 4387.20 0
2016-07-05 Multi-Stage Fracture 4329.50 4330.40 0
2016-07-05 Multi-Stage Fracture 4272.90 4273.70 0
2016-07-05 Multi-Stage Fracture 4217.40 4218.20 0
2016-07-01 Perforation 5173.00 5176.00 20
2016-07-05 Multi-Stage Fracture 4148.20 4149.00 0
2016-07-05 Multi-Stage Fracture 4091.10 4091.90 0
2016-07-05 Multi-Stage Fracture 4022.70 4023.50 0
2016-07-05 Multi-Stage Fracture 3967.50 3968.40 0
2016-07-05 Multi-Stage Fracture 3916.20 3917.00 0
2016-07-05 Multi-Stage Fracture 3803.40 3804.20 0
2016-07-05 Multi-Stage Fracture 3691.70 3692.50 0
2016-07-05 Multi-Stage Fracture 3637.40 3638.30 0
2016-07-05 Multi-Stage Fracture 3582.10 3583.00 0
2016-07-05 Multi-Stage Fracture 3509.80 3510.70 0
2016-07-04 Fracture 5173.00 5176.00 0
2016-07-04 Multi-Stage Fracture 5136.30 5137.10 0
2016-07-04 Multi-Stage Fracture 5065.70 5066.50 0
2016-07-04 Multi-Stage Fracture 5011.20 5012.00 0
2016-07-05 Multi-Stage Fracture 4941.40 4942.20 0
2016-07-05 Multi-Stage Fracture 4873.40 4874.20 0
2016-07-05 Multi-Stage Fracture 4817.50 4818.30 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-07-04 2016-07-05 3,232 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water Not Available 100 79.6677 N/A
SAND-COMMON BROWN-40/70. BULK Halliburton Crystalline silica. quartz 14808-60-7 100 20.2897 N/A
MC B-8510 MultiChem Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0 N/A
Dibromaocetonitrile 3252-43-5 100 0 N/A
Inert Ingredient Not Available 100 0 N/A
Sodium bromide 7647-15-6 100 0 N/A
FR-66 Halliburton Friction Reducer Ammonium chloride 12125-02-9 100 0.0424 N/A
Ethoxylated alcohols 9068 100 0.0424 N/A
Fatty nitrogen derived amides 9068 100 0.0424 N/A
Hydrotreated light petroleum distillate 64742-47-8 100 0.0424 N/A
Inert ingredient(s) Not Available 100 0.0424 N/A
Proprietary ingredient(s) Trade Secret 100 0.0403 N/A
MC S-2730 MutliChem Scale Inhibitor Inert Ingredient Not Available 100 0 N/A
Methyl alcohol 67-56-1 100 0 N/A
Phosphonic acid. [[(phosphonomethyl)imino]bis[2.1-ethanediy
l
22042-96-2 100 0 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-07-01 2016-07-08 Surface Water - Runoff 4035

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 2020 0.0 0.0 0.0
2017 8541 0.0 0.0 0.0
2018 8752 0.0 0.0 0.0
2019 8757 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-04-09 No Incident Encountered 0.00 0.00
2016-07-09 No Incident Encountered 0.00 0.00

For data sources see[9]

References