X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535233106000

Well Details

Well ID: 0535233106000
Loading map...
Location: 00/06-31-053-23W5/0
Location Alias: 00/06-31-53-23 W5M
Location Alias 2: 00/06-31-053-23 W5/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 23
Section: 31
County/Municipality: Yellowhead County
Well Name: TOURMALINE SUNDANCE 6-31-53-23
Operator Name: Tourmaline Oil Corp.
License Number: 0432696
License Date: 2011-03-31
License Status: Amended
Spud Date: 2011-11-05
Final Drill Date: 2011-12-05
Well Total Depth: 4070.40 m
Surface Hole Latitude: 53.624167
Surface Hole Longitude: -117.388551

For data sources see[1][2]

Well History

Date Event
2011-03-31 Obtained License
2011-11-06 Direction Drilling Operation Performed - Deviate
2011-11-07 Surface Casing Operation Performed
2011-11-14 Well Log Performed
2011-11-19 Direction Drilling Operation Performed - Horizontal
2011-12-03 Well Log Performed
2011-12-04 Well Log Performed
2011-12-05 Finished Drilling
2011-12-05 Well Mode changed to Drilled and Cased
2011-12-06 Production Casing Operation Performed
2011-12-08 Rig Released
2012-01-01 Well Fluid changed to Gas
2012-01-01 Well Mode changed to Testing
2012-01-14 Well Log Performed
2012-01-20 Perforation Treatment Performed - Open-Hole Completion
2012-01-23 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-01 Well Began Production
2012-02-01 Well Fluid changed to Gas
2012-02-01 Well Mode changed to Flowing
2013-11-01 Well Fluid changed to Gas
2013-11-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-06 190.70 Deviate (5 - 79 degrees)
2011-11-19 3293.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-20 Open Hole/Barefoot Completion 3704.50 3707.00 0
2012-01-23 Multi-Stage Fracture 3680.50 3680.60 0
2012-01-23 Multi-Stage Fracture 3634.90 3635.10 0
2012-01-23 Multi-Stage Fracture 3557.00 3557.10 0
2012-01-24 Multi-Stage Fracture 3478.10 3478.20 0
2012-01-24 Multi-Stage Fracture 3399.00 3399.10 0
2012-01-24 Multi-Stage Fracture 3319.80 3319.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7949 0.0 0.0 0.0
2013 8311 0.0 0.0 0.0
2014 7079 0.0 0.0 0.0
2015 8475 0.0 0.0 0.0
2016 7736 0.0 0.0 0.0
2017 6805 0.0 0.0 0.0
2018 8574 0.0 0.0 0.0
2019 7976 0.0 0.0 0.0
2020 744 0.0 0.0 0.0

For data sources see[6]

References