If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0536013108000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.622129,"lon":-118.124251,"icon":""}]} |
Location: 00/08-31-053-01W6/0 | |
Location Alias: 00/08-31-53-01 W6M | |
Location Alias 2: 00/08-31-053-01 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 053 | |
Meridian: 6 | |
Range: 01 | |
Section: 31 | |
County/Municipality: Yellowhead County | |
Well Name: OEI SOLOMON 8-31-53-1 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0235653 | |
License Date: 2000-03-25 | |
License Status: Abandoned | |
Spud Date: 2000-04-05 | |
Final Drill Date: 2000-04-25 | |
Well Total Depth: 2365.00 m | |
Surface Hole Latitude: 53.622129 | |
Surface Hole Longitude: -118.124251 |
Date | Event |
---|---|
2000-03-25 | Obtained License |
2000-04-10 | Surface Casing Operation Performed |
2000-04-15 | Direction Drilling Operation Performed - Deviate |
2000-04-25 | Finished Drilling |
2000-04-25 | Well Log Performed |
2000-04-28 | Drill Stem Test Performed |
2000-04-30 | Production Casing Operation Performed |
2000-05-01 | Rig Released |
2000-05-01 | Well Mode changed to Drilled and Cased |
2000-05-03 | Well Log Performed |
2000-06-29 | Perforation Treatment Performed - Open-Hole Completion |
2000-07-02 | Well Log Performed |
2000-07-10 | Perforation Treatment Performed - Fractured |
2004-03-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-03-08 | Plug Back Performed |
2004-03-08 | Well Log Performed |
2004-03-08 | Well Mode changed to Abandoned Zone |
2007-03-19 | Well Abandoned |
2007-03-19 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2000-04-15 | 1500.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-06-29 | Open Hole/Barefoot Completion | 2222.00 | 2365.00 | 0 |
2000-07-10 | Fracture | 2220.00 | 2365.00 | 0 |
2004-03-08 | Packing Device Capped w/Cement | 2202.00 | 2210.00 | 0 |
For data sources see[5]