X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0544062601000

Well Details

Well ID: 0544062601000
Loading map...
Location: 00/01-26-054-06W4/0
Location Alias: 00/01-26-54-06 W4M
Location Alias 2: 00/01-26-054-06 W4/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 4
Range: 06
Section: 26
County/Municipality: County of Vermilion River
Well Name: RIFE ET AL DD LIND 1-26-54-6
Operator Name: Rife Resources Ltd.
License Number: 0464543
License Date: 2014-01-31
License Status: Issued
Spud Date: 2014-02-18
Final Drill Date: 2014-02-21
Well Total Depth: 666.00 m
Surface Hole Latitude: 53.688295
Surface Hole Longitude: -110.769057

For data sources see[1][2]

Well History

Date Event
2014-01-31 Obtained License
2014-02-19 Surface Casing Operation Performed
2014-02-20 Direction Drilling Operation Performed - Deviate
2014-02-21 Finished Drilling
2014-02-21 Production Casing Operation Performed
2014-02-21 Well Log Performed
2014-02-21 Well Mode changed to Drilled and Cased
2014-02-22 Rig Released
2014-03-10 Perforation Treatment Performed - Jet Perforation
2014-03-10 Well Log Performed
2014-03-11 Well Began Production
2014-03-11 Well Fluid changed to Crude Bitumen
2014-03-11 Well Mode changed to Flowing
2018-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-08 Perforation Treatment Performed - Jet Perforation
2018-03-08 Plug Back Performed
2018-03-08 Well Fluid changed to Crude Bitumen
2018-03-08 Well Mode changed to Abandoned Zone
2018-03-09 Well Fluid changed to Crude Bitumen
2018-03-09 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-02-18 Precision Drilling Corporation 180 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-02-20 170.00 Deviate (5 - 79 degrees)

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-03-10 Perforation 539.40 542.20 26
2018-03-08 Perforation 529.00 531.50 30
2018-03-08 Packing Device Capped w/Cement 537.80 538.20 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 6672 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8775 0.0 0.0 0.0
2017 8516 0.0 0.0 0.0
2018 7689 0.0 0.0 0.0
2019 8752 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-02-22 No Incident Encountered 0.00 0.00
2014-03-11 No Incident Encountered 0.00 0.00
2018-03-07 No Incident Encountered 0.00 0.00

For data sources see[8]

References