X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0544140706000

Well Details

Well ID: 0544140706000
Loading map...
Location: 00/06-07-054-14W4/0
Location Alias: 00/06-07-54-14 W4M
Location Alias 2: 00/06-07-054-14 W4/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 4
Range: 14
Section: 07
County/Municipality: County of Minburn No. 27
Well Name: PINE CLIFF WARWICK 6-7-54-14
Operator Name: Pine Cliff Energy Ltd.
License Number: 0057314
License Date: 1976-02-27
License Status: Suspension
Spud Date: 1976-02-28
Final Drill Date: 1976-03-02
Well Total Depth: 752.20 m
Surface Hole Latitude: 53.647829
Surface Hole Longitude: -112.059841

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-02-27 Obtained License
1976-03-02 Drill Stem Test Performed
1976-03-02 Finished Drilling
1976-03-02 Well Mode changed to Drilled and Cased
1976-03-03 Drill Stem Test Performed
1976-03-04 Production Casing Operation Performed
1976-03-15 Perforation Treatment Performed - Jet Perforation
1976-04-01 Well Began Production
1976-04-01 Well Fluid changed to Gas
1976-04-01 Well Mode changed to Flowing
1977-10-27 Perforation Treatment Performed - Jet Perforation
1977-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-10-30 Perforation Treatment Performed - Jet Perforation
1977-12-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-12-19 Well Fluid changed to Gas
1977-12-19 Well Mode changed to Abandoned Zone
1977-12-20 Perforation Treatment Performed - Jet Perforation
1979-03-03 Perforation Treatment Performed - Jet Perforation
1981-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-09-22 Perforation Treatment Performed - Jet Perforation
2011-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-01-26 Perforation Treatment Performed - Jet Perforation
2011-01-26 Plug Back Performed
2011-01-26 Well Log Performed
2011-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-01-28 Perforation Treatment Performed - Cement Squeeze
2011-01-28 Plug Back Performed
2011-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-02-09 Perforation Treatment Performed - Jet Perforation
2011-02-09 Perforation Treatment Performed - Remedial Casing
2011-02-09 Well Log Performed
2011-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-08 Perforation Treatment Performed - Jet Perforation
2011-03-08 Well Log Performed
2011-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-01-17 Perforation Treatment Performed - Jet Perforation
2013-01-18 Perforation Treatment Performed - Jet Perforation
2013-01-18 Well Log Performed
2013-01-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-01-19 Perforation Treatment Performed - Remedial Casing
2013-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-01-21 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-03-15 Perforation 689.50 690.40 7
1979-03-03 Perforation 642.50 643.70 10
1981-09-22 Packing Device Capped w/Cement 601.60 609.60 0
1981-09-22 Perforation 536.40 537.70 7
2011-01-26 Packing Device Capped w/Cement 564.00 572.00 0
2011-01-26 Perforation 536.00 538.00 17
2011-01-26 Acid Treatment 536.00 538.00 0
2011-01-28 Cement Squeeze 536.00 538.00 0
2011-01-28 Packing Device Capped w/Cement 523.00 533.00 0
2011-02-09 Perforation 348.00 350.00 17
2011-02-09 Acid Treatment 348.00 350.00 0
1977-10-27 Perforation 701.00 702.30 7
2011-02-09 Remedial Casing Cementing 348.00 350.00 0
2011-02-11 Packing Device Capped w/Cement 335.00 343.00 0
2011-03-08 Perforation 219.00 221.00 17
2011-03-12 Packing Device Capped w/Cement 204.00 212.00 0
2013-01-17 Perforation 219.00 221.00 17
2013-01-18 Perforation 275.00 277.00 17
2013-01-18 Perforation 253.00 256.00 17
2013-01-19 Remedial Casing Cementing 275.00 277.00 0
2013-01-19 Packing Device Capped w/Cement 262.00 270.00 0
2013-01-21 Remedial Casing Cementing 253.00 256.00 0
1977-10-29 Acid Treatment 701.00 702.30 0
2013-01-21 Packing Device Capped w/Cement 240.00 248.00 0
1977-10-30 Packing Device Capped w/Cement 698.00 698.00 0
1977-10-30 Perforation 618.40 620.00 7
1977-10-30 Perforation 621.50 624.80 7
1977-10-30 Perforation 628.50 629.70 7
1977-12-19 Packing Device Capped w/Cement 687.30 687.30 0
1977-12-20 Perforation 577.30 578.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 5760 0.0 0.0 0.0
1977 7261 0.0 0.0 0.0
1978 1411 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-08-21 No Incident Encountered 0.00 0.00

For data sources see[6]

References