If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0544212210000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.682354,"lon":-113.007608,"icon":""}]} |
Location: 00/10-22-054-21W4/0 | |
Location Alias: 00/10-22-54-21 W4M | |
Location Alias 2: 00/10-22-054-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 054 | |
Meridian: 4 | |
Range: 21 | |
Section: 22 | |
County/Municipality: Strathcona County | |
Well Name: AZTEC ET AL FTSASK 10-22-54-21 | |
Operator Name: Lightstream Resources Ltd. | |
License Number: 0083076 | |
License Date: 1980-05-28 | |
License Status: RecCertified | |
Spud Date: 1980-06-01 | |
Final Drill Date: 1980-06-09 | |
Well Total Depth: 1031.70 m | |
Surface Hole Latitude: 53.682354 | |
Surface Hole Longitude: -113.007608 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-05-28 | Obtained License |
1980-06-03 | Drill Stem Test Performed |
1980-06-09 | Finished Drilling |
1980-06-10 | Drill Stem Test Performed |
1980-06-11 | Production Casing Operation Performed |
1980-06-11 | Well Mode changed to Drilled and Cased |
1981-03-14 | Perforation Treatment Performed - Jet Perforation |
1994-11-22 | Well Began Production |
1994-11-22 | Well Fluid changed to Gas |
1994-11-22 | Well Mode changed to Flowing |
1996-02-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-02-17 | Plug Back Performed |
1996-02-17 | Well Log Performed |
1996-02-18 | Well Abandoned |
1996-02-18 | Well Fluid changed to Gas |
1996-02-18 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-03-14 | Perforation | 896.50 | 898.00 | 13 |
1996-02-17 | Packing Device Capped w/Cement | 882.00 | 890.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 982 | 0.0 | 0.0 | 0.0 |
1995 | 2758 | 0.0 | 0.0 | 0.0 |
For data sources see[5]