If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0544260105020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.633767,"lon":-113.70484,"icon":""}]} |
| Location: 02/05-01-054-26W4/0 | |
| Location Alias: 02/05-01-54-26 W4M | |
| Location Alias 2: 02/05-01-054-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 054 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 01 | |
| County/Municipality: St. Albert | |
| Well Name: DAYLIGHT 102 STAL-BLK 5-1-54-26 | |
| Operator Name: Sinopec Daylight Energy Ltd. | |
| License Number: 0314517 | |
| License Date: 2004-09-09 | |
| License Status: Abandoned | |
| Spud Date: 2004-09-15 | |
| Final Drill Date: 2004-10-11 | |
| Well Total Depth: 1475.50 m | |
| Surface Hole Latitude: 53.633767 | |
| Surface Hole Longitude: -113.704840 |
| Date | Event |
|---|---|
| 2004-09-09 | Obtained License |
| 2004-09-16 | Surface Casing Operation Performed |
| 2004-09-18 | Direction Drilling Operation Performed - Deviate |
| 2004-09-21 | Well Log Performed |
| 2004-09-22 | Intermediate Casing Operation Performed |
| 2004-09-27 | Well Mode changed to Drilled and Cased |
| 2004-09-28 | Well Log Performed |
| 2004-09-30 | Liner Casing Operation Performed |
| 2004-10-11 | Finished Drilling |
| 2004-10-11 | Perforation Treatment Performed - Open-Hole Completion |
| 2004-10-21 | Rig Released |
| 2004-11-03 | Well Began Production |
| 2004-11-03 | Well Fluid changed to Crude Oil |
| 2004-11-03 | Well Mode changed to Pumping |
| 2004-11-15 | Perforation Treatment Performed - Jet Perforation |
| 2004-11-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2004-11-22 | Perforation Treatment Performed - Cement Squeeze |
| 2004-11-22 | Plug Back Performed |
| 2004-11-29 | Perforation Treatment Performed - Jet Perforation |
| 2004-12-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2004-12-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2009-05-01 | Well Fluid changed to Crude Oil |
| 2009-05-01 | Well Mode changed to Suspended |
| 2009-08-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-08-25 | Plug Back Performed |
| 2009-08-25 | Well Fluid changed to Crude Oil |
| 2009-08-25 | Well Log Performed |
| 2009-08-25 | Well Mode changed to Abandoned Zone |
| 2009-08-26 | Perforation Treatment Performed - Cement Plug |
| 2009-11-17 | Perforation Treatment Performed - Jet Perforation |
| 2009-11-17 | Well Log Performed |
| 2009-11-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-11-18 | Well Log Performed |
| 2010-09-25 | Perforation Treatment Performed - Jet Perforation |
| 2010-09-25 | Well Log Performed |
| 2010-09-26 | Perforation Treatment Performed - Remedial Casing |
| 2010-10-05 | Well Log Performed |
| 2011-01-12 | Perforation Treatment Performed - Jet Perforation |
| 2011-01-15 | Perforation Treatment Performed - Jet Perforation |
| 2011-01-19 | Perforation Treatment Performed - Remedial Casing |
| 2011-06-09 | Well Abandoned |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2004-09-18 | 347.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2004-10-11 | Open Hole/Barefoot Completion | 1443.50 | 1475.50 | 0 |
| 2004-11-29 | Perforation | 1295.00 | 1296.50 | 20 |
| 2004-11-29 | Perforation | 1291.00 | 1293.50 | 20 |
| 2004-12-03 | Acid Treatment | 1295.00 | 1296.50 | 0 |
| 2004-12-03 | Acid Treatment | 1291.00 | 1293.50 | 0 |
| 2004-12-07 | Acid Treatment | 1265.00 | 1275.00 | 0 |
| 2009-08-25 | Packing Device Capped w/Cement | 1427.00 | 1435.00 | 0 |
| 2009-08-25 | Packing Device Capped w/Cement | 1227.80 | 1235.80 | 0 |
| 2009-08-26 | Cement Plug | 1131.80 | 1188.00 | 0 |
| 2009-11-17 | Perforation | 249.50 | 250.50 | 17 |
| 2009-11-18 | Packing Device Capped w/Cement | 237.00 | 245.00 | 0 |
| 2004-11-15 | Perforation | 1265.00 | 1275.00 | 20 |
| 2010-09-25 | Perforation | 87.00 | 88.00 | 20 |
| 2010-09-26 | Remedial Casing Cementing | 87.00 | 88.00 | 0 |
| 2011-01-12 | Perforation | 249.50 | 250.50 | 17 |
| 2011-01-15 | Perforation | 430.00 | 430.30 | 99 |
| 2011-01-19 | Remedial Casing Cementing | 249.50 | 430.30 | 0 |
| 2004-11-15 | Perforation | 1250.00 | 1254.00 | 20 |
| 2004-11-15 | Perforation | 1241.00 | 1245.00 | 20 |
| 2004-11-18 | Acid Treatment | 1250.00 | 1254.00 | 0 |
| 2004-11-18 | Acid Treatment | 1241.00 | 1245.00 | 0 |
| 2004-11-22 | Cement Squeeze | 1250.00 | 1254.00 | 0 |
| 2004-11-22 | Cement Squeeze | 1241.00 | 1245.00 | 0 |
| 2004-11-29 | Perforation | 1302.00 | 1304.00 | 20 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2004 | 102 | 0.0 | 0.0 | 0.0 |
| 2006 | 705 | 0.0 | 0.0 | 0.0 |
For data sources see[6]