If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0544260105020 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 02/05-01-054-26W4/0 | |
Location Alias: 02/05-01-54-26 W4M | |
Location Alias 2: 02/05-01-054-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 054 | |
Meridian: 4 | |
Range: 26 | |
Section: 01 | |
County/Municipality: St. Albert | |
Well Name: DAYLIGHT 102 STAL-BLK 5-1-54-26 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0314517 | |
License Date: 2004-09-09 | |
License Status: Abandoned | |
Spud Date: 2004-09-15 | |
Final Drill Date: 2004-10-11 | |
Well Total Depth: 1475.50 m | |
Surface Hole Latitude: 53.633767 | |
Surface Hole Longitude: -113.704840 |
Date | Event |
---|---|
2004-09-09 | Obtained License |
2004-09-16 | Surface Casing Operation Performed |
2004-09-18 | Direction Drilling Operation Performed - Deviate |
2004-09-21 | Well Log Performed |
2004-09-22 | Intermediate Casing Operation Performed |
2004-09-27 | Well Mode changed to Drilled and Cased |
2004-09-28 | Well Log Performed |
2004-09-30 | Liner Casing Operation Performed |
2004-10-11 | Finished Drilling |
2004-10-11 | Perforation Treatment Performed - Open-Hole Completion |
2004-10-21 | Rig Released |
2004-11-03 | Well Began Production |
2004-11-03 | Well Fluid changed to Crude Oil |
2004-11-03 | Well Mode changed to Pumping |
2004-11-15 | Perforation Treatment Performed - Jet Perforation |
2004-11-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2004-11-22 | Perforation Treatment Performed - Cement Squeeze |
2004-11-22 | Plug Back Performed |
2004-11-29 | Perforation Treatment Performed - Jet Perforation |
2004-12-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2004-12-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2009-05-01 | Well Fluid changed to Crude Oil |
2009-05-01 | Well Mode changed to Suspended |
2009-08-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-08-25 | Plug Back Performed |
2009-08-25 | Well Fluid changed to Crude Oil |
2009-08-25 | Well Log Performed |
2009-08-25 | Well Mode changed to Abandoned Zone |
2009-08-26 | Perforation Treatment Performed - Cement Plug |
2009-11-17 | Perforation Treatment Performed - Jet Perforation |
2009-11-17 | Well Log Performed |
2009-11-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-11-18 | Well Log Performed |
2010-09-25 | Perforation Treatment Performed - Jet Perforation |
2010-09-25 | Well Log Performed |
2010-09-26 | Perforation Treatment Performed - Remedial Casing |
2010-10-05 | Well Log Performed |
2011-01-12 | Perforation Treatment Performed - Jet Perforation |
2011-01-15 | Perforation Treatment Performed - Jet Perforation |
2011-01-19 | Perforation Treatment Performed - Remedial Casing |
2011-06-09 | Well Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2004-09-18 | 347.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-10-11 | Open Hole/Barefoot Completion | 1443.50 | 1475.50 | 0 |
2004-11-29 | Perforation | 1295.00 | 1296.50 | 20 |
2004-11-29 | Perforation | 1291.00 | 1293.50 | 20 |
2004-12-03 | Acid Treatment | 1295.00 | 1296.50 | 0 |
2004-12-03 | Acid Treatment | 1291.00 | 1293.50 | 0 |
2004-12-07 | Acid Treatment | 1265.00 | 1275.00 | 0 |
2009-08-25 | Packing Device Capped w/Cement | 1427.00 | 1435.00 | 0 |
2009-08-25 | Packing Device Capped w/Cement | 1227.80 | 1235.80 | 0 |
2009-08-26 | Cement Plug | 1131.80 | 1188.00 | 0 |
2009-11-17 | Perforation | 249.50 | 250.50 | 17 |
2009-11-18 | Packing Device Capped w/Cement | 237.00 | 245.00 | 0 |
2004-11-15 | Perforation | 1265.00 | 1275.00 | 20 |
2010-09-25 | Perforation | 87.00 | 88.00 | 20 |
2010-09-26 | Remedial Casing Cementing | 87.00 | 88.00 | 0 |
2011-01-12 | Perforation | 249.50 | 250.50 | 17 |
2011-01-15 | Perforation | 430.00 | 430.30 | 99 |
2011-01-19 | Remedial Casing Cementing | 249.50 | 430.30 | 0 |
2004-11-15 | Perforation | 1250.00 | 1254.00 | 20 |
2004-11-15 | Perforation | 1241.00 | 1245.00 | 20 |
2004-11-18 | Acid Treatment | 1250.00 | 1254.00 | 0 |
2004-11-18 | Acid Treatment | 1241.00 | 1245.00 | 0 |
2004-11-22 | Cement Squeeze | 1250.00 | 1254.00 | 0 |
2004-11-22 | Cement Squeeze | 1241.00 | 1245.00 | 0 |
2004-11-29 | Perforation | 1302.00 | 1304.00 | 20 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 102 | 0.0 | 0.0 | 0.0 |
2006 | 705 | 0.0 | 0.0 | 0.0 |
For data sources see[6]