X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545093302002

Well Details

Well ID: 0545093302002
Loading map...
Location: 00/02-33-054-09W5/2
Location Alias: 00/02-33-54-09 W5M
Location Alias 2: 00/02-33-054-09 W5/02
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 09
Section: 33
County/Municipality: Yellowhead County
Well Name: VH1 WILDWD 2-33-54-9
Operator Name: Harvest Operations Corp.
License Number: 0128878
License Date: 1987-10-01
License Status: Abandoned
Spud Date: 2004-03-03
Final Drill Date: 2004-03-04
Well Total Depth: 1885.00 m
Surface Hole Latitude: 53.701639
Surface Hole Longitude: -115.262101

For data sources see[1][2]

Well History

Date Event
1987-10-01 Obtained License
2004-03-04 Finished Drilling
2004-03-04 Rig Released
2004-03-04 Well Mode changed to Drilled and Cased
2004-03-05 Perforation Treatment Performed - Jet Perforation
2004-03-05 Well Log Performed
2004-04-23 Perforation Treatment Performed - Fractured
2004-06-04 Well Began Production
2004-06-04 Well Fluid changed to Gas
2004-06-04 Well Mode changed to Flowing
2004-10-01 Well Fluid changed to Gas
2004-10-01 Well Mode changed to Suspended
2009-11-17 Well Log Performed
2009-12-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-12-11 Plug Back Performed
2009-12-11 Well Fluid changed to Gas
2009-12-11 Well Log Performed
2009-12-11 Well Mode changed to Abandoned Zone
2009-12-12 Perforation Treatment Performed - Jet Perforation
2009-12-12 Well Log Performed
2009-12-14 Perforation Treatment Performed - Remedial Casing
2009-12-15 Perforation Treatment Performed - Jet Perforation
2009-12-15 Well Log Performed
2009-12-16 Perforation Treatment Performed - Remedial Casing
2009-12-17 Perforation Treatment Performed - Jet Perforation
2009-12-17 Perforation Treatment Performed - Remedial Casing
2009-12-17 Well Log Performed
2009-12-21 Perforation Treatment Performed - Jet Perforation
2009-12-21 Well Log Performed
2009-12-22 Perforation Treatment Performed - Remedial Casing
2010-02-08 Well Abandoned
2010-02-08 Well Fluid changed to Gas
2010-02-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-03-05 Perforation 1771.50 1773.50 17
2009-12-17 Remedial Casing Cementing 720.00 720.30 0
2009-12-21 Perforation 400.00 400.30 99
2009-12-22 Remedial Casing Cementing 400.00 400.30 0
2004-03-05 Perforation 1766.00 1767.50 17
2004-04-23 Fracture 1766.00 1773.50 0
2009-12-11 Packing Device Capped w/Cement 1752.00 1760.00 0
2009-12-12 Perforation 1275.00 1275.30 99
2009-12-14 Remedial Casing Cementing 1275.00 1275.30 0
2009-12-15 Perforation 965.00 965.30 99
2009-12-16 Remedial Casing Cementing 965.00 965.30 0
2009-12-17 Perforation 720.00 720.30 99

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 252 0.0 0.0 0.0

For data sources see[5]

References