X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545131002000

Well Details

Well ID: 0545131002000
Loading map...
Location: 00/02-10-054-13W5/0
Location Alias: 00/02-10-54-13 W5M
Location Alias 2: 00/02-10-054-13 W5/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 13
Section: 10
County/Municipality: Yellowhead County
Well Name: VELVET HZ NITON 2-10-54-13
Operator Name: Velvet Energy Ltd.
License Number: 0483418
License Date: 2017-04-18
License Status: Issued
Spud Date: 2017-05-29
Final Drill Date: 2017-06-05
Well Total Depth: 3738.00 m
Surface Hole Latitude: 53.655601
Surface Hole Longitude: -115.817203

For data sources see[1][2]

Well History

Date Event
2017-04-18 Obtained License
2017-05-29 Direction Drilling Operation Performed - Deviate
2017-05-30 Surface Casing Operation Performed
2017-06-02 Direction Drilling Operation Performed - Horizontal
2017-06-05 Finished Drilling
2017-06-05 Well Log Performed
2017-06-05 Well Mode changed to Drilled and Cased
2017-06-06 Production Casing Operation Performed
2017-06-06 Rig Released
2017-06-09 Well Log Performed
2017-06-16 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-16 Perforation Treatment Performed - Open-Hole Completion
2017-06-20 Well Log Performed
2017-07-02 Well Began Production
2017-07-02 Well Fluid changed to Gas
2017-07-02 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-05-29 Chinook Drilling Inc. 11 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-05-29 138.40 Deviate (5 - 79 degrees)
2017-06-02 2282.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-06-16 Open Hole/Barefoot Completion 3732.00 3738.00 0
2017-06-16 Multi-Stage Fracture 2971.70 2971.80 0
2017-06-16 Multi-Stage Fracture 2862.70 2862.80 0
2017-06-16 Multi-Stage Fracture 2754.40 2754.50 0
2017-06-16 Multi-Stage Fracture 2646.80 2646.90 0
2017-06-16 Multi-Stage Fracture 2538.00 2538.10 0
2017-06-16 Multi-Stage Fracture 2429.90 2430.00 0
2017-06-16 Multi-Stage Fracture 3727.00 3727.10 0
2017-06-16 Multi-Stage Fracture 3628.10 3628.20 0
2017-06-16 Multi-Stage Fracture 3533.50 3533.60 0
2017-06-16 Multi-Stage Fracture 3438.20 3438.30 0
2017-06-16 Multi-Stage Fracture 3344.40 3344.50 0
2017-06-16 Multi-Stage Fracture 3250.40 3250.50 0
2017-06-16 Multi-Stage Fracture 3158.10 3158.20 0
2017-06-16 Multi-Stage Fracture 3064.80 3064.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-06-16 2017-06-16 1,979 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* Not Available 100 43.5239 N/A
CFXT + N2 N002 Schlumberger Quartz. Crystalline silica 14808-60-7 100 15.6231 N/A
CFXT + N2 N002 Schlumberger Energizing Fluid 2-hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.1086 N/A
Benzenesulfonic acid. 4-ethenyl-. sodium salt. homopolymer 25704-18-1 100 0.0126 N/A
Diatomaceous earth 61790-53-2 100 0.0008 N/A
Erucic amidopropyl dimethyl betaine 149879-98-1 100 0.3325 N/A
Magnesium silicate hydrate (talc) 14807-96-6 100 0.0001 N/A
Nitrogen. liquid form 7727-37-9 100 24.4826 N/A
poly(tetrafluoroethylene) 9002-84-0 100 0 N/A
Polyvinyl acetate. partially hydrolyzed 304443-60-5 100 0.0006 N/A
Propan-2-ol 67-63-0 100 0.2428 N/A
Sodium Chloride 7647-14-5 100 0.0388 N/A
Sodium chloroacetate 3926-62-3 100 0.0002 N/A
Sodium Glycolate (impurity) 2836-32-0 100 0.0033 N/A
Vinylidene chloride/methylacrylate copolymer 25038-72-6 100 0.0061 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-06-14 2017-06-16 Surface Water - Runoff 1105

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 4272 0.0 0.0 0.0
2018 8710 0.0 0.0 0.0
2019 8538 0.0 0.0 0.0
2020 2172 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-06-06 No Incident Encountered 0.00 0.00
2017-06-16 No Incident Encountered 0.00 0.00

For data sources see[10]

References