If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0545170614000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.64018,"lon":-116.500645,"icon":""}]} |
Location: 00/14-06-054-17W5/0 | |
Location Alias: 00/14-06-54-17 W5M | |
Location Alias 2: 00/14-06-054-17 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 054 | |
Meridian: 5 | |
Range: 17 | |
Section: 06 | |
County/Municipality: Yellowhead County | |
Well Name: ARROW POINT EDSON 14-6-54-17 | |
Operator Name: Arrow Point Oil & Gas Ltd. | |
License Number: 0095905 | |
License Date: 1982-05-14 | |
License Status: Abandoned | |
Spud Date: 1982-05-30 | |
Final Drill Date: 1982-06-15 | |
Well Total Depth: 2150.00 m | |
Surface Hole Latitude: 53.640180 | |
Surface Hole Longitude: -116.500645 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-05-14 | Obtained License |
1982-06-13 | Drill Stem Test Performed |
1982-06-15 | Finished Drilling |
1982-06-15 | Well Mode changed to Drilled and Cased |
1982-06-16 | Drill Stem Test Performed |
1982-06-20 | Production Casing Operation Performed |
1982-07-29 | Perforation Treatment Performed - Jet Perforation |
1982-07-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-08-08 | Perforation Treatment Performed - Fractured |
1982-08-13 | Well Began Production |
1982-08-13 | Well Fluid changed to Crude Oil |
1982-08-13 | Well Mode changed to Flowing |
1986-02-26 | Well Log Performed |
1986-02-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-02-27 | Perforation Treatment Performed - Jet Perforation |
1986-02-28 | Perforation Treatment Performed - Fractured |
1989-07-01 | Well Fluid changed to Crude Oil |
1989-07-01 | Well Mode changed to Suspended |
2001-02-19 | Perforation Treatment Performed - Bridge Plug No Cement Required |
2001-02-19 | Perforation Treatment Performed - Jet Perforation |
2001-02-19 | Perforation Treatment Performed - Remedial Casing |
2001-02-19 | Well Log Performed |
2001-02-21 | Well Abandoned |
2001-02-21 | Well Fluid changed to Crude Oil |
2001-02-21 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-07-29 | Perforation | 1920.20 | 1921.30 | 13 |
1982-07-30 | Acid Treatment | 1920.20 | 1921.30 | 0 |
1982-08-08 | Fracture | 1920.20 | 1921.30 | 0 |
1986-02-27 | Perforation | 1891.50 | 1896.00 | 13 |
1986-02-27 | Acid Treatment | 1891.50 | 1896.00 | 0 |
1986-02-28 | Fracture | 1891.50 | 1896.00 | 0 |
2001-02-19 | Bridge Plug, No Cement | 1882.00 | 1882.00 | 0 |
2001-02-19 | Perforation | 534.00 | 535.00 | 23 |
2001-02-19 | Remedial Casing Cementing | 534.00 | 535.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 1767 | 0.0 | 0.0 | 0.0 |
1983 | 3929 | 0.0 | 0.0 | 0.0 |
1984 | 5482 | 0.0 | 0.0 | 0.0 |
1985 | 6434 | 0.0 | 0.0 | 0.0 |
1986 | 7275 | 0.0 | 0.0 | 0.0 |
1987 | 3323 | 0.0 | 0.0 | 0.0 |
1988 | 1176 | 0.0 | 0.0 | 0.0 |
For data sources see[5]