X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545183002000

Well Details

Well ID: 0545183002000
Loading map...
Location: 00/02-30-054-18W5/0
Location Alias: 00/02-30-54-18 W5M
Location Alias 2: 00/02-30-054-18 W5/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 18
Section: 30
County/Municipality: Yellowhead County
Well Name: SOC PINE CK 2-30-54-18
Operator Name: AlphaBow Energy Ltd.
License Number: 0163716
License Date: 1994-01-05
License Status: Issued
Spud Date: 1994-01-18
Final Drill Date: 1994-02-07
Well Total Depth: 2798.00 m
Surface Hole Latitude: 53.689942
Surface Hole Longitude: -116.641820

For data sources see[1][2]

Well History

Date Event
1994-01-05 Obtained License
1994-01-23 Surface Casing Operation Performed
1994-02-07 Finished Drilling
1994-02-09 Well Log Performed
1994-02-12 Production Casing Operation Performed
1994-02-12 Rig Released
1994-02-26 Well Log Performed
1994-02-27 Perforation Treatment Performed - Jet Perforation
1994-02-27 Well Log Performed
1994-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-03-04 Plug Back Performed
1994-03-05 Perforation Treatment Performed - Jet Perforation
1994-03-08 Perforation Treatment Performed - Fractured
1994-05-11 Well Log Performed
1994-05-12 Well Log Performed
1994-05-30 Well Log Performed
1994-05-31 Perforation Treatment Performed - Jet Perforation
1994-05-31 Well Log Performed
1994-06-01 Perforation Treatment Performed - Fractured
1994-07-07 Well Mode changed to Drilled and Cased
2000-03-04 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-02-27 Perforation 2728.50 2729.50 13
1994-05-31 Perforation 1942.00 1943.00 13
1994-06-01 Fracture 1938.20 1941.30 0
2000-03-04 Fracture 1938.20 1943.00 0
1994-02-27 Perforation 2730.80 2733.80 13
1994-03-01 Acid Treatment 2728.50 2733.80 0
1994-03-04 Packing Device Capped w/Cement 2700.00 2703.00 0
1994-03-05 Perforation 2608.70 2609.70 13
1994-03-05 Perforation 2611.00 2612.50 13
1994-03-05 Perforation 2615.00 2617.00 13
1994-03-08 Fracture 2608.70 2617.00 0
1994-05-31 Perforation 1938.20 1941.20 13

For data sources see[4]



References