X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545190407002

Well Details

Well ID: 0545190407002
Loading map...
Location: 00/07-04-054-19W5/2
Location Alias: 00/07-04-54-19 W5M
Location Alias 2: 00/07-04-054-19 W5/02
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 19
Section: 04
County/Municipality: Yellowhead County
Well Name: TALISMAN EDSON 7-4-54-19
Operator Name: TransCanada Energy Ltd.
License Number: 0060209
License Date: 1976-09-16
License Status: Abandoned
Spud Date: 1976-09-21
Final Drill Date: 1976-10-13
Well Total Depth: 2484.10 m
Surface Hole Latitude: 53.633500
Surface Hole Longitude: -116.735552

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-09-16 Obtained License
1976-10-13 Finished Drilling
1976-10-19 Drill Stem Test Performed
1976-10-20 Drill Stem Test Performed
1976-10-24 Production Casing Operation Performed
1976-12-04 Perforation Treatment Performed - Jet Perforation
1976-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-12-06 Perforation Treatment Performed - Fractured
1977-02-13 Perforation Treatment Performed - Jet Perforation
1977-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-02-17 Perforation Treatment Performed - Fractured
1977-03-17 Well Mode changed to Drilled and Cased
2008-12-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-12-09 Perforation Treatment Performed - Cement Plug
2008-12-09 Plug Back Performed
2008-12-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-12-11 Plug Back Performed
2008-12-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-12-12 Plug Back Performed
2008-12-13 Perforation Treatment Performed - Jet Perforation
2008-12-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-12-14 Plug Back Performed
2009-01-06 Perforation Treatment Performed - Jet Perforation
2009-01-07 Perforation Treatment Performed - Jet Perforation
2009-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-09 Plug Back Performed
2009-01-10 Perforation Treatment Performed - Cement Squeeze
2009-01-10 Plug Back Performed
2009-01-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-11 Perforation Treatment Performed - Jet Perforation
2009-01-11 Plug Back Performed
2009-01-14 Well Log Performed
2009-01-18 Perforation Treatment Performed - Cement Squeeze
2009-01-18 Plug Back Performed
2009-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-21 Plug Back Performed
2009-02-01 Perforation Treatment Performed - Jet Perforation
2009-02-02 Perforation Treatment Performed - Cement Plug
2009-02-02 Perforation Treatment Performed - Cement Squeeze
2009-02-02 Plug Back Performed
2009-02-03 Perforation Treatment Performed - Cement Plug
2009-02-03 Plug Back Performed
2009-06-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-12-04 Perforation 2451.80 2452.40 10
2008-12-12 Packing Device Capped w/Cement 1900.00 1908.00 0
2008-12-13 Perforation 1865.00 1866.00 13
2008-12-14 Packing Device Capped w/Cement 1850.00 1858.00 0
2009-01-06 Perforation 1695.00 1696.00 13
2009-01-07 Perforation 1405.00 1406.00 13
2009-01-09 Packing Device Capped w/Cement 1684.00 1692.00 0
2009-01-10 Cement Squeeze 1405.00 1406.00 0
2009-01-11 Packing Device Capped w/Cement 1310.00 1395.00 0
2009-01-11 Perforation 680.00 681.00 13
2009-01-18 Cement Squeeze 680.00 681.00 0
1976-12-05 Acid Treatment 2451.80 2452.40 0
2009-01-21 Packing Device Capped w/Cement 658.50 666.50 0
2009-02-01 Perforation 524.50 525.50 13
2009-02-02 Cement Squeeze 524.50 525.50 0
2009-02-02 Cement Plug 312.00 432.00 0
2009-02-03 Cement Plug 87.90 312.00 0
1976-12-06 Fracture 2451.80 2452.40 0
1977-02-13 Perforation 2037.00 2039.40 7
1977-02-14 Acid Treatment 2037.00 2039.40 0
1977-02-17 Fracture 2037.00 2039.40 0
2008-12-09 Packing Device Capped w/Cement 2441.00 2448.00 0
2008-12-09 Cement Plug 2246.00 2441.00 0
2008-12-11 Packing Device Capped w/Cement 2023.00 2031.00 0

For data sources see[4]



References