If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0545192006002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.676157,"lon":-116.78979,"icon":""}]} |
Location: 00/06-20-054-19W5/2 | |
Location Alias: 00/06-20-54-19 W5M | |
Location Alias 2: 00/06-20-054-19 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 054 | |
Meridian: 5 | |
Range: 19 | |
Section: 20 | |
County/Municipality: Yellowhead County | |
Well Name: TRANSCAN PPL EDSON 6-20-54-19 | |
Operator Name: TransCanada Energy Ltd. | |
License Number: 0415478 | |
License Date: 2009-12-11 | |
License Status: Amended | |
Spud Date: 2010-06-03 | |
Final Drill Date: 2010-07-21 | |
Well Total Depth: 3566.00 m | |
Surface Hole Latitude: 53.676157 | |
Surface Hole Longitude: -116.789790 |
Date | Event |
---|---|
2009-12-11 | Obtained License |
2010-06-14 | Direction Drilling Operation Performed - Horizontal |
2010-07-02 | Direction Drilling Operation Performed - Sidetrack Fish |
2010-07-08 | Well Log Performed |
2010-07-10 | Intermediate Casing Operation Performed |
2010-07-21 | Finished Drilling |
2010-07-21 | Well Mode changed to Drilled and Cased |
2010-07-23 | Perforation Treatment Performed - Open-Hole Completion |
2010-07-24 | Rig Released |
2011-01-05 | Well Began Production |
2011-01-05 | Well Fluid changed to Gas |
2011-01-05 | Well Type changed to Storage |
2016-10-24 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-06-14 | 1966.00 | Horizontal |
2010-07-02 | 2077.00 | Sidetrack fish |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-07-23 | Open Hole/Barefoot Completion | 2932.70 | 3566.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 606 | 0.0 | 0.0 | 0.0 |
2012 | 865 | 0.0 | 0.0 | 0.0 |
2013 | 1561 | 0.0 | 0.0 | 0.0 |
2014 | 2220 | 0.0 | 0.0 | 0.0 |
2015 | 450 | 0.0 | 0.0 | 0.0 |
2016 | 396 | 0.0 | 0.0 | 0.0 |
2017 | 995 | 0.0 | 0.0 | 0.0 |
2018 | 476 | 0.0 | 0.0 | 0.0 |
2019 | 1457 | 0.0 | 0.0 | 0.0 |
2020 | 1038 | 0.0 | 0.0 | 0.0 |
For data sources see[6]