If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0545202616000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.699386,"lon":-116.830195,"icon":""}]} |
| Location: 00/16-26-054-20W5/0 | |
| Location Alias: 00/16-26-54-20 W5M | |
| Location Alias 2: 00/16-26-054-20 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 054 | |
| Meridian: 5 | |
| Range: 20 | |
| Section: 26 | |
| County/Municipality: Yellowhead County | |
| Well Name: TALISMAN SUNDANCE 16-26-54-20 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0393203 | |
| License Date: 2008-01-29 | |
| License Status: Suspension | |
| Spud Date: 2008-02-29 | |
| Final Drill Date: 2008-03-16 | |
| Well Total Depth: 2907.00 m | |
| Surface Hole Latitude: 53.699386 | |
| Surface Hole Longitude: -116.830195 |
| Date | Event |
|---|---|
| 2008-01-29 | Obtained License |
| 2008-03-02 | Surface Casing Operation Performed |
| 2008-03-06 | Direction Drilling Operation Performed - Deviate |
| 2008-03-16 | Finished Drilling |
| 2008-03-16 | Well Log Performed |
| 2008-03-16 | Well Mode changed to Drilled and Cased |
| 2008-03-17 | Production Casing Operation Performed |
| 2008-03-18 | Rig Released |
| 2008-06-23 | Perforation Treatment Performed - Jet Perforation |
| 2008-06-24 | Perforation Treatment Performed - Fractured |
| 2008-07-16 | Perforation Treatment Performed - Jet Perforation |
| 2008-07-18 | Perforation Treatment Performed - Fractured |
| 2008-08-11 | Well Began Production |
| 2008-08-11 | Well Fluid changed to Gas |
| 2008-08-11 | Well Mode changed to Flowing |
| 2012-01-01 | Well Fluid changed to Gas |
| 2012-01-01 | Well Mode changed to Pumping |
| 2019-10-28 | Well Fluid changed to Gas |
| 2019-10-28 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2008-03-06 | 1519.40 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2008-06-23 | Perforation | 2838.00 | 2843.00 | 20 |
| 2008-06-24 | Fracture | 2838.00 | 2843.00 | 0 |
| 2008-07-16 | Perforation | 2583.00 | 2585.00 | 20 |
| 2008-07-18 | Fracture | 2583.00 | 2585.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2008 | 3456 | 0.0 | 0.0 | 0.0 |
| 2009 | 8261 | 0.0 | 0.0 | 0.0 |
| 2010 | 8615 | 0.0 | 0.0 | 0.0 |
| 2011 | 8591 | 0.0 | 0.0 | 0.0 |
| 2012 | 8615 | 0.0 | 0.0 | 0.0 |
| 2013 | 8519 | 0.0 | 0.0 | 0.0 |
| 2014 | 7847 | 0.0 | 0.0 | 0.0 |
| 2015 | 8687 | 0.0 | 0.0 | 0.0 |
| 2016 | 7682 | 0.0 | 0.0 | 0.0 |
| 2017 | 7381 | 0.0 | 0.0 | 0.0 |
| 2018 | 6162 | 0.0 | 0.0 | 0.0 |
| 2019 | 4016 | 0.0 | 0.0 | 0.0 |
For data sources see[6]