If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0545210607000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.633436,"lon":-117.083921,"icon":""}]} |
| Location: 00/07-06-054-21W5/0 | |
| Location Alias: 00/07-06-54-21 W5M | |
| Location Alias 2: 00/07-06-054-21 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 054 | |
| Meridian: 5 | |
| Range: 21 | |
| Section: 06 | |
| County/Municipality: Yellowhead County | |
| Well Name: TOURMALINE SUNDANCE 7-6-54-21 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0433384 | |
| License Date: 2011-05-10 | |
| License Status: Issued | |
| Spud Date: 2011-08-23 | |
| Final Drill Date: 2011-08-30 | |
| Well Total Depth: 3213.00 m | |
| Surface Hole Latitude: 53.633436 | |
| Surface Hole Longitude: -117.083921 |
| Date | Event |
|---|---|
| 2011-05-10 | Obtained License |
| 2011-08-22 | Direction Drilling Operation Performed - Deviate |
| 2011-08-23 | Surface Casing Operation Performed |
| 2011-08-30 | Finished Drilling |
| 2011-08-30 | Well Mode changed to Drilled and Cased |
| 2011-09-01 | Well Log Performed |
| 2011-09-02 | Production Casing Operation Performed |
| 2011-09-02 | Well Log Performed |
| 2011-09-03 | Rig Released |
| 2011-11-18 | Well Log Performed |
| 2011-11-23 | Perforation Treatment Performed - Jet Perforation |
| 2011-11-26 | Perforation Treatment Performed - Fractured |
| 2011-11-26 | Well Log Performed |
| 2011-11-27 | Perforation Treatment Performed - Jet Perforation |
| 2011-11-29 | Perforation Treatment Performed - Fractured |
| 2011-11-29 | Well Log Performed |
| 2011-11-30 | Perforation Treatment Performed - Fractured |
| 2011-11-30 | Perforation Treatment Performed - Jet Perforation |
| 2011-12-14 | Well Began Production |
| 2011-12-14 | Well Fluid changed to Gas |
| 2011-12-14 | Well Mode changed to Flowing |
| 2014-02-28 | Well Fluid changed to Gas |
| 2014-02-28 | Well Mode changed to Pumping |
| 2014-09-30 | Well Log Performed |
| 2015-12-21 | Well Log Performed |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-08-22 | 150.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-11-23 | Perforation | 3195.50 | 3196.10 | 10 |
| 2011-11-27 | Perforation | 3005.00 | 3005.60 | 10 |
| 2011-11-27 | Perforation | 2996.00 | 2996.90 | 10 |
| 2011-11-27 | Perforation | 2983.00 | 2983.90 | 10 |
| 2011-11-27 | Perforation | 2946.00 | 2946.60 | 10 |
| 2011-11-27 | Perforation | 2942.00 | 2942.60 | 10 |
| 2011-11-27 | Perforation | 2922.00 | 2922.60 | 10 |
| 2011-11-27 | Perforation | 2887.00 | 2887.60 | 10 |
| 2011-11-27 | Perforation | 2880.00 | 2880.90 | 10 |
| 2011-11-27 | Perforation | 2876.00 | 2876.30 | 10 |
| 2011-11-27 | Perforation | 2870.00 | 2870.30 | 10 |
| 2011-11-23 | Perforation | 3193.00 | 3193.90 | 10 |
| 2011-11-27 | Perforation | 2847.00 | 2847.30 | 10 |
| 2011-11-27 | Perforation | 2835.50 | 2836.10 | 10 |
| 2011-11-29 | Fracture | 2835.50 | 3005.60 | 0 |
| 2011-11-30 | Perforation | 2817.50 | 2819.30 | 10 |
| 2011-11-30 | Perforation | 2722.50 | 2723.10 | 10 |
| 2011-11-30 | Perforation | 2697.00 | 2698.20 | 10 |
| 2011-11-30 | Fracture | 2697.00 | 2819.30 | 0 |
| 2011-11-23 | Perforation | 3189.00 | 3189.60 | 10 |
| 2011-11-23 | Perforation | 3181.00 | 3181.90 | 10 |
| 2011-11-23 | Perforation | 3171.00 | 3171.60 | 10 |
| 2011-11-23 | Perforation | 3165.00 | 3165.30 | 10 |
| 2011-11-23 | Perforation | 3132.00 | 3132.60 | 10 |
| 2011-11-23 | Perforation | 3112.50 | 3112.80 | 10 |
| 2011-11-26 | Fracture | 3112.50 | 3196.10 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 501 | 0.0 | 0.0 | 0.0 |
| 2012 | 8737 | 0.0 | 0.0 | 0.0 |
| 2013 | 8473 | 0.0 | 0.0 | 0.0 |
| 2014 | 8331 | 0.0 | 0.0 | 0.0 |
| 2015 | 8615 | 0.0 | 0.0 | 0.0 |
| 2016 | 8265 | 0.0 | 0.0 | 0.0 |
| 2017 | 8735 | 0.0 | 0.0 | 0.0 |
| 2018 | 8723 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]