X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545212112000

Well Details

Well ID: 0545212112000
Loading map...
Location: 00/12-21-054-21W5/0
Location Alias: 00/12-21-54-21 W5M
Location Alias 2: 00/12-21-054-21 W5/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 21
Section: 21
County/Municipality: Yellowhead County
Well Name: TALISMAN ETALHZ SUNDANCE 12-21-54-21
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0432579
License Date: 2011-03-25
License Status: Amended
Spud Date: 2012-01-08
Final Drill Date: 2012-02-01
Well Total Depth: 3523.00 m
Surface Hole Latitude: 53.673627
Surface Hole Longitude: -117.027521

For data sources see[1][2]

Well History

Date Event
2011-03-25 Obtained License
2012-01-11 Surface Casing Operation Performed
2012-01-15 Direction Drilling Operation Performed - Horizontal
2012-01-22 Intermediate Casing Operation Performed
2012-02-01 Finished Drilling
2012-02-01 Well Mode changed to Drilled and Cased
2012-02-04 Production Casing Operation Performed
2012-02-05 Rig Released
2012-10-01 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-02 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-02 Well Began Production
2012-11-02 Well Fluid changed to Gas
2012-11-02 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-08 Nabors Drilling Limited 60 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-15 1926.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-10-01 Multi-Stage Fracture 3487.40 3487.50 0
2012-10-01 Multi-Stage Fracture 3363.80 3363.90 0
2012-10-01 Multi-Stage Fracture 3254.50 3254.60 0
2012-10-02 Multi-Stage Fracture 3131.60 3131.70 0
2012-10-02 Multi-Stage Fracture 3009.30 3009.40 0
2012-10-02 Multi-Stage Fracture 2874.80 2874.90 0
2012-10-02 Multi-Stage Fracture 2726.80 2726.90 0
2012-10-02 Multi-Stage Fracture 2591.50 2591.60 0
2012-10-02 Multi-Stage Fracture 2456.10 2456.20 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 264 0.0 0.0 0.0
2013 8352 0.0 0.0 0.0
2014 8712 0.0 0.0 0.0
2015 8363 0.0 0.0 0.0
2016 7942 0.0 0.0 0.0
2017 8374 0.0 0.0 0.0
2018 8303 0.0 0.0 0.0
2019 6381 0.0 0.0 0.0
2020 2087 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-31 No Incident Encountered 0.00 0.00

For data sources see[8]

References