If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0545221111000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.652754,"lon":-117.137782,"icon":""}]} |
| Location: 00/11-11-054-22W5/0 | |
| Location Alias: 00/11-11-54-22 W5M | |
| Location Alias 2: 00/11-11-054-22 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 054 | |
| Meridian: 5 | |
| Range: 22 | |
| Section: 11 | |
| County/Municipality: Yellowhead County | |
| Well Name: TOURMALINE SUNDANCE 11-11-54-22 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0433039 | |
| License Date: 2011-04-15 | |
| License Status: Issued | |
| Spud Date: 2011-07-24 | |
| Final Drill Date: 2011-08-03 | |
| Well Total Depth: 3135.00 m | |
| Surface Hole Latitude: 53.652754 | |
| Surface Hole Longitude: -117.137782 |
| Date | Event |
|---|---|
| 2011-04-15 | Obtained License |
| 2011-07-25 | Surface Casing Operation Performed |
| 2011-07-27 | Direction Drilling Operation Performed - Deviate |
| 2011-08-03 | Finished Drilling |
| 2011-08-03 | Well Mode changed to Drilled and Cased |
| 2011-08-04 | Well Log Performed |
| 2011-08-05 | Production Casing Operation Performed |
| 2011-08-06 | Rig Released |
| 2011-10-10 | Well Log Performed |
| 2011-10-19 | Perforation Treatment Performed - Jet Perforation |
| 2011-10-19 | Well Log Performed |
| 2011-10-25 | Perforation Treatment Performed - Fractured |
| 2011-10-26 | Perforation Treatment Performed - Jet Perforation |
| 2011-10-28 | Perforation Treatment Performed - Fractured |
| 2011-10-28 | Well Log Performed |
| 2011-10-29 | Perforation Treatment Performed - Jet Perforation |
| 2011-10-31 | Perforation Treatment Performed - Fractured |
| 2011-11-17 | Well Began Production |
| 2011-11-17 | Well Fluid changed to Gas |
| 2011-11-17 | Well Mode changed to Flowing |
| 2013-01-07 | Well Fluid changed to Gas |
| 2013-01-07 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-07-27 | 676.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-10-19 | Perforation | 3116.00 | 3117.50 | 10 |
| 2011-10-26 | Perforation | 2941.00 | 2941.60 | 10 |
| 2011-10-26 | Perforation | 2929.00 | 2929.30 | 10 |
| 2011-10-26 | Perforation | 2923.00 | 2923.90 | 10 |
| 2011-10-26 | Perforation | 2918.00 | 2919.20 | 10 |
| 2011-10-26 | Perforation | 2909.00 | 2909.30 | 10 |
| 2011-10-26 | Perforation | 2825.50 | 2825.80 | 10 |
| 2011-10-26 | Perforation | 2800.50 | 2800.80 | 10 |
| 2011-10-26 | Perforation | 2796.00 | 2796.60 | 10 |
| 2011-10-26 | Perforation | 2771.00 | 2771.60 | 10 |
| 2011-10-26 | Perforation | 2765.50 | 2765.80 | 10 |
| 2011-10-19 | Perforation | 3112.00 | 3112.60 | 10 |
| 2011-10-26 | Perforation | 2759.00 | 2759.60 | 10 |
| 2011-10-26 | Perforation | 2745.00 | 2745.90 | 10 |
| 2011-10-28 | Fracture | 2745.00 | 2982.30 | 0 |
| 2011-10-29 | Perforation | 2645.00 | 2645.60 | 10 |
| 2011-10-29 | Perforation | 2621.50 | 2623.00 | 10 |
| 2011-10-29 | Perforation | 2586.00 | 2586.60 | 10 |
| 2011-10-29 | Perforation | 2581.00 | 2581.90 | 10 |
| 2011-10-31 | Fracture | 2581.00 | 2645.60 | 0 |
| 2011-10-19 | Perforation | 3109.00 | 3109.90 | 10 |
| 2011-10-19 | Perforation | 3106.00 | 3106.60 | 10 |
| 2011-10-19 | Perforation | 3102.00 | 3102.60 | 10 |
| 2011-10-19 | Perforation | 3085.00 | 3085.30 | 10 |
| 2011-10-19 | Perforation | 3022.00 | 3022.30 | 10 |
| 2011-10-25 | Fracture | 3022.00 | 3117.50 | 0 |
| 2011-10-26 | Perforation | 2982.00 | 2982.30 | 10 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 1247 | 0.0 | 0.0 | 0.0 |
| 2012 | 8501 | 0.0 | 0.0 | 0.0 |
| 2013 | 8352 | 0.0 | 0.0 | 0.0 |
| 2014 | 8662 | 0.0 | 0.0 | 0.0 |
| 2015 | 8687 | 0.0 | 0.0 | 0.0 |
| 2016 | 8705 | 0.0 | 0.0 | 0.0 |
| 2017 | 8663 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]