If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0545221203020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.646333,"lon":-117.107377,"icon":""}]} |
| Location: 02/03-12-054-22W5/0 | |
| Location Alias: 02/03-12-54-22 W5M | |
| Location Alias 2: 02/03-12-054-22 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 054 | |
| Meridian: 5 | |
| Range: 22 | |
| Section: 12 | |
| County/Municipality: Yellowhead County | |
| Well Name: TOURMALINE SUNDANCE 3-12-54-22 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0411899 | |
| License Date: 2009-08-19 | |
| License Status: Amended | |
| Spud Date: 2009-09-01 | |
| Final Drill Date: 2009-09-17 | |
| Well Total Depth: 3219.00 m | |
| Surface Hole Latitude: 53.646333 | |
| Surface Hole Longitude: -117.107377 |
| Date | Event |
|---|---|
| 2009-08-19 | Obtained License |
| 2009-09-01 | Surface Casing Operation Performed |
| 2009-09-05 | Direction Drilling Operation Performed - Deviate |
| 2009-09-15 | Well Log Performed |
| 2009-09-16 | Well Log Performed |
| 2009-09-17 | Finished Drilling |
| 2009-09-17 | Production Casing Operation Performed |
| 2009-09-17 | Well Mode changed to Drilled and Cased |
| 2009-09-18 | Rig Released |
| 2009-10-27 | Perforation Treatment Performed - Jet Perforation |
| 2009-10-28 | Perforation Treatment Performed - Fractured |
| 2009-10-29 | Perforation Treatment Performed - Jet Perforation |
| 2009-10-30 | Perforation Treatment Performed - Fractured |
| 2009-10-30 | Perforation Treatment Performed - Jet Perforation |
| 2009-10-31 | Perforation Treatment Performed - Fractured |
| 2009-10-31 | Perforation Treatment Performed - Jet Perforation |
| 2009-11-01 | Perforation Treatment Performed - Fractured |
| 2010-02-01 | Well Began Production |
| 2010-02-01 | Well Fluid changed to Gas |
| 2010-02-01 | Well Mode changed to Flowing |
| 2012-07-12 | Well Fluid changed to Gas |
| 2012-07-12 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2009-09-05 | 650.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2009-10-27 | Perforation | 3205.50 | 3206.10 | 10 |
| 2009-10-30 | Fracture | 3030.00 | 3082.00 | 0 |
| 2009-10-30 | Perforation | 3014.50 | 3015.10 | 10 |
| 2009-10-30 | Perforation | 3009.00 | 3009.60 | 10 |
| 2009-10-30 | Perforation | 2997.00 | 2997.60 | 10 |
| 2009-10-30 | Perforation | 2987.00 | 2987.60 | 10 |
| 2009-10-30 | Perforation | 2981.50 | 2982.10 | 10 |
| 2009-10-30 | Fracture | 2981.50 | 3015.10 | 0 |
| 2009-10-30 | Perforation | 2893.00 | 2894.20 | 8 |
| 2009-10-30 | Perforation | 2886.00 | 2887.00 | 9 |
| 2009-10-30 | Perforation | 2877.00 | 2878.00 | 12 |
| 2009-10-27 | Perforation | 3201.50 | 3202.10 | 10 |
| 2009-10-31 | Fracture | 2877.00 | 2894.20 | 0 |
| 2009-10-31 | Perforation | 2863.50 | 2864.10 | 10 |
| 2009-10-31 | Perforation | 2855.00 | 2856.10 | 10 |
| 2009-10-31 | Perforation | 2852.00 | 2853.10 | 6 |
| 2009-10-31 | Perforation | 2847.70 | 2848.10 | 10 |
| 2009-10-31 | Perforation | 2831.00 | 2831.60 | 10 |
| 2009-10-31 | Fracture | 2831.00 | 2864.10 | 0 |
| 2009-10-31 | Perforation | 2715.00 | 2716.00 | 9 |
| 2009-10-31 | Perforation | 2708.00 | 2710.30 | 9 |
| 2009-11-01 | Fracture | 2708.00 | 2716.00 | 0 |
| 2009-10-27 | Perforation | 3193.50 | 3194.10 | 10 |
| 2009-10-27 | Perforation | 3187.00 | 3187.60 | 10 |
| 2009-10-27 | Perforation | 3180.00 | 3180.60 | 10 |
| 2009-10-28 | Fracture | 3180.00 | 3206.10 | 0 |
| 2009-10-29 | Perforation | 3081.00 | 3082.00 | 10 |
| 2009-10-29 | Perforation | 3069.00 | 3070.00 | 9 |
| 2009-10-29 | Perforation | 3030.00 | 3031.30 | 10 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 7698 | 0.0 | 0.0 | 0.0 |
| 2011 | 8583 | 0.0 | 0.0 | 0.0 |
| 2012 | 8461 | 0.0 | 0.0 | 0.0 |
| 2013 | 8551 | 0.0 | 0.0 | 0.0 |
| 2014 | 8619 | 0.0 | 0.0 | 0.0 |
| 2015 | 8656 | 0.0 | 0.0 | 0.0 |
| 2016 | 8172 | 0.0 | 0.0 | 0.0 |
| 2017 | 8687 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8687 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]