If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0545231304000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.660792,"lon":-117.274326,"icon":""}]} |
| Location: 00/04-13-054-23W5/0 | |
| Location Alias: 00/04-13-54-23 W5M | |
| Location Alias 2: 00/04-13-054-23 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 054 | |
| Meridian: 5 | |
| Range: 23 | |
| Section: 13 | |
| County/Municipality: Yellowhead County | |
| Well Name: TOURMALINE SUNDANCE 4-13-54-23 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0415274 | |
| License Date: 2009-12-07 | |
| License Status: Issued | |
| Spud Date: 2010-02-18 | |
| Final Drill Date: 2010-03-03 | |
| Well Total Depth: 3277.00 m | |
| Surface Hole Latitude: 53.660792 | |
| Surface Hole Longitude: -117.274326 |
| Date | Event |
|---|---|
| 2009-12-07 | Obtained License |
| 2010-02-19 | Direction Drilling Operation Performed - Deviate |
| 2010-02-21 | Surface Casing Operation Performed |
| 2010-03-03 | Finished Drilling |
| 2010-03-03 | Well Mode changed to Drilled and Cased |
| 2010-03-04 | Well Log Performed |
| 2010-03-05 | Production Casing Operation Performed |
| 2010-03-05 | Well Log Performed |
| 2010-03-07 | Rig Released |
| 2010-08-01 | Well Log Performed |
| 2010-08-02 | Perforation Treatment Performed - Fractured |
| 2010-08-02 | Perforation Treatment Performed - Jet Perforation |
| 2010-08-03 | Perforation Treatment Performed - Jet Perforation |
| 2010-08-04 | Perforation Treatment Performed - Fractured |
| 2010-08-04 | Well Log Performed |
| 2010-08-05 | Perforation Treatment Performed - Fractured |
| 2010-08-05 | Perforation Treatment Performed - Jet Perforation |
| 2010-08-05 | Well Log Performed |
| 2010-08-06 | Perforation Treatment Performed - Fractured |
| 2010-08-06 | Perforation Treatment Performed - Jet Perforation |
| 2010-08-07 | Perforation Treatment Performed - Fractured |
| 2010-08-07 | Perforation Treatment Performed - Jet Perforation |
| 2010-08-18 | Well Began Production |
| 2010-08-18 | Well Fluid changed to Gas |
| 2010-08-18 | Well Mode changed to Flowing |
| 2011-04-12 | Well Fluid changed to Gas |
| 2011-04-12 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-02-19 | 128.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-08-02 | Perforation | 3259.00 | 3259.30 | 10 |
| 2010-08-03 | Perforation | 3087.00 | 3087.30 | 10 |
| 2010-08-03 | Perforation | 3073.00 | 3073.60 | 10 |
| 2010-08-03 | Perforation | 3070.00 | 3070.90 | 10 |
| 2010-08-03 | Perforation | 3063.00 | 3063.60 | 10 |
| 2010-08-04 | Fracture | 3063.00 | 3150.60 | 0 |
| 2010-08-05 | Perforation | 3003.00 | 3003.60 | 10 |
| 2010-08-05 | Perforation | 2996.00 | 2996.60 | 10 |
| 2010-08-05 | Perforation | 2991.00 | 2991.30 | 10 |
| 2010-08-05 | Perforation | 2975.00 | 2975.60 | 10 |
| 2010-08-05 | Perforation | 2968.00 | 2968.60 | 10 |
| 2010-08-02 | Perforation | 3253.00 | 3253.90 | 10 |
| 2010-08-05 | Perforation | 2963.00 | 2963.60 | 10 |
| 2010-08-05 | Perforation | 2959.00 | 2959.30 | 10 |
| 2010-08-05 | Fracture | 2959.00 | 3003.60 | 0 |
| 2010-08-06 | Perforation | 2904.00 | 2904.30 | 10 |
| 2010-08-06 | Perforation | 2899.00 | 2899.60 | 10 |
| 2010-08-06 | Perforation | 2896.00 | 2896.60 | 10 |
| 2010-08-06 | Perforation | 2883.50 | 2883.80 | 10 |
| 2010-08-06 | Fracture | 2883.50 | 2904.30 | 0 |
| 2010-08-07 | Perforation | 2404.50 | 2405.30 | 10 |
| 2010-08-07 | Perforation | 2397.50 | 2398.40 | 10 |
| 2010-08-02 | Perforation | 3248.00 | 3248.30 | 10 |
| 2010-08-07 | Perforation | 2380.00 | 2380.80 | 10 |
| 2010-08-07 | Perforation | 2373.00 | 2373.90 | 10 |
| 2010-08-07 | Fracture | 2373.00 | 2405.30 | 0 |
| 2010-08-02 | Perforation | 3238.00 | 3238.30 | 10 |
| 2010-08-02 | Perforation | 3227.00 | 3227.60 | 10 |
| 2010-08-02 | Perforation | 3223.00 | 3223.90 | 10 |
| 2010-08-02 | Fracture | 3223.00 | 3259.30 | 0 |
| 2010-08-03 | Perforation | 3150.00 | 3150.60 | 10 |
| 2010-08-03 | Perforation | 3132.00 | 3132.30 | 10 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 3104 | 0.0 | 0.0 | 0.0 |
| 2011 | 7896 | 0.0 | 0.0 | 0.0 |
| 2012 | 8221 | 0.0 | 0.0 | 0.0 |
| 2013 | 8256 | 0.0 | 0.0 | 0.0 |
| 2014 | 8497 | 0.0 | 0.0 | 0.0 |
| 2015 | 8653 | 0.0 | 0.0 | 0.0 |
| 2016 | 8164 | 0.0 | 0.0 | 0.0 |
| 2017 | 7576 | 0.0 | 0.0 | 0.0 |
| 2018 | 8639 | 0.0 | 0.0 | 0.0 |
| 2019 | 7943 | 0.0 | 0.0 | 0.0 |
| 2020 | 1848 | 0.0 | 0.0 | 0.0 |
For data sources see[6]