X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545233216000

Well Details

Well ID: 0545233216000
Loading map...
Location: 00/16-32-054-23W5/0
Location Alias: 00/16-32-54-23 W5M
Location Alias 2: 00/16-32-054-23 W5/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 23
Section: 32
County/Municipality: Yellowhead County
Well Name: TOURMALINE 102 SUNDANCE 16-32-54-23
Operator Name: Tourmaline Oil Corp.
License Number: 0480445
License Date: 2016-09-23
License Status: Amended
Spud Date: 2016-11-27
Final Drill Date: 2016-12-16
Well Total Depth: 5319.00 m
Surface Hole Latitude: 53.714590
Surface Hole Longitude: -117.380029

For data sources see[1][2]

Well History

Date Event
2016-09-23 Obtained License
2016-11-29 Surface Casing Operation Performed
2016-12-07 Direction Drilling Operation Performed - Deviate
2016-12-09 Direction Drilling Operation Performed - Horizontal
2016-12-11 Intermediate Casing Operation Performed
2016-12-16 Finished Drilling
2016-12-16 Well Mode changed to Drilled and Cased
2016-12-18 Liner Casing Operation Performed
2016-12-18 Rig Released
2016-12-18 Well Log Performed
2017-01-02 Perforation Treatment Performed - Multi-Stage Fracture
2017-01-04 Perforation Treatment Performed - Multi-Stage Fracture
2017-01-05 Perforation Treatment Performed - Multi-Stage Fracture
2017-01-05 Well Began Production
2017-01-05 Well Fluid changed to Gas
2017-01-05 Well Mode changed to Flowing
2017-01-06 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2016-12-07 2853.70 Deviate (5 - 79 degrees)
2016-12-09 3314.10 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-02 Multi-Stage Fracture 5257.00 5257.10 0
2017-01-04 Multi-Stage Fracture 4709.50 4709.60 0
2017-01-04 Multi-Stage Fracture 4659.20 4659.30 0
2017-01-04 Multi-Stage Fracture 4608.50 4608.60 0
2017-01-04 Multi-Stage Fracture 4556.60 4556.70 0
2017-01-05 Multi-Stage Fracture 4504.60 4504.70 0
2017-01-05 Multi-Stage Fracture 4452.70 4452.80 0
2017-01-05 Multi-Stage Fracture 4402.10 4402.20 0
2017-01-05 Multi-Stage Fracture 4350.80 4350.90 0
2017-01-05 Multi-Stage Fracture 4299.00 4299.10 0
2017-01-05 Multi-Stage Fracture 4246.10 4246.20 0
2017-01-04 Multi-Stage Fracture 5202.60 5202.70 0
2017-01-05 Multi-Stage Fracture 4193.20 4193.30 0
2017-01-05 Multi-Stage Fracture 4140.40 4140.50 0
2017-01-05 Multi-Stage Fracture 4087.50 4087.60 0
2017-01-05 Multi-Stage Fracture 4034.70 4034.80 0
2017-01-05 Multi-Stage Fracture 3981.90 3982.00 0
2017-01-05 Multi-Stage Fracture 3929.00 3929.10 0
2017-01-05 Multi-Stage Fracture 3876.20 3876.30 0
2017-01-05 Multi-Stage Fracture 3823.30 3823.40 0
2017-01-05 Multi-Stage Fracture 3770.50 3770.60 0
2017-01-05 Multi-Stage Fracture 3717.60 3717.70 0
2017-01-04 Multi-Stage Fracture 5137.30 5137.40 0
2017-01-05 Multi-Stage Fracture 3664.70 3664.80 0
2017-01-05 Multi-Stage Fracture 3611.80 3611.90 0
2017-01-06 Multi-Stage Fracture 3559.00 3559.10 0
2017-01-06 Multi-Stage Fracture 3506.20 3506.30 0
2017-01-06 Multi-Stage Fracture 3453.30 3453.40 0
2017-01-06 Multi-Stage Fracture 3400.50 3400.60 0
2017-01-04 Multi-Stage Fracture 5071.80 5071.90 0
2017-01-04 Multi-Stage Fracture 5006.40 5006.50 0
2017-01-04 Multi-Stage Fracture 4940.90 4941.00 0
2017-01-04 Multi-Stage Fracture 4876.60 4876.70 0
2017-01-04 Multi-Stage Fracture 4813.00 4813.10 0
2017-01-04 Multi-Stage Fracture 4761.70 4761.80 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-01-02 2017-01-06 3,148 8,244 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.5155 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.5716 N/A
silica crystalline 14808-60-7 100 3.5716 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 11.2229 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.6699 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0129 N/A
2-mercaptoethanol 60-24-2 100 0.0129 N/A
dibromoacetonitrile 3252-43-5 100 0.0129 N/A
non-hazardous ingredients Not Available 100 0.0129 N/A
sodium bromide 7647-15-6 100 0.0129 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0898 N/A
water Not Available 100 0.0898 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0783 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.0783 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.0783 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0783 N/A
non-hazardous ingredients Not Available 100 0.0783 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0427 N/A
methanol 67-56-1 100 0.0427 N/A
water Not Available 100 0.0427 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 8474 0.0 0.0 0.0
2018 8683 0.0 0.0 0.0
2019 8755 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-12-16 No Incident Encountered 0.00 0.00
2017-01-17 No Incident Encountered 0.00 0.00

For data sources see[8]

References