If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0545242408000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.691176,"lon":-117.407552,"icon":""}]} |
| Location: 00/08-24-054-24W5/0 | |
| Location Alias: 00/08-24-54-24 W5M | |
| Location Alias 2: 00/08-24-054-24 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 054 | |
| Meridian: 5 | |
| Range: 24 | |
| Section: 24 | |
| County/Municipality: Yellowhead County | |
| Well Name: TOURMALINE HZ SUNDANCE 8-24-54-24 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0492900 | |
| License Date: 2018-12-20 | |
| License Status: Issued | |
| Spud Date: 2019-02-13 | |
| Final Drill Date: 2019-02-24 | |
| Well Total Depth: 4772.00 m | |
| Surface Hole Latitude: 53.691176 | |
| Surface Hole Longitude: -117.407552 |
| Date | Event |
|---|---|
| 2018-12-20 | Obtained License |
| 2019-02-13 | Lost Circulation Occurred |
| 2019-02-14 | Surface Casing Operation Performed |
| 2019-02-18 | Direction Drilling Operation Performed - Deviate |
| 2019-02-20 | Direction Drilling Operation Performed - Horizontal |
| 2019-02-20 | Well Log Performed |
| 2019-02-21 | Well Log Performed |
| 2019-02-24 | Finished Drilling |
| 2019-02-24 | Well Log Performed |
| 2019-02-24 | Well Mode changed to Drilled and Cased |
| 2019-02-26 | Production Casing Operation Performed |
| 2019-02-26 | Rig Released |
| 2019-03-03 | Well Log Performed |
| 2019-03-08 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-03-09 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-03-09 | Well Began Production |
| 2019-03-09 | Well Fluid changed to Gas |
| 2019-03-09 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2019-02-13 | Trinidad Drilling Ltd. | 37E | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2019-02-18 | 2796.00 | Deviate (5 - 79 degrees) |
| 2019-02-20 | 3173.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2019-03-08 | Multi-Stage Fracture | 4714.30 | 4714.40 | 0 |
| 2019-03-08 | Multi-Stage Fracture | 4249.50 | 4249.60 | 0 |
| 2019-03-08 | Multi-Stage Fracture | 4196.60 | 4196.70 | 0 |
| 2019-03-08 | Multi-Stage Fracture | 4143.70 | 4143.80 | 0 |
| 2019-03-08 | Multi-Stage Fracture | 4090.90 | 4091.00 | 0 |
| 2019-03-08 | Multi-Stage Fracture | 4038.00 | 4038.10 | 0 |
| 2019-03-08 | Multi-Stage Fracture | 3985.30 | 3985.40 | 0 |
| 2019-03-09 | Multi-Stage Fracture | 3932.40 | 3932.50 | 0 |
| 2019-03-09 | Multi-Stage Fracture | 3879.50 | 3879.60 | 0 |
| 2019-03-09 | Multi-Stage Fracture | 3826.70 | 3826.80 | 0 |
| 2019-03-09 | Multi-Stage Fracture | 3773.80 | 3773.90 | 0 |
| 2019-03-08 | Multi-Stage Fracture | 4672.50 | 4672.60 | 0 |
| 2019-03-09 | Multi-Stage Fracture | 3721.00 | 3721.10 | 0 |
| 2019-03-09 | Multi-Stage Fracture | 3668.10 | 3668.20 | 0 |
| 2019-03-09 | Multi-Stage Fracture | 3615.20 | 3615.30 | 0 |
| 2019-03-09 | Multi-Stage Fracture | 3562.30 | 3562.40 | 0 |
| 2019-03-09 | Multi-Stage Fracture | 3509.50 | 3509.60 | 0 |
| 2019-03-09 | Multi-Stage Fracture | 3456.60 | 3456.70 | 0 |
| 2019-03-09 | Multi-Stage Fracture | 3403.70 | 3403.80 | 0 |
| 2019-03-09 | Multi-Stage Fracture | 3350.90 | 3351.00 | 0 |
| 2019-03-09 | Multi-Stage Fracture | 3298.10 | 3298.20 | 0 |
| 2019-03-09 | Multi-Stage Fracture | 3245.20 | 3245.30 | 0 |
| 2019-03-08 | Multi-Stage Fracture | 4619.60 | 4619.70 | 0 |
| 2019-03-08 | Multi-Stage Fracture | 4566.80 | 4566.90 | 0 |
| 2019-03-08 | Multi-Stage Fracture | 4513.90 | 4514.00 | 0 |
| 2019-03-08 | Multi-Stage Fracture | 4461.00 | 4461.10 | 0 |
| 2019-03-08 | Multi-Stage Fracture | 4408.10 | 4408.20 | 0 |
| 2019-03-08 | Multi-Stage Fracture | 4355.20 | 4355.30 | 0 |
| 2019-03-08 | Multi-Stage Fracture | 4302.40 | 4302.50 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2019-03-08 | 2019-03-09 | 3,072 | 6,442 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 82.9718 | N/A | |||
| Prime Plus 40/70 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 3.7312 | N/A | ||
| silica crystalline | 14808-60-7 | 100 | 3.7312 | N/A | ||||
| Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 11.1936 | N/A | ||
| Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 1.8952 | N/A | ||
| AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.013 | N/A | |
| dibromoacetonitrile | 3252-43-5 | 100 | 0.013 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.013 | N/A | ||||
| polyethylene glycol | 25322-68-3 | 100 | 0.013 | N/A | ||||
| sodium bromide | 7647-15-6 | 100 | 0.013 | N/A | ||||
| CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.0925 | N/A | |
| water | Not Available | 100 | 0.0925 | N/A | ||||
| FR-22 | Trican | Friction Reducer | distillates (petroleum). hydrotreated light naphthenic | 64742-53-6 | 100 | 0.0566 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.0566 | N/A | ||||
| S-17X | Trican | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0458 | N/A | |
| benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0458 | N/A | ||||
| methanol | 67-56-1 | 100 | 0.0458 | N/A | ||||
| methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0458 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0458 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2019-03-04 | 2019-03-06 | Recycled Fracturing Water (treated at well site) | 1479 |
| 2019-03-04 | 2019-03-06 | Recycled Fracturing Water (treated at well site) | 1480 |
| 2019-03-07 | 2019-03-08 | Recycled Fracturing Water (treated at well site) | 1585 |
| 2019-03-07 | 2019-03-08 | Recycled Fracturing Water (treated at well site) | 1585 |
| 2019-03-08 | 2019-03-09 | Recycled Fracturing Water (treated at well site) | 313 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2019 | 7109 | 0.0 | 0.0 | 0.0 |
| 2020 | 2172 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2019-02-13 | Lost Circulation | 93.00 | 330.00 |
| 2019-03-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]