If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0545242501000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.690726,"lon":-117.39859,"icon":""}]} |
| Location: 00/01-25-054-24W5/0 | |
| Location Alias: 00/01-25-54-24 W5M | |
| Location Alias 2: 00/01-25-054-24 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 054 | |
| Meridian: 5 | |
| Range: 24 | |
| Section: 25 | |
| County/Municipality: Yellowhead County | |
| Well Name: TOURMALINE SUNDANCE 1-25-54-24 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0413760 | |
| License Date: 2009-11-06 | |
| License Status: Issued | |
| Spud Date: 2009-12-28 | |
| Final Drill Date: 2010-01-10 | |
| Well Total Depth: 3448.00 m | |
| Surface Hole Latitude: 53.690726 | |
| Surface Hole Longitude: -117.398590 |
| Date | Event |
|---|---|
| 2009-11-06 | Obtained License |
| 2009-12-30 | Direction Drilling Operation Performed - Deviate |
| 2010-01-01 | Surface Casing Operation Performed |
| 2010-01-10 | Finished Drilling |
| 2010-01-10 | Well Log Performed |
| 2010-01-10 | Well Mode changed to Drilled and Cased |
| 2010-01-11 | Well Log Performed |
| 2010-01-12 | Production Casing Operation Performed |
| 2010-01-12 | Rig Released |
| 2010-01-30 | Perforation Treatment Performed - Fractured |
| 2010-01-30 | Perforation Treatment Performed - Jet Perforation |
| 2010-01-31 | Perforation Treatment Performed - Fractured |
| 2010-02-01 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-02 | Perforation Treatment Performed - Fractured |
| 2010-02-03 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-04 | Perforation Treatment Performed - Fractured |
| 2010-02-05 | Perforation Treatment Performed - Fractured |
| 2010-02-05 | Perforation Treatment Performed - Jet Perforation |
| 2010-03-12 | Well Began Production |
| 2010-03-12 | Well Fluid changed to Gas |
| 2010-03-12 | Well Mode changed to Flowing |
| 2012-02-08 | Well Fluid changed to Gas |
| 2012-02-08 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2009-12-30 | 157.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-01-30 | Perforation | 3427.00 | 3427.90 | 10 |
| 2010-01-30 | Perforation | 3233.00 | 3233.60 | 10 |
| 2010-01-30 | Perforation | 3211.00 | 3211.30 | 10 |
| 2010-01-30 | Perforation | 3205.00 | 3205.30 | 10 |
| 2010-01-31 | Fracture | 3205.00 | 3266.60 | 0 |
| 2010-02-01 | Perforation | 3179.00 | 3179.60 | 10 |
| 2010-02-01 | Perforation | 3175.00 | 3175.60 | 10 |
| 2010-02-01 | Perforation | 3169.00 | 3169.30 | 10 |
| 2010-02-01 | Perforation | 3150.00 | 3150.60 | 10 |
| 2010-02-01 | Perforation | 3144.00 | 3144.30 | 10 |
| 2010-02-01 | Perforation | 3140.00 | 3140.60 | 10 |
| 2010-01-30 | Perforation | 3422.00 | 3422.60 | 10 |
| 2010-02-02 | Fracture | 3140.00 | 3179.60 | 0 |
| 2010-02-03 | Perforation | 3114.00 | 3114.60 | 10 |
| 2010-02-03 | Perforation | 3104.00 | 3104.60 | 10 |
| 2010-02-03 | Perforation | 3099.00 | 3099.60 | 10 |
| 2010-02-03 | Perforation | 3073.50 | 3074.10 | 10 |
| 2010-02-03 | Perforation | 3069.00 | 3069.30 | 10 |
| 2010-02-03 | Perforation | 3064.00 | 3064.30 | 10 |
| 2010-02-04 | Fracture | 3064.00 | 3114.60 | 0 |
| 2010-02-05 | Perforation | 2931.00 | 2932.50 | 10 |
| 2010-02-05 | Perforation | 2921.00 | 2922.50 | 10 |
| 2010-01-30 | Perforation | 3417.00 | 3417.60 | 10 |
| 2010-02-05 | Perforation | 2542.00 | 2542.90 | 10 |
| 2010-02-05 | Perforation | 2537.00 | 2537.90 | 10 |
| 2010-02-05 | Perforation | 2530.00 | 2530.90 | 10 |
| 2010-02-05 | Fracture | 2530.00 | 2932.50 | 0 |
| 2010-01-30 | Perforation | 3412.00 | 3412.60 | 10 |
| 2010-01-30 | Perforation | 3401.00 | 3401.30 | 10 |
| 2010-01-30 | Fracture | 3401.00 | 3427.90 | 0 |
| 2010-01-30 | Perforation | 3266.00 | 3266.60 | 10 |
| 2010-01-30 | Perforation | 3259.00 | 3259.60 | 10 |
| 2010-01-30 | Perforation | 3242.00 | 3242.60 | 10 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 6960 | 0.0 | 0.0 | 0.0 |
| 2011 | 8409 | 0.0 | 0.0 | 0.0 |
| 2012 | 8689 | 0.0 | 0.0 | 0.0 |
| 2013 | 8711 | 0.0 | 0.0 | 0.0 |
| 2014 | 8759 | 0.0 | 0.0 | 0.0 |
| 2015 | 8618 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 7712 | 0.0 | 0.0 | 0.0 |
| 2018 | 8572 | 0.0 | 0.0 | 0.0 |
| 2019 | 7824 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]