If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0554032116003 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/16-21-055-03W4/3 | |
Location Alias: 00/16-21-55-03 W4M | |
Location Alias 2: 00/16-21-055-03 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 055 | |
Meridian: 4 | |
Range: 03 | |
Section: 21 | |
County/Municipality: County of St. Paul No. 19 | |
Well Name: CNRL 16B FROG LK 16-21-55-3 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0464804 | |
License Date: 2014-02-07 | |
License Status: Abandoned | |
Spud Date: 2014-03-09 | |
Final Drill Date: 2014-03-12 | |
Well Total Depth: 802.00 m | |
Surface Hole Latitude: 53.765262 | |
Surface Hole Longitude: -110.383191 |
Date | Event |
---|---|
2014-02-07 | Obtained License |
2014-03-09 | Direction Drilling Operation Performed - Deviate |
2014-03-10 | Surface Casing Operation Performed |
2014-03-12 | Finished Drilling |
2014-03-12 | Well Log Performed |
2014-03-12 | Well Mode changed to Drilled and Cased |
2014-03-13 | Production Casing Operation Performed |
2014-03-13 | Rig Released |
2014-03-26 | Perforation Treatment Performed - Jet Perforation |
2014-08-06 | Perforation Treatment Performed - Jet Perforation |
2014-08-06 | Well Log Performed |
2016-03-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2016-03-22 | Perforation Treatment Performed - Jet Perforation |
2016-03-22 | Plug Back Performed |
2016-03-22 | Well Log Performed |
2017-03-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-03-07 | Plug Back Performed |
2017-03-08 | Perforation Treatment Performed - Jet Perforation |
2017-03-08 | Well Log Performed |
2017-04-01 | Well Began Production |
2017-04-01 | Well Fluid changed to Crude Bitumen |
2017-04-01 | Well Mode changed to Pumping |
2018-12-31 | Well Fluid changed to Crude Bitumen |
2018-12-31 | Well Mode changed to Suspended |
2019-09-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-09-23 | Plug Back Performed |
2019-09-23 | Well Fluid changed to Crude Bitumen |
2019-09-23 | Well Mode changed to Abandoned Zone |
2019-10-29 | Well Abandoned |
2019-10-29 | Well Fluid changed to Crude Bitumen |
2019-10-29 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2014-03-09 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-03-26 | Perforation | 779.50 | 783.00 | 26 |
2019-09-23 | Packing Device Capped w/Cement | 585.00 | 597.00 | 0 |
2014-08-06 | Perforation | 779.50 | 783.00 | 13 |
2014-08-06 | Perforation | 779.50 | 783.00 | 26 |
2014-08-06 | Perforation | 787.50 | 788.50 | 26 |
2016-03-22 | Packing Device Capped w/Cement | 760.00 | 775.00 | 0 |
2016-03-22 | Perforation | 663.00 | 667.00 | 26 |
2017-03-07 | Packing Device Capped w/Cement | 646.00 | 661.00 | 0 |
2017-03-08 | Perforation | 607.50 | 609.50 | 26 |
2017-03-08 | Perforation | 610.50 | 611.50 | 26 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 5639 | 0.0 | 0.0 | 0.0 |
2018 | 2087 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-03-13 | No Incident Encountered | 0.00 | 0.00 |
2014-03-27 | No Incident Encountered | 0.00 | 0.00 |
2014-08-10 | No Incident Encountered | 0.00 | 0.00 |
2016-03-23 | No Incident Encountered | 0.00 | 0.00 |
2017-03-09 | No Incident Encountered | 0.00 | 0.00 |
2019-09-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]